{"title":"双壁钢箱型围堰结构的力学行为分析","authors":"Jiuqun Mao, Xinliang Liu, Tao Yan, Peng Duan, Wusi Chen","doi":"10.25103/jestr.171.23","DOIUrl":null,"url":null,"abstract":"In recent years, double-wall steel boxed cofferdams with bottom structures have been applied in the construction of deep-water caps for bridges. However, their mechanical properties are affected by many factors. To elucidate the mechanics influencing such double-wall steel boxed cofferdam configurations, an analytical and computational model was proposed. Through the three-dimensional finite element software midas civil, calculations and analyses were executed on a steel boxed cofferdam design example from the 10# pier pile foundation of the Xinjiang Kalasuke Reservoir’s extra-large bridge and its platform construction. The alterations in mechanical states triggered by adjustments to the influential parameters, such as wall plate thickness, water injection height between double walls, and support rod spacing within the double walls of the steel boxed cofferdam, were discussed. Results show that, the optimal wall thickness for this cofferdam variant is between 5 and 6 mm, the controllable water injection height ranges from 3.4 m to 4.5 m, and consistently low-stress states occur across the bottom skeleton, secondary beam, and bottom plate throughout the construction process. The spacing between double-wall horizontal components greatly influences the stress and deformation of the inner and outer wall plates. The obtained conclusions provide a significantly reference value for the design theory and practical application of double-wall steel boxed cofferdam structures","PeriodicalId":15707,"journal":{"name":"Journal of Engineering Science and Technology Review","volume":"37 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis of the Mechanical Behaviour of Double-wall Steel Boxed Cofferdam Structures\",\"authors\":\"Jiuqun Mao, Xinliang Liu, Tao Yan, Peng Duan, Wusi Chen\",\"doi\":\"10.25103/jestr.171.23\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In recent years, double-wall steel boxed cofferdams with bottom structures have been applied in the construction of deep-water caps for bridges. However, their mechanical properties are affected by many factors. To elucidate the mechanics influencing such double-wall steel boxed cofferdam configurations, an analytical and computational model was proposed. Through the three-dimensional finite element software midas civil, calculations and analyses were executed on a steel boxed cofferdam design example from the 10# pier pile foundation of the Xinjiang Kalasuke Reservoir’s extra-large bridge and its platform construction. The alterations in mechanical states triggered by adjustments to the influential parameters, such as wall plate thickness, water injection height between double walls, and support rod spacing within the double walls of the steel boxed cofferdam, were discussed. Results show that, the optimal wall thickness for this cofferdam variant is between 5 and 6 mm, the controllable water injection height ranges from 3.4 m to 4.5 m, and consistently low-stress states occur across the bottom skeleton, secondary beam, and bottom plate throughout the construction process. The spacing between double-wall horizontal components greatly influences the stress and deformation of the inner and outer wall plates. The obtained conclusions provide a significantly reference value for the design theory and practical application of double-wall steel boxed cofferdam structures\",\"PeriodicalId\":15707,\"journal\":{\"name\":\"Journal of Engineering Science and Technology Review\",\"volume\":\"37 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-02-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering Science and Technology Review\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.25103/jestr.171.23\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Science and Technology Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25103/jestr.171.23","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

摘要

近年来,带底部结构的双壁钢箱围堰已被应用于桥梁深水盖的建造。然而,其力学性能受到很多因素的影响。为了阐明影响这种双壁钢箱围堰结构的力学因素,提出了一种分析和计算模型。通过三维有限元软件 midas civil,对新疆卡拉苏克水库特大桥梁 10#墩桩基及其平台施工的钢箱围堰设计实例进行了计算和分析。讨论了调整钢箱围堰的壁板厚度、双壁间注水高度和双壁内支撑杆间距等影响参数所引发的力学状态变化。结果表明,该围堰变体的最佳壁厚在 5 至 6 毫米之间,可控注水高度在 3.4 米至 4.5 米之间,整个施工过程中底部骨架、次梁和底板始终处于低应力状态。双层水平构件之间的间距在很大程度上影响着内外壁板的应力和变形。所得出的结论为双壁钢箱围堰结构的设计理论和实际应用提供了重要的参考价值
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis of the Mechanical Behaviour of Double-wall Steel Boxed Cofferdam Structures
In recent years, double-wall steel boxed cofferdams with bottom structures have been applied in the construction of deep-water caps for bridges. However, their mechanical properties are affected by many factors. To elucidate the mechanics influencing such double-wall steel boxed cofferdam configurations, an analytical and computational model was proposed. Through the three-dimensional finite element software midas civil, calculations and analyses were executed on a steel boxed cofferdam design example from the 10# pier pile foundation of the Xinjiang Kalasuke Reservoir’s extra-large bridge and its platform construction. The alterations in mechanical states triggered by adjustments to the influential parameters, such as wall plate thickness, water injection height between double walls, and support rod spacing within the double walls of the steel boxed cofferdam, were discussed. Results show that, the optimal wall thickness for this cofferdam variant is between 5 and 6 mm, the controllable water injection height ranges from 3.4 m to 4.5 m, and consistently low-stress states occur across the bottom skeleton, secondary beam, and bottom plate throughout the construction process. The spacing between double-wall horizontal components greatly influences the stress and deformation of the inner and outer wall plates. The obtained conclusions provide a significantly reference value for the design theory and practical application of double-wall steel boxed cofferdam structures
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.00
自引率
0.00%
发文量
66
审稿时长
24 weeks
期刊介绍: The Journal of Engineering Science and Technology Review (JESTR) is a peer reviewed international journal publishing high quality articles dediicated to all aspects of engineering. The Journal considers only manuscripts that have not been published (or submitted simultaneously), at any language, elsewhere. Contributions are in English. The Journal is published by the Eastern Macedonia and Thrace Institute of Technology (EMaTTech), located in Kavala, Greece. All articles published in JESTR are licensed under a CC BY-NC license. Copyright is by the publisher and the authors.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信