华中地区抽水蓄能电站 "十四五 "期间核准及进展分析

IF 8.9 2区 工程技术 Q1 ENERGY & FUELS
{"title":"华中地区抽水蓄能电站 \"十四五 \"期间核准及进展分析","authors":"","doi":"10.1016/j.est.2024.114104","DOIUrl":null,"url":null,"abstract":"<div><div>During the “14th Five-Year Plan” period, China's pumped storage power stations have achieved rapid development. The country approved 110 pumped storage power stations with a total installed capacity of 148.901 gigawatts, which is 2.8 times the capacity approved during the “13th Five-Year Plan” period. China has completed 70.90 % of the total capacity target of 210 gigawatts for key implementation projects during the “14th Five-Year Plan”. Pumped storage power stations in Central China are typical for their large capacity, large number of approved pumped storage power stations and rapid approval. This paper analyzes the development of pumped storage power stations in Central China, focusing on regional approval, investment ownership, design units and cost analysis. It summarizes the current development mode and provides an analysis of pumped storage development in both Central China and China as a whole. The relevant situation is of great significance for promoting the construction of pumped storage power stations and for the construction and optimization of modern power systems.</div></div>","PeriodicalId":15942,"journal":{"name":"Journal of energy storage","volume":null,"pages":null},"PeriodicalIF":8.9000,"publicationDate":"2024-10-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Approval and progress analysis of pumped storage power stations in Central China during the 14th five-year plan period\",\"authors\":\"\",\"doi\":\"10.1016/j.est.2024.114104\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>During the “14th Five-Year Plan” period, China's pumped storage power stations have achieved rapid development. The country approved 110 pumped storage power stations with a total installed capacity of 148.901 gigawatts, which is 2.8 times the capacity approved during the “13th Five-Year Plan” period. China has completed 70.90 % of the total capacity target of 210 gigawatts for key implementation projects during the “14th Five-Year Plan”. Pumped storage power stations in Central China are typical for their large capacity, large number of approved pumped storage power stations and rapid approval. This paper analyzes the development of pumped storage power stations in Central China, focusing on regional approval, investment ownership, design units and cost analysis. It summarizes the current development mode and provides an analysis of pumped storage development in both Central China and China as a whole. The relevant situation is of great significance for promoting the construction of pumped storage power stations and for the construction and optimization of modern power systems.</div></div>\",\"PeriodicalId\":15942,\"journal\":{\"name\":\"Journal of energy storage\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":8.9000,\"publicationDate\":\"2024-10-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of energy storage\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S2352152X24036909\",\"RegionNum\":2,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"ENERGY & FUELS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of energy storage","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2352152X24036909","RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0

摘要

"十四五 "期间,我国抽水蓄能电站实现了快速发展。全国共核准抽水蓄能电站 110 座,总装机容量 1489.01 亿千瓦,是 "十三五 "期间核准容量的 2.8 倍。中国已完成 "十四五 "重点实施项目总装机容量目标 210 千兆瓦的 70.90%。华中地区抽水蓄能电站具有容量大、核准数量多、核准速度快等特点。本文分析了华中地区抽水蓄能电站的发展情况,重点从区域核准、投资权属、设计单位和成本分析等方面进行了分析。它总结了当前的发展模式,并对华中地区乃至整个中国的抽水蓄能发展进行了分析。相关情况对推动抽水蓄能电站建设、构建和优化现代电力系统具有重要意义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Approval and progress analysis of pumped storage power stations in Central China during the 14th five-year plan period
During the “14th Five-Year Plan” period, China's pumped storage power stations have achieved rapid development. The country approved 110 pumped storage power stations with a total installed capacity of 148.901 gigawatts, which is 2.8 times the capacity approved during the “13th Five-Year Plan” period. China has completed 70.90 % of the total capacity target of 210 gigawatts for key implementation projects during the “14th Five-Year Plan”. Pumped storage power stations in Central China are typical for their large capacity, large number of approved pumped storage power stations and rapid approval. This paper analyzes the development of pumped storage power stations in Central China, focusing on regional approval, investment ownership, design units and cost analysis. It summarizes the current development mode and provides an analysis of pumped storage development in both Central China and China as a whole. The relevant situation is of great significance for promoting the construction of pumped storage power stations and for the construction and optimization of modern power systems.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of energy storage
Journal of energy storage Energy-Renewable Energy, Sustainability and the Environment
CiteScore
11.80
自引率
24.50%
发文量
2262
审稿时长
69 days
期刊介绍: Journal of energy storage focusses on all aspects of energy storage, in particular systems integration, electric grid integration, modelling and analysis, novel energy storage technologies, sizing and management strategies, business models for operation of storage systems and energy storage developments worldwide.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信