{"title":"COHRISK:核电厂多重危害风险量化软件综述","authors":"Eujeong Choi ,&nbsp;Shinyoung Kwag ,&nbsp;Jung-Han Kim ,&nbsp;Jeong-Gon Ha ,&nbsp;Daegi Hahm ,&nbsp;Minkyu Kim","doi":"10.1016/j.net.2024.07.035","DOIUrl":null,"url":null,"abstract":"<div><div>A combination of more than one natural hazard can occur simultaneously by their inherent correlation or by coincidence. One well-known multihazard incident, the Tohoku earthquake-tsunami in Japan 2011, led to a core damage accident at the Fukushima Daiichi nuclear power plant (NPP) and caused significant damage to its community. But despite this accident raising significant awareness of multihazard safety in the nuclear safety engineering community, multihazard risk quantification methods and tools for NPPs are relatively less investigated when compared to those for single hazards. At the same time, some multihazard tools developed outside the nuclear engineering industry are inadequate for extension to NPPs because of the complex NPP systems and the response correlation between the systems, structures, and components. To resolve this problem, the authors have been conducting a series of projects on developing a method for multihazard risk quantification of NPP systems and have launched the related quantification software, Combined Hazard RISK (COHRISK). This paper presents a review of COHRISK including its conceptual background, methodology development, architecture, and future work.</div></div>","PeriodicalId":19272,"journal":{"name":"Nuclear Engineering and Technology","volume":"56 12","pages":"Pages 5281-5290"},"PeriodicalIF":2.6000,"publicationDate":"2024-07-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A review of COHRISK: Multihazard risk quantification software for nuclear power plants\",\"authors\":\"Eujeong Choi ,&nbsp;Shinyoung Kwag ,&nbsp;Jung-Han Kim ,&nbsp;Jeong-Gon Ha ,&nbsp;Daegi Hahm ,&nbsp;Minkyu Kim\",\"doi\":\"10.1016/j.net.2024.07.035\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>A combination of more than one natural hazard can occur simultaneously by their inherent correlation or by coincidence. One well-known multihazard incident, the Tohoku earthquake-tsunami in Japan 2011, led to a core damage accident at the Fukushima Daiichi nuclear power plant (NPP) and caused significant damage to its community. But despite this accident raising significant awareness of multihazard safety in the nuclear safety engineering community, multihazard risk quantification methods and tools for NPPs are relatively less investigated when compared to those for single hazards. At the same time, some multihazard tools developed outside the nuclear engineering industry are inadequate for extension to NPPs because of the complex NPP systems and the response correlation between the systems, structures, and components. To resolve this problem, the authors have been conducting a series of projects on developing a method for multihazard risk quantification of NPP systems and have launched the related quantification software, Combined Hazard RISK (COHRISK). This paper presents a review of COHRISK including its conceptual background, methodology development, architecture, and future work.</div></div>\",\"PeriodicalId\":19272,\"journal\":{\"name\":\"Nuclear Engineering and Technology\",\"volume\":\"56 12\",\"pages\":\"Pages 5281-5290\"},\"PeriodicalIF\":2.6000,\"publicationDate\":\"2024-07-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Nuclear Engineering and Technology\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S1738573324003516\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"NUCLEAR SCIENCE & TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Nuclear Engineering and Technology","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S1738573324003516","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"NUCLEAR SCIENCE & TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

摘要

一种以上自然灾害的组合可能因其固有的相关性或巧合而同时发生。一个众所周知的多重危害事件是 2011 年的日本东北地震-海啸,它导致福岛第一核电站(NPP)发生堆芯损坏事故,并对其社区造成了重大损失。尽管这次事故提高了核安全工程界对多重危害安全的认识,但与针对单一危害的方法和工具相比,针对核电站的多重危害风险量化方法和工具的研究相对较少。同时,由于核电厂系统复杂,系统、结构和部件之间存在响应相关性,核工程行业以外开发的一些多重危害工具不足以推广到核电厂。为解决这一问题,作者开展了一系列项目,开发核电站系统多危害风险量化方法,并推出了相关量化软件--组合危害风险软件(COHRISK)。本文对 COHRISK 进行了综述,包括其概念背景、方法开发、架构和未来工作。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A review of COHRISK: Multihazard risk quantification software for nuclear power plants
A combination of more than one natural hazard can occur simultaneously by their inherent correlation or by coincidence. One well-known multihazard incident, the Tohoku earthquake-tsunami in Japan 2011, led to a core damage accident at the Fukushima Daiichi nuclear power plant (NPP) and caused significant damage to its community. But despite this accident raising significant awareness of multihazard safety in the nuclear safety engineering community, multihazard risk quantification methods and tools for NPPs are relatively less investigated when compared to those for single hazards. At the same time, some multihazard tools developed outside the nuclear engineering industry are inadequate for extension to NPPs because of the complex NPP systems and the response correlation between the systems, structures, and components. To resolve this problem, the authors have been conducting a series of projects on developing a method for multihazard risk quantification of NPP systems and have launched the related quantification software, Combined Hazard RISK (COHRISK). This paper presents a review of COHRISK including its conceptual background, methodology development, architecture, and future work.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Nuclear Engineering and Technology
Nuclear Engineering and Technology 工程技术-核科学技术
CiteScore
4.80
自引率
7.40%
发文量
431
审稿时长
3.5 months
期刊介绍: Nuclear Engineering and Technology (NET), an international journal of the Korean Nuclear Society (KNS), publishes peer-reviewed papers on original research, ideas and developments in all areas of the field of nuclear science and technology. NET bimonthly publishes original articles, reviews, and technical notes. The journal is listed in the Science Citation Index Expanded (SCIE) of Thomson Reuters. NET covers all fields for peaceful utilization of nuclear energy and radiation as follows: 1) Reactor Physics 2) Thermal Hydraulics 3) Nuclear Safety 4) Nuclear I&C 5) Nuclear Physics, Fusion, and Laser Technology 6) Nuclear Fuel Cycle and Radioactive Waste Management 7) Nuclear Fuel and Reactor Materials 8) Radiation Application 9) Radiation Protection 10) Nuclear Structural Analysis and Plant Management & Maintenance 11) Nuclear Policy, Economics, and Human Resource Development
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信