{"title":"能源基础设施规划和监管过程中决策时间延长的影响","authors":"Genaro Longoria ,&nbsp;Muireann Lynch ,&nbsp;Niall Farrell ,&nbsp;John Curtis","doi":"10.1016/j.jup.2024.101824","DOIUrl":null,"url":null,"abstract":"<div><p>Effective planning and regulatory processes ensure orderly energy systems. Often, decisions are not made within mandated timeframes and discrete approval processes are infrequent. A given delay may be compounded where multiple approval processes exist in sequence. These factors can negatively affect system costs and, ultimately, consumer welfare. We show that delays have meaningful impacts on electricity prices, system emissions, infrastructure investment and system operating costs. Our numerical simulation of data from Ireland shows that wholesale electricity prices are up to 10% higher and CO<sub>2</sub> emissions up to 4% higher, attributable to delays associated with planning and regulatory approvals.</p></div>","PeriodicalId":23554,"journal":{"name":"Utilities Policy","volume":"91 ","pages":"Article 101824"},"PeriodicalIF":3.8000,"publicationDate":"2024-09-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.sciencedirect.com/science/article/pii/S0957178724001176/pdfft?md5=8907a056cec9e9de2035545f38ac1c3f&pid=1-s2.0-S0957178724001176-main.pdf","citationCount":"0","resultStr":"{\"title\":\"The impact of extended decision times in planning and regulatory processes for energy infrastructure\",\"authors\":\"Genaro Longoria ,&nbsp;Muireann Lynch ,&nbsp;Niall Farrell ,&nbsp;John Curtis\",\"doi\":\"10.1016/j.jup.2024.101824\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>Effective planning and regulatory processes ensure orderly energy systems. Often, decisions are not made within mandated timeframes and discrete approval processes are infrequent. A given delay may be compounded where multiple approval processes exist in sequence. These factors can negatively affect system costs and, ultimately, consumer welfare. We show that delays have meaningful impacts on electricity prices, system emissions, infrastructure investment and system operating costs. Our numerical simulation of data from Ireland shows that wholesale electricity prices are up to 10% higher and CO<sub>2</sub> emissions up to 4% higher, attributable to delays associated with planning and regulatory approvals.</p></div>\",\"PeriodicalId\":23554,\"journal\":{\"name\":\"Utilities Policy\",\"volume\":\"91 \",\"pages\":\"Article 101824\"},\"PeriodicalIF\":3.8000,\"publicationDate\":\"2024-09-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://www.sciencedirect.com/science/article/pii/S0957178724001176/pdfft?md5=8907a056cec9e9de2035545f38ac1c3f&pid=1-s2.0-S0957178724001176-main.pdf\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Utilities Policy\",\"FirstCategoryId\":\"96\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0957178724001176\",\"RegionNum\":3,\"RegionCategory\":\"经济学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENERGY & FUELS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Utilities Policy","FirstCategoryId":"96","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0957178724001176","RegionNum":3,"RegionCategory":"经济学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0

摘要

有效的规划和监管程序可确保能源系统有序运行。通常情况下,决策并不是在规定的时限内做出的,离散的审批程序也不常见。如果多个审批程序依次进行,则可能会加剧特定的延迟。这些因素会对系统成本产生负面影响,并最终影响消费者福利。我们的研究表明,延迟会对电价、系统排放、基础设施投资和系统运营成本产生重大影响。我们对爱尔兰的数据进行了数值模拟,结果显示,由于规划和监管审批的延误,批发电价最高会上涨 10%,二氧化碳排放量最高会增加 4%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The impact of extended decision times in planning and regulatory processes for energy infrastructure

Effective planning and regulatory processes ensure orderly energy systems. Often, decisions are not made within mandated timeframes and discrete approval processes are infrequent. A given delay may be compounded where multiple approval processes exist in sequence. These factors can negatively affect system costs and, ultimately, consumer welfare. We show that delays have meaningful impacts on electricity prices, system emissions, infrastructure investment and system operating costs. Our numerical simulation of data from Ireland shows that wholesale electricity prices are up to 10% higher and CO2 emissions up to 4% higher, attributable to delays associated with planning and regulatory approvals.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Utilities Policy
Utilities Policy ENERGY & FUELS-ENVIRONMENTAL SCIENCES
CiteScore
6.80
自引率
10.00%
发文量
94
审稿时长
66 days
期刊介绍: Utilities Policy is deliberately international, interdisciplinary, and intersectoral. Articles address utility trends and issues in both developed and developing economies. Authors and reviewers come from various disciplines, including economics, political science, sociology, law, finance, accounting, management, and engineering. Areas of focus include the utility and network industries providing essential electricity, natural gas, water and wastewater, solid waste, communications, broadband, postal, and public transportation services. Utilities Policy invites submissions that apply various quantitative and qualitative methods. Contributions are welcome from both established and emerging scholars as well as accomplished practitioners. Interdisciplinary, comparative, and applied works are encouraged. Submissions to the journal should have a clear focus on governance, performance, and/or analysis of public utilities with an aim toward informing the policymaking process and providing recommendations as appropriate. Relevant topics and issues include but are not limited to industry structures and ownership, market design and dynamics, economic development, resource planning, system modeling, accounting and finance, infrastructure investment, supply and demand efficiency, strategic management and productivity, network operations and integration, supply chains, adaptation and flexibility, service-quality standards, benchmarking and metrics, benefit-cost analysis, behavior and incentives, pricing and demand response, economic and environmental regulation, regulatory performance and impact, restructuring and deregulation, and policy institutions.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信