{"title":"基于复合优先规则的多项目调度模拟方法","authors":"Pablo Alvarez-Campana, Felix Villafanez, Fernando Acebes, David Poza","doi":"arxiv-2406.02102","DOIUrl":null,"url":null,"abstract":"This paper presents a simulation approach to enhance the performance of\nheuristics for multi-project scheduling. Unlike other heuristics available in\nthe literature that use only one priority criterion for resource allocation,\nthis paper proposes a structured way to sequentially apply more than one\npriority criterion for this purpose. By means of simulation, different feasible\nschedules are obtained to, therefore, increase the probability of finding the\nschedule with the shortest duration. The performance of this simulation\napproach was validated with the MPSPLib library, one of the most prominent\nlibraries for resource-constrained multi-project scheduling. These results\nhighlight the proposed method as a useful option for addressing limited time\nand resources in portfolio management.","PeriodicalId":501045,"journal":{"name":"arXiv - QuantFin - Portfolio Management","volume":"8 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-06-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Simulation-based approach for Multiproject Scheduling based on composite priority rules\",\"authors\":\"Pablo Alvarez-Campana, Felix Villafanez, Fernando Acebes, David Poza\",\"doi\":\"arxiv-2406.02102\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents a simulation approach to enhance the performance of\\nheuristics for multi-project scheduling. Unlike other heuristics available in\\nthe literature that use only one priority criterion for resource allocation,\\nthis paper proposes a structured way to sequentially apply more than one\\npriority criterion for this purpose. By means of simulation, different feasible\\nschedules are obtained to, therefore, increase the probability of finding the\\nschedule with the shortest duration. The performance of this simulation\\napproach was validated with the MPSPLib library, one of the most prominent\\nlibraries for resource-constrained multi-project scheduling. These results\\nhighlight the proposed method as a useful option for addressing limited time\\nand resources in portfolio management.\",\"PeriodicalId\":501045,\"journal\":{\"name\":\"arXiv - QuantFin - Portfolio Management\",\"volume\":\"8 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-06-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"arXiv - QuantFin - Portfolio Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/arxiv-2406.02102\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"arXiv - QuantFin - Portfolio Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/arxiv-2406.02102","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文介绍了一种提高多项目调度启发式方法性能的模拟方法。与文献中仅使用一种优先级标准进行资源分配的其他启发式方法不同,本文提出了一种结构化方法,可为此目的顺序应用多个优先级标准。通过模拟,可以得到不同的可行时间表,从而提高找到工期最短的时间表的概率。这种模拟方法的性能通过 MPSPLib 库进行了验证,该库是资源受限多项目调度的最著名库之一。这些结果表明,所提出的方法是解决项目组合管理中时间和资源有限问题的有效选择。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Simulation-based approach for Multiproject Scheduling based on composite priority rules
This paper presents a simulation approach to enhance the performance of heuristics for multi-project scheduling. Unlike other heuristics available in the literature that use only one priority criterion for resource allocation, this paper proposes a structured way to sequentially apply more than one priority criterion for this purpose. By means of simulation, different feasible schedules are obtained to, therefore, increase the probability of finding the schedule with the shortest duration. The performance of this simulation approach was validated with the MPSPLib library, one of the most prominent libraries for resource-constrained multi-project scheduling. These results highlight the proposed method as a useful option for addressing limited time and resources in portfolio management.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信