电力系统多代理协调调度的投影和分解方法

IF 5.7 1区 工程技术 Q1 ENGINEERING, ELECTRICAL & ELECTRONIC
Haifeng Qiu;Zhigang Li;Hongjun Gao;Hung Dinh Nguyen;Veerapandiyan Veerasamy;Hoay Beng Gooi
{"title":"电力系统多代理协调调度的投影和分解方法","authors":"Haifeng Qiu;Zhigang Li;Hongjun Gao;Hung Dinh Nguyen;Veerapandiyan Veerasamy;Hoay Beng Gooi","doi":"10.35833/MPCE.2023.000422","DOIUrl":null,"url":null,"abstract":"Aiming at multi-agent coordinated scheduling problems in power systems under uncertainty, a generic projection and decomposition (P&D) approach is proposed in this letter. The canonical min-max-min two-stage robust optimization (TSRO) model with coupling constraints is equivalent to a concise robust optimization (RO) model in the version of mixed-integer linear programming (MILP) via feasible region projection. The decentralized decoupling of the non-convex MILP problem is realized through a dual decomposition algorithm, which ensures the fast convergence to a high-quality solution in the distributed optimization. Numerical tests verify the superior performance of the proposed P&D approach over the existing distributed TSRO method.","PeriodicalId":51326,"journal":{"name":"Journal of Modern Power Systems and Clean Energy","volume":"12 3","pages":"991-996"},"PeriodicalIF":5.7000,"publicationDate":"2023-12-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=10347009","citationCount":"0","resultStr":"{\"title\":\"A Projection and Decomposition Approach for Multi-Agent Coordinated Scheduling in Power Systems\",\"authors\":\"Haifeng Qiu;Zhigang Li;Hongjun Gao;Hung Dinh Nguyen;Veerapandiyan Veerasamy;Hoay Beng Gooi\",\"doi\":\"10.35833/MPCE.2023.000422\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Aiming at multi-agent coordinated scheduling problems in power systems under uncertainty, a generic projection and decomposition (P&D) approach is proposed in this letter. The canonical min-max-min two-stage robust optimization (TSRO) model with coupling constraints is equivalent to a concise robust optimization (RO) model in the version of mixed-integer linear programming (MILP) via feasible region projection. The decentralized decoupling of the non-convex MILP problem is realized through a dual decomposition algorithm, which ensures the fast convergence to a high-quality solution in the distributed optimization. Numerical tests verify the superior performance of the proposed P&D approach over the existing distributed TSRO method.\",\"PeriodicalId\":51326,\"journal\":{\"name\":\"Journal of Modern Power Systems and Clean Energy\",\"volume\":\"12 3\",\"pages\":\"991-996\"},\"PeriodicalIF\":5.7000,\"publicationDate\":\"2023-12-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=10347009\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Modern Power Systems and Clean Energy\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://ieeexplore.ieee.org/document/10347009/\",\"RegionNum\":1,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"ENGINEERING, ELECTRICAL & ELECTRONIC\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Modern Power Systems and Clean Energy","FirstCategoryId":"5","ListUrlMain":"https://ieeexplore.ieee.org/document/10347009/","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
引用次数: 0

摘要

针对不确定条件下电力系统中的多代理协调调度问题,本文提出了一种通用的投影与分解(P&D)方法。通过可行区域投影,带有耦合约束的典型最小-最大-最小两阶段鲁棒优化(TSRO)模型等价于混合整数线性规划(MILP)版本中的简明鲁棒优化(RO)模型。通过对偶分解算法实现了非凸 MILP 问题的分散解耦,从而确保在分布式优化中快速收敛到高质量解。数值测试验证了所提出的 P&D 方法优于现有的分布式 TSRO 方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A Projection and Decomposition Approach for Multi-Agent Coordinated Scheduling in Power Systems
Aiming at multi-agent coordinated scheduling problems in power systems under uncertainty, a generic projection and decomposition (P&D) approach is proposed in this letter. The canonical min-max-min two-stage robust optimization (TSRO) model with coupling constraints is equivalent to a concise robust optimization (RO) model in the version of mixed-integer linear programming (MILP) via feasible region projection. The decentralized decoupling of the non-convex MILP problem is realized through a dual decomposition algorithm, which ensures the fast convergence to a high-quality solution in the distributed optimization. Numerical tests verify the superior performance of the proposed P&D approach over the existing distributed TSRO method.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Modern Power Systems and Clean Energy
Journal of Modern Power Systems and Clean Energy ENGINEERING, ELECTRICAL & ELECTRONIC-
CiteScore
12.30
自引率
14.30%
发文量
97
审稿时长
13 weeks
期刊介绍: Journal of Modern Power Systems and Clean Energy (MPCE), commencing from June, 2013, is a newly established, peer-reviewed and quarterly published journal in English. It is the first international power engineering journal originated in mainland China. MPCE publishes original papers, short letters and review articles in the field of modern power systems with focus on smart grid technology and renewable energy integration, etc.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信