公路路边滑坡稳定性分析和管理研究

Zhiqiang Chen
{"title":"公路路边滑坡稳定性分析和管理研究","authors":"Zhiqiang Chen","doi":"10.61935/acetr.2.1.2024.p250","DOIUrl":null,"url":null,"abstract":"In order to manage the landslide on the side of a highway, the main sliding surface of the slope was determined by combining the monitoring data; and the finite element model was constructed to analyze the stress field and displacement field of the slope, and it was determined that the stability coefficient of the slope before the reinforcement did not satisfy the requirements of the engineering specification, and it was in the state of understability; the reinforcement scheme of \"double-row skid-resistant piles + intercepting and draining Based on the analysis results and experts' opinions, the \"double-row anti-slip pile + cut-off drainage\" reinforcement scheme is formulated, and numerical analysis is used to analyze the stress and displacement changes of the reinforced slope and anti-slip pile, which verifies the feasibility of the reinforcement scheme. The research results show that: (1) the stability coefficient of the main slip surface of the slope before reinforcement is 0.913, which does not meet the requirements of engineering specifications. (2) The plastic deformation around the anti-slip pile after reinforcement is obviously reduced relative to that before reinforcement, indicating that the reinforcement scheme is effective. (3) The stability coefficient of the main section after reinforcement is improved by 30% relative to that before reinforcement, indicating that the reinforcement scheme is feasible.","PeriodicalId":503577,"journal":{"name":"Advances in Computer and Engineering Technology Research","volume":" 5","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-04-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Highway roadside landslide stability analysis and management research\",\"authors\":\"Zhiqiang Chen\",\"doi\":\"10.61935/acetr.2.1.2024.p250\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In order to manage the landslide on the side of a highway, the main sliding surface of the slope was determined by combining the monitoring data; and the finite element model was constructed to analyze the stress field and displacement field of the slope, and it was determined that the stability coefficient of the slope before the reinforcement did not satisfy the requirements of the engineering specification, and it was in the state of understability; the reinforcement scheme of \\\"double-row skid-resistant piles + intercepting and draining Based on the analysis results and experts' opinions, the \\\"double-row anti-slip pile + cut-off drainage\\\" reinforcement scheme is formulated, and numerical analysis is used to analyze the stress and displacement changes of the reinforced slope and anti-slip pile, which verifies the feasibility of the reinforcement scheme. The research results show that: (1) the stability coefficient of the main slip surface of the slope before reinforcement is 0.913, which does not meet the requirements of engineering specifications. (2) The plastic deformation around the anti-slip pile after reinforcement is obviously reduced relative to that before reinforcement, indicating that the reinforcement scheme is effective. (3) The stability coefficient of the main section after reinforcement is improved by 30% relative to that before reinforcement, indicating that the reinforcement scheme is feasible.\",\"PeriodicalId\":503577,\"journal\":{\"name\":\"Advances in Computer and Engineering Technology Research\",\"volume\":\" 5\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-04-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Advances in Computer and Engineering Technology Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.61935/acetr.2.1.2024.p250\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Advances in Computer and Engineering Technology Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.61935/acetr.2.1.2024.p250","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

为治理某高速公路边坡滑坡,结合监测数据确定了边坡的主要滑动面,并构建有限元模型对边坡的应力场和位移场进行分析,确定加固前边坡的稳定系数不满足工程规范要求,处于欠稳状态;双排抗滑桩+截排水 "加固方案 根据分析结果和专家意见,制定了 "双排抗滑桩+截排水 "加固方案,并采用数值分析方法对加固后的边坡和抗滑桩的应力和位移变化进行了分析,验证了加固方案的可行性。研究结果表明(1)加固前边坡主滑面的稳定系数为 0.913,不符合工程规范要求。(2)加固后抗滑桩周围的塑性变形比加固前明显减小,说明加固方案是有效的。(3)加固后主截面的稳定系数比加固前提高了 30%,说明加固方案是可行的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Highway roadside landslide stability analysis and management research
In order to manage the landslide on the side of a highway, the main sliding surface of the slope was determined by combining the monitoring data; and the finite element model was constructed to analyze the stress field and displacement field of the slope, and it was determined that the stability coefficient of the slope before the reinforcement did not satisfy the requirements of the engineering specification, and it was in the state of understability; the reinforcement scheme of "double-row skid-resistant piles + intercepting and draining Based on the analysis results and experts' opinions, the "double-row anti-slip pile + cut-off drainage" reinforcement scheme is formulated, and numerical analysis is used to analyze the stress and displacement changes of the reinforced slope and anti-slip pile, which verifies the feasibility of the reinforcement scheme. The research results show that: (1) the stability coefficient of the main slip surface of the slope before reinforcement is 0.913, which does not meet the requirements of engineering specifications. (2) The plastic deformation around the anti-slip pile after reinforcement is obviously reduced relative to that before reinforcement, indicating that the reinforcement scheme is effective. (3) The stability coefficient of the main section after reinforcement is improved by 30% relative to that before reinforcement, indicating that the reinforcement scheme is feasible.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信