铁路基础设施计划中断期间的铁路运营管理

IF 2.7 Q2 CONSTRUCTION & BUILDING TECHNOLOGY
Zdenka Bulková, Jozef Gašparík, Vladislav Zitrický
{"title":"铁路基础设施计划中断期间的铁路运营管理","authors":"Zdenka Bulková, Jozef Gašparík, Vladislav Zitrický","doi":"10.3390/infrastructures9070119","DOIUrl":null,"url":null,"abstract":"A planned interruption of railway infrastructure is a situation where the operation of the track line or the operation of railway transport is limited. If there is also a restriction on the railway infrastructure, it means there will be complications not only for passengers but, above all, for railway undertakings operating freight transport. However, because of the planned railway infrastructure interruption, the quality of services provided not only to passengers but also to freight transport is decreasing. The aim of this paper is to propose effective planned maintenance works based on the analysis and evaluation of the processes performed during the planned railway infrastructure interruption or restriction. The research describes the process of affected railway infrastructure from technical, cost, and safety points of view. A methodological procedure is proposed under the condition of the Czech infrastructure manager. The main method is the calculation of the costs for the railway infrastructure manager and railway operator during the infrastructure interruption. The application part is undertaken using two interrupted lines according to the established alternative timetable in the area of České Budějovice.","PeriodicalId":13601,"journal":{"name":"Infrastructures","volume":null,"pages":null},"PeriodicalIF":2.7000,"publicationDate":"2024-07-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Management of Railway Operations during the Planned Interruption of Railway Infrastructure\",\"authors\":\"Zdenka Bulková, Jozef Gašparík, Vladislav Zitrický\",\"doi\":\"10.3390/infrastructures9070119\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A planned interruption of railway infrastructure is a situation where the operation of the track line or the operation of railway transport is limited. If there is also a restriction on the railway infrastructure, it means there will be complications not only for passengers but, above all, for railway undertakings operating freight transport. However, because of the planned railway infrastructure interruption, the quality of services provided not only to passengers but also to freight transport is decreasing. The aim of this paper is to propose effective planned maintenance works based on the analysis and evaluation of the processes performed during the planned railway infrastructure interruption or restriction. The research describes the process of affected railway infrastructure from technical, cost, and safety points of view. A methodological procedure is proposed under the condition of the Czech infrastructure manager. The main method is the calculation of the costs for the railway infrastructure manager and railway operator during the infrastructure interruption. The application part is undertaken using two interrupted lines according to the established alternative timetable in the area of České Budějovice.\",\"PeriodicalId\":13601,\"journal\":{\"name\":\"Infrastructures\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":2.7000,\"publicationDate\":\"2024-07-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Infrastructures\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3390/infrastructures9070119\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Infrastructures","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3390/infrastructures9070119","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

摘要

铁路基础设施的计划中断是指轨道线路的运行或铁路运输的运行受到限制。如果铁路基础设施也受到限制,这意味着不仅对乘客,尤其是对经营货物运输的铁路企业来说,都会出现复杂情况。然而,由于计划中的铁路基础设施中断,不仅为乘客提供的服务质量在下降,而且为货运提供的服务质量也在下降。本文旨在根据对计划中的铁路基础设施中断或限制过程的分析和评估,提出有效的计划维护工程。研究从技术、成本和安全角度描述了受影响铁路基础设施的过程。在捷克基础设施管理者的条件下,提出了一套方法程序。主要方法是计算基础设施中断期间铁路基础设施管理者和铁路运营商的成本。应用部分是根据捷克布杰约维采地区既定的备选时间表,利用两条中断的线路进行的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Management of Railway Operations during the Planned Interruption of Railway Infrastructure
A planned interruption of railway infrastructure is a situation where the operation of the track line or the operation of railway transport is limited. If there is also a restriction on the railway infrastructure, it means there will be complications not only for passengers but, above all, for railway undertakings operating freight transport. However, because of the planned railway infrastructure interruption, the quality of services provided not only to passengers but also to freight transport is decreasing. The aim of this paper is to propose effective planned maintenance works based on the analysis and evaluation of the processes performed during the planned railway infrastructure interruption or restriction. The research describes the process of affected railway infrastructure from technical, cost, and safety points of view. A methodological procedure is proposed under the condition of the Czech infrastructure manager. The main method is the calculation of the costs for the railway infrastructure manager and railway operator during the infrastructure interruption. The application part is undertaken using two interrupted lines according to the established alternative timetable in the area of České Budějovice.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Infrastructures
Infrastructures Engineering-Building and Construction
CiteScore
5.20
自引率
7.70%
发文量
145
审稿时长
11 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信