D. Baillard, E. Grenier-Boley, M. Dole, F. Deslande, R. Froeschl, T. Lorenzon, P. Moyret, R. Peron, A. Pilan Zanoni, C. Sharp, M. Timmins, M. Calviani
{"title":"设计、开发和建造欧洲核子研究中心(CERN)喷射器综合设施的新光束止动器","authors":"D. Baillard, E. Grenier-Boley, M. Dole, F. Deslande, R. Froeschl, T. Lorenzon, P. Moyret, R. Peron, A. Pilan Zanoni, C. Sharp, M. Timmins, M. Calviani","doi":"arxiv-2408.01074","DOIUrl":null,"url":null,"abstract":"Beam stoppers are installed in the transfer lines of the CERN accelerator\ncomplex; these components are used as part of the access safety system, which\nguarantees the safety of workers in the accelerators. They are designed to stop\none or at most a few pulses of the beam, where \"stop\" means the partial or\ncomplete absorption of the primary beam in such a way that the remaining\nunabsorbed primary or secondary beam remains below a specified threshold, as\ndefined by the needs of radiation protection. Prior to Long Shutdown 2 (LS2;\n2018--2021), beam stoppers in the injector complex were dimensioned for\nbeam-pulse energies between 9.0 and 30~kJ. The upgrade of the accelerator\ncomplex in the framework of the LHC Injectors Upgrade (LIU) project involves\nbeam-pulse energies of up to 92.5~kJ, meaning that these beam stoppers are not\nable to fulfill the new functional specifications. To cope with the LIU beam\nparameters and fulfil requirements for safety, maintainability, efficiency, and\nreliability, a new generation of 28 beam stoppers has been designed, built, and\ninstalled. The aim of this paper is to demonstrate the requirements-driven\ndesign of these new beam stoppers, outlining the main requirements along with a\ndescription of the design and structural assessments. This document presents\nthe implementation and integration of a standardized but adaptable design using\na unique 564-mm-long stopper core with a CuCr1Zr absorber and an Inconel~718\ndiluter, taking into account radiological and infrastructure challenges. The\ninstallation process is also described, and the first operational feedback\nreceived since LS2 is presented.","PeriodicalId":501374,"journal":{"name":"arXiv - PHYS - Instrumentation and Detectors","volume":"86 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-08-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Design, development, and construction of the new beam stoppers for CERN's injector complex\",\"authors\":\"D. Baillard, E. Grenier-Boley, M. Dole, F. Deslande, R. Froeschl, T. Lorenzon, P. Moyret, R. Peron, A. Pilan Zanoni, C. Sharp, M. Timmins, M. Calviani\",\"doi\":\"arxiv-2408.01074\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Beam stoppers are installed in the transfer lines of the CERN accelerator\\ncomplex; these components are used as part of the access safety system, which\\nguarantees the safety of workers in the accelerators. They are designed to stop\\none or at most a few pulses of the beam, where \\\"stop\\\" means the partial or\\ncomplete absorption of the primary beam in such a way that the remaining\\nunabsorbed primary or secondary beam remains below a specified threshold, as\\ndefined by the needs of radiation protection. Prior to Long Shutdown 2 (LS2;\\n2018--2021), beam stoppers in the injector complex were dimensioned for\\nbeam-pulse energies between 9.0 and 30~kJ. The upgrade of the accelerator\\ncomplex in the framework of the LHC Injectors Upgrade (LIU) project involves\\nbeam-pulse energies of up to 92.5~kJ, meaning that these beam stoppers are not\\nable to fulfill the new functional specifications. To cope with the LIU beam\\nparameters and fulfil requirements for safety, maintainability, efficiency, and\\nreliability, a new generation of 28 beam stoppers has been designed, built, and\\ninstalled. The aim of this paper is to demonstrate the requirements-driven\\ndesign of these new beam stoppers, outlining the main requirements along with a\\ndescription of the design and structural assessments. This document presents\\nthe implementation and integration of a standardized but adaptable design using\\na unique 564-mm-long stopper core with a CuCr1Zr absorber and an Inconel~718\\ndiluter, taking into account radiological and infrastructure challenges. The\\ninstallation process is also described, and the first operational feedback\\nreceived since LS2 is presented.\",\"PeriodicalId\":501374,\"journal\":{\"name\":\"arXiv - PHYS - Instrumentation and Detectors\",\"volume\":\"86 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-08-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"arXiv - PHYS - Instrumentation and Detectors\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/arxiv-2408.01074\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"arXiv - PHYS - Instrumentation and Detectors","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/arxiv-2408.01074","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Design, development, and construction of the new beam stoppers for CERN's injector complex
Beam stoppers are installed in the transfer lines of the CERN accelerator
complex; these components are used as part of the access safety system, which
guarantees the safety of workers in the accelerators. They are designed to stop
one or at most a few pulses of the beam, where "stop" means the partial or
complete absorption of the primary beam in such a way that the remaining
unabsorbed primary or secondary beam remains below a specified threshold, as
defined by the needs of radiation protection. Prior to Long Shutdown 2 (LS2;
2018--2021), beam stoppers in the injector complex were dimensioned for
beam-pulse energies between 9.0 and 30~kJ. The upgrade of the accelerator
complex in the framework of the LHC Injectors Upgrade (LIU) project involves
beam-pulse energies of up to 92.5~kJ, meaning that these beam stoppers are not
able to fulfill the new functional specifications. To cope with the LIU beam
parameters and fulfil requirements for safety, maintainability, efficiency, and
reliability, a new generation of 28 beam stoppers has been designed, built, and
installed. The aim of this paper is to demonstrate the requirements-driven
design of these new beam stoppers, outlining the main requirements along with a
description of the design and structural assessments. This document presents
the implementation and integration of a standardized but adaptable design using
a unique 564-mm-long stopper core with a CuCr1Zr absorber and an Inconel~718
diluter, taking into account radiological and infrastructure challenges. The
installation process is also described, and the first operational feedback
received since LS2 is presented.