{"title":"通过将决策支持系统与贝叶斯信念网络分析方法相结合,开发基于情景的建筑项目风险规划优化模型:高层建筑案例研究","authors":"Sajjad Pourdoustmohammadi, Ramin Ansari","doi":"10.1007/s40996-024-01590-8","DOIUrl":null,"url":null,"abstract":"<p>With the increasing number of construction projects in modern times, there is a pressing need to effectively manage the three key aspects of a project: time, cost, and quality. Among these 3 aspects, time and cost aspects play a very important role in different stages of the project life cycle, because they can influence each other. Delays in the project can lead to increased costs, especially in countries suffering from inflation. Conversely, attempts to complete the project on time despite delays can result in a decrease in quality. Therefore, the aim of this research is to provide a risk assessment method based on Bayesian Belief network (BBN) to predict the delay and cost increase as well as the time and cost of the project and also to provide a decision support system (DSS) to determine the most suitable delay reduction strategy in terms of cost it was in construction project. The developed proposed framework was implemented in a 17-story tower and its results were compared with real data from the project. The findings show that the developed BBN has a high degree of accuracy in predicting project delays and cost overruns, and the proposed DDS can effectively determine the most suitable delay reduction strategy while keeping costs under control.</p>","PeriodicalId":14550,"journal":{"name":"Iranian Journal of Science and Technology, Transactions of Civil Engineering","volume":"13 1","pages":""},"PeriodicalIF":1.7000,"publicationDate":"2024-08-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Developing a Scenario-Based Optimization Model for Planning Risks in Construction Projects by Integrating a Decision Support System with Bayesian Belief Network Analysis Approach: A Case Study in High-Rise Buildings\",\"authors\":\"Sajjad Pourdoustmohammadi, Ramin Ansari\",\"doi\":\"10.1007/s40996-024-01590-8\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>With the increasing number of construction projects in modern times, there is a pressing need to effectively manage the three key aspects of a project: time, cost, and quality. Among these 3 aspects, time and cost aspects play a very important role in different stages of the project life cycle, because they can influence each other. Delays in the project can lead to increased costs, especially in countries suffering from inflation. Conversely, attempts to complete the project on time despite delays can result in a decrease in quality. Therefore, the aim of this research is to provide a risk assessment method based on Bayesian Belief network (BBN) to predict the delay and cost increase as well as the time and cost of the project and also to provide a decision support system (DSS) to determine the most suitable delay reduction strategy in terms of cost it was in construction project. The developed proposed framework was implemented in a 17-story tower and its results were compared with real data from the project. The findings show that the developed BBN has a high degree of accuracy in predicting project delays and cost overruns, and the proposed DDS can effectively determine the most suitable delay reduction strategy while keeping costs under control.</p>\",\"PeriodicalId\":14550,\"journal\":{\"name\":\"Iranian Journal of Science and Technology, Transactions of Civil Engineering\",\"volume\":\"13 1\",\"pages\":\"\"},\"PeriodicalIF\":1.7000,\"publicationDate\":\"2024-08-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Iranian Journal of Science and Technology, Transactions of Civil Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1007/s40996-024-01590-8\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Iranian Journal of Science and Technology, Transactions of Civil Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1007/s40996-024-01590-8","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
Developing a Scenario-Based Optimization Model for Planning Risks in Construction Projects by Integrating a Decision Support System with Bayesian Belief Network Analysis Approach: A Case Study in High-Rise Buildings
With the increasing number of construction projects in modern times, there is a pressing need to effectively manage the three key aspects of a project: time, cost, and quality. Among these 3 aspects, time and cost aspects play a very important role in different stages of the project life cycle, because they can influence each other. Delays in the project can lead to increased costs, especially in countries suffering from inflation. Conversely, attempts to complete the project on time despite delays can result in a decrease in quality. Therefore, the aim of this research is to provide a risk assessment method based on Bayesian Belief network (BBN) to predict the delay and cost increase as well as the time and cost of the project and also to provide a decision support system (DSS) to determine the most suitable delay reduction strategy in terms of cost it was in construction project. The developed proposed framework was implemented in a 17-story tower and its results were compared with real data from the project. The findings show that the developed BBN has a high degree of accuracy in predicting project delays and cost overruns, and the proposed DDS can effectively determine the most suitable delay reduction strategy while keeping costs under control.
期刊介绍:
The aim of the Iranian Journal of Science and Technology is to foster the growth of scientific research among Iranian engineers and scientists and to provide a medium by means of which the fruits of these researches may be brought to the attention of the world’s civil Engineering communities. This transaction focuses on all aspects of Civil Engineering
and will accept the original research contributions (previously unpublished) from all areas of established engineering disciplines. The papers may be theoretical, experimental or both. The journal publishes original papers within the broad field of civil engineering which include, but are not limited to, the following:
-Structural engineering-
Earthquake engineering-
Concrete engineering-
Construction management-
Steel structures-
Engineering mechanics-
Water resources engineering-
Hydraulic engineering-
Hydraulic structures-
Environmental engineering-
Soil mechanics-
Foundation engineering-
Geotechnical engineering-
Transportation engineering-
Surveying and geomatics.