A40 布雷肯支路山体滑坡:调查、修复和资产管理,提高气候适应能力

IF 1.3 4区 工程技术 Q3 ENGINEERING, GEOLOGICAL
Thomas W. St. John, Hana Oliphant, Matt Butler
{"title":"A40 布雷肯支路山体滑坡:调查、修复和资产管理,提高气候适应能力","authors":"Thomas W. St. John, Hana Oliphant, Matt Butler","doi":"10.1144/qjegh2024-026","DOIUrl":null,"url":null,"abstract":"\n During February 2020, a 300m\n 3\n slope failure occurred within a trunk road earthwork at Brecon, Wales, leading to the initial closure of all four lanes of the dual carriageway. As part of Welsh Government's strategy for climate resilient infrastructure and in accordance with the CD622 Managing Geotechnical Risk framework, the site investigation commenced in 2020 and proceeded through various phases to the completion of remedial works in 2022. This paper discusses the approach to management of geotechnical risk for the scheme, from desk study through implementation of an on-slope ground investigation and interim risk mitigation, to design and implementation of the remedial measures. The paper describes the nature and trigger of the landslide case study, adaptations in the design phase to provide resilience to geohazards and future climatic conditions, the constraints that were overcome during the site works and measures taken to manage residual risk and ensure ease of maintenance.\n \n \n Thematic collection:\n This article is part of the Geo-resilience and infrastructure collection available at:\n https://www.lyellcollection.org/topic/collections/geo-resilience-and-infrastructure\n","PeriodicalId":20937,"journal":{"name":"Quarterly Journal of Engineering Geology and Hydrogeology","volume":null,"pages":null},"PeriodicalIF":1.3000,"publicationDate":"2024-03-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A40 Brecon Bypass landslide: investigation, remediation and asset management for climate resilience\",\"authors\":\"Thomas W. St. John, Hana Oliphant, Matt Butler\",\"doi\":\"10.1144/qjegh2024-026\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n During February 2020, a 300m\\n 3\\n slope failure occurred within a trunk road earthwork at Brecon, Wales, leading to the initial closure of all four lanes of the dual carriageway. As part of Welsh Government's strategy for climate resilient infrastructure and in accordance with the CD622 Managing Geotechnical Risk framework, the site investigation commenced in 2020 and proceeded through various phases to the completion of remedial works in 2022. This paper discusses the approach to management of geotechnical risk for the scheme, from desk study through implementation of an on-slope ground investigation and interim risk mitigation, to design and implementation of the remedial measures. The paper describes the nature and trigger of the landslide case study, adaptations in the design phase to provide resilience to geohazards and future climatic conditions, the constraints that were overcome during the site works and measures taken to manage residual risk and ensure ease of maintenance.\\n \\n \\n Thematic collection:\\n This article is part of the Geo-resilience and infrastructure collection available at:\\n https://www.lyellcollection.org/topic/collections/geo-resilience-and-infrastructure\\n\",\"PeriodicalId\":20937,\"journal\":{\"name\":\"Quarterly Journal of Engineering Geology and Hydrogeology\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.3000,\"publicationDate\":\"2024-03-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Quarterly Journal of Engineering Geology and Hydrogeology\",\"FirstCategoryId\":\"89\",\"ListUrlMain\":\"https://doi.org/10.1144/qjegh2024-026\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, GEOLOGICAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Quarterly Journal of Engineering Geology and Hydrogeology","FirstCategoryId":"89","ListUrlMain":"https://doi.org/10.1144/qjegh2024-026","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, GEOLOGICAL","Score":null,"Total":0}
引用次数: 0

摘要

2020 年 2 月,威尔士布雷肯的一条主干道土方工程发生了 300 米 3 的边坡塌方,导致双车道的所有四条车道初步关闭。作为威尔士政府气候适应性基础设施战略的一部分,并根据 CD622 管理岩土工程风险框架,现场调查于 2020 年开始,经过不同阶段,于 2022 年完成修复工程。本文讨论了该计划的岩土工程风险管理方法,包括从案头研究到实施斜坡地面勘察和临时风险缓解,再到设计和实施补救措施。本文介绍了滑坡案例研究的性质和触发因素、设计阶段为抵御地质灾害和未来气候条件而进行的调整、现场施工过程中克服的限制因素,以及为管理残余风险和确保易于维护而采取的措施。 专题集锦:本文是地质抗灾与基础设施专题集的一部分,可从以下网址获取: https://www.lyellcollection.org/topic/collections/geo-resilience-and-infrastructure
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A40 Brecon Bypass landslide: investigation, remediation and asset management for climate resilience
During February 2020, a 300m 3 slope failure occurred within a trunk road earthwork at Brecon, Wales, leading to the initial closure of all four lanes of the dual carriageway. As part of Welsh Government's strategy for climate resilient infrastructure and in accordance with the CD622 Managing Geotechnical Risk framework, the site investigation commenced in 2020 and proceeded through various phases to the completion of remedial works in 2022. This paper discusses the approach to management of geotechnical risk for the scheme, from desk study through implementation of an on-slope ground investigation and interim risk mitigation, to design and implementation of the remedial measures. The paper describes the nature and trigger of the landslide case study, adaptations in the design phase to provide resilience to geohazards and future climatic conditions, the constraints that were overcome during the site works and measures taken to manage residual risk and ensure ease of maintenance. Thematic collection: This article is part of the Geo-resilience and infrastructure collection available at: https://www.lyellcollection.org/topic/collections/geo-resilience-and-infrastructure
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.40
自引率
14.30%
发文量
66
审稿时长
6 months
期刊介绍: Quarterly Journal of Engineering Geology and Hydrogeology is owned by the Geological Society of London and published by the Geological Society Publishing House. Quarterly Journal of Engineering Geology & Hydrogeology (QJEGH) is an established peer reviewed international journal featuring papers on geology as applied to civil engineering mining practice and water resources. Papers are invited from, and about, all areas of the world on engineering geology and hydrogeology topics. This includes but is not limited to: applied geophysics, engineering geomorphology, environmental geology, hydrogeology, groundwater quality, ground source heat, contaminated land, waste management, land use planning, geotechnics, rock mechanics, geomaterials and geological hazards. The journal publishes the prestigious Glossop and Ineson lectures, research papers, case studies, review articles, technical notes, photographic features, thematic sets, discussion papers, editorial opinion and book reviews.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信