PT Wijaya Karya Bangunan Gedung Tbk.哈利姆高速列车建设项目

Yenny Frisca Madhona, Hanifah Handayani, Sri Dinda Khairunisa
{"title":"PT Wijaya Karya Bangunan Gedung Tbk.哈利姆高速列车建设项目","authors":"Yenny Frisca Madhona, Hanifah Handayani, Sri Dinda Khairunisa","doi":"10.58344/jmi.v3i7.1646","DOIUrl":null,"url":null,"abstract":"PT Wijaya karya Bangunan Gedung Tbk. Halim High-Speed Train Project is a company engaged in construction, investment, and concessions. Engaged in the construction sector certainly has a high potential for danger and danger factors. One of them was an accident caused by working at a height. Therefore, it is important to control the danger of working at height to prevent and control the danger of height. This study uses field observation methods, literature studies, and interviews to determine how the hazard control program works at height. The hazard control program for working at height at PT Wijaya Karya Bangunan Gedung Tbk, Halim High-Speed Train Project has been by the regulation of the Minister of Manpower No. 9 of 2016, among others. Fit to work, toolbox meeting inspection, Scaffolding and Full Body Harness. At PT Wijaya Karya Bangunan Gedung Tbk, The halim high-speed train project has procedures related to the Control of work hazards at height, namely the height work safety procedure No. WIKA-BG-PDSMM-IK-26. PT Wijaya Karya Bangunan Gedung Tbk. Halim High-Speed Train Project, but there are still problems related to the lack of supervision of work safety equipment and lack of training for workers related to high-altitude work.","PeriodicalId":509415,"journal":{"name":"Jurnal Multidisiplin Indonesia","volume":"63 12","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-07-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Hazard Control Working at Height at PT Wijaya Karya Bangunan Gedung Tbk. Halim High-Speed Train Construction Project\",\"authors\":\"Yenny Frisca Madhona, Hanifah Handayani, Sri Dinda Khairunisa\",\"doi\":\"10.58344/jmi.v3i7.1646\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PT Wijaya karya Bangunan Gedung Tbk. Halim High-Speed Train Project is a company engaged in construction, investment, and concessions. Engaged in the construction sector certainly has a high potential for danger and danger factors. One of them was an accident caused by working at a height. Therefore, it is important to control the danger of working at height to prevent and control the danger of height. This study uses field observation methods, literature studies, and interviews to determine how the hazard control program works at height. The hazard control program for working at height at PT Wijaya Karya Bangunan Gedung Tbk, Halim High-Speed Train Project has been by the regulation of the Minister of Manpower No. 9 of 2016, among others. Fit to work, toolbox meeting inspection, Scaffolding and Full Body Harness. At PT Wijaya Karya Bangunan Gedung Tbk, The halim high-speed train project has procedures related to the Control of work hazards at height, namely the height work safety procedure No. WIKA-BG-PDSMM-IK-26. PT Wijaya Karya Bangunan Gedung Tbk. Halim High-Speed Train Project, but there are still problems related to the lack of supervision of work safety equipment and lack of training for workers related to high-altitude work.\",\"PeriodicalId\":509415,\"journal\":{\"name\":\"Jurnal Multidisiplin Indonesia\",\"volume\":\"63 12\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-07-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Multidisiplin Indonesia\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.58344/jmi.v3i7.1646\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Multidisiplin Indonesia","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.58344/jmi.v3i7.1646","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

PT Wijaya karya Bangunan Gedung Tbk.哈利姆高速列车项目是一家从事建筑、投资和特许经营的公司。从事建筑行业当然有很大的潜在危险和危险因素。其中之一就是高空作业引发的事故。因此,控制高空作业的危险性,预防和控制高空作业的危险就显得尤为重要。本研究采用实地观察法、文献研究法和访谈法来确定高空作业危险控制计划是如何运作的。PT Wijaya Karya Bangunan Gedung Tbk,Halim 高速列车项目的高空作业危险控制计划由人力部长 2016 年第 9 号条例等规定。适合工作、工具箱会议检查、脚手架和全身安全带。在PT Wijaya Karya Bangunan Gedung Tbk公司,哈林高速列车项目有与高空作业危险控制相关的程序,即编号为WIKA-BG-PDSMM-IK-26的高空作业安全程序。PT Wijaya Karya Bangunan Gedung Tbk.哈利姆高速列车项目,但仍存在缺乏对工作安全设备的监督和缺乏对工人进行高空作业培训的问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Hazard Control Working at Height at PT Wijaya Karya Bangunan Gedung Tbk. Halim High-Speed Train Construction Project
PT Wijaya karya Bangunan Gedung Tbk. Halim High-Speed Train Project is a company engaged in construction, investment, and concessions. Engaged in the construction sector certainly has a high potential for danger and danger factors. One of them was an accident caused by working at a height. Therefore, it is important to control the danger of working at height to prevent and control the danger of height. This study uses field observation methods, literature studies, and interviews to determine how the hazard control program works at height. The hazard control program for working at height at PT Wijaya Karya Bangunan Gedung Tbk, Halim High-Speed Train Project has been by the regulation of the Minister of Manpower No. 9 of 2016, among others. Fit to work, toolbox meeting inspection, Scaffolding and Full Body Harness. At PT Wijaya Karya Bangunan Gedung Tbk, The halim high-speed train project has procedures related to the Control of work hazards at height, namely the height work safety procedure No. WIKA-BG-PDSMM-IK-26. PT Wijaya Karya Bangunan Gedung Tbk. Halim High-Speed Train Project, but there are still problems related to the lack of supervision of work safety equipment and lack of training for workers related to high-altitude work.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信