{"title":"莫斯科住房改造计划主要措施实施期限的计算","authors":"S. Semenov, I. B. Grishutin","doi":"10.31659/0044-4472-2024-1-2-40-42","DOIUrl":null,"url":null,"abstract":"To ensure the deadlines for the implementation of the Moscow housing stock renovation program, it is fundamentally important to use an up-to-date model for the implementation of the program. The presented article is devoted to the development of methods for assessing the dynamics of the duration of the processes of resettlement of residents and demolition of evicted houses under the renovation program. As a solution to this problem, the use of a time series estimation method is proposed. The purpose of the study was to identify quantitative changes in the values of the average duration of the processes of resettlement and demolition of apartment buildings during the implementation of the renovation program, the development and approbation of algorithms for their calculation. In case of positive experience in the application of the developed methodology, it can be extended to use in the study of the dynamics of other processes in the renovation program. Including when assessing the duration of construction of new houses.","PeriodicalId":138364,"journal":{"name":"Zhilishchnoe Stroitel'stvo","volume":"29 4","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Calculation of the Deadlines for the Implementation of Key Measures of the Moscow Housing Stock Renovation Program\",\"authors\":\"S. Semenov, I. B. Grishutin\",\"doi\":\"10.31659/0044-4472-2024-1-2-40-42\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"To ensure the deadlines for the implementation of the Moscow housing stock renovation program, it is fundamentally important to use an up-to-date model for the implementation of the program. The presented article is devoted to the development of methods for assessing the dynamics of the duration of the processes of resettlement of residents and demolition of evicted houses under the renovation program. As a solution to this problem, the use of a time series estimation method is proposed. The purpose of the study was to identify quantitative changes in the values of the average duration of the processes of resettlement and demolition of apartment buildings during the implementation of the renovation program, the development and approbation of algorithms for their calculation. In case of positive experience in the application of the developed methodology, it can be extended to use in the study of the dynamics of other processes in the renovation program. Including when assessing the duration of construction of new houses.\",\"PeriodicalId\":138364,\"journal\":{\"name\":\"Zhilishchnoe Stroitel'stvo\",\"volume\":\"29 4\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Zhilishchnoe Stroitel'stvo\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31659/0044-4472-2024-1-2-40-42\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Zhilishchnoe Stroitel'stvo","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31659/0044-4472-2024-1-2-40-42","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Calculation of the Deadlines for the Implementation of Key Measures of the Moscow Housing Stock Renovation Program
To ensure the deadlines for the implementation of the Moscow housing stock renovation program, it is fundamentally important to use an up-to-date model for the implementation of the program. The presented article is devoted to the development of methods for assessing the dynamics of the duration of the processes of resettlement of residents and demolition of evicted houses under the renovation program. As a solution to this problem, the use of a time series estimation method is proposed. The purpose of the study was to identify quantitative changes in the values of the average duration of the processes of resettlement and demolition of apartment buildings during the implementation of the renovation program, the development and approbation of algorithms for their calculation. In case of positive experience in the application of the developed methodology, it can be extended to use in the study of the dynamics of other processes in the renovation program. Including when assessing the duration of construction of new houses.