需要为贝加尔-阿穆尔和横贯西伯利亚公路的运输基础设施提供所需的电力能力

I. N. Shushpanov, D. N. Permyakova, V. Konyukhov, T. Oparina
{"title":"需要为贝加尔-阿穆尔和横贯西伯利亚公路的运输基础设施提供所需的电力能力","authors":"I. N. Shushpanov, D. N. Permyakova, V. Konyukhov, T. Oparina","doi":"10.30724/1998-9903-2023-25-5-59-73","DOIUrl":null,"url":null,"abstract":"THE PURPOSE. To study the need to provide the required electrical capacities of the transport  infrastructure  facilities  of  the  Baikal-Amur  and  Trans-Siberian  highways.  Today, increasing the transportation capacity of the railway transport system in the Eastern direction is an  important  transport  task..  The  solution  of  problems  related  to  the  creation  of  transport infrastructure  is  inextricably  linked  with  the  creation  of  sources  of  electric  power  in  the presented  scientific  work,  the  authors  analyzed  the  technical  failures  of  the  equipment  of traction substations of the railway line. This analysis revealed that the main cause of equipment failures  of  the  traction  power  supply  system  is  equipment  wear.  It  accounts  for  about  45%  of failures, which is certainly a lot. METHODS. In order to identify technically weak zones on the established  section  of  the  railway  line,  taking  into  account  the  passage  of  heavy  trains  for  the prospective development of the Baikal-Amur and Trans-Siberian highways, traction calculations were  performed  using  the  Kortes  software  package  as  part  of  the  increase  in  freight  traffic  in the eastern direction. RESULTS. The calculated values obtained with the existing dimensions of the organization of train traffic allowed us to conclude that the traction power supply system of the  section  in  question  does  not  allow  to  provide  the  necessary  level  of  traction  network parameters  and  skip  the  planned  train  flow.  The  largest  number  of  failures  falls  on  the equipment of traction substation No. 4, which necessitates the replacement or modernization of this  equipment.  CONCLUSION.  The  expediency  of  reconstruction  of  traction  substations  is determined, taking into account the prospective state of operation of the site.","PeriodicalId":222237,"journal":{"name":"Power engineering: research, equipment, technology","volume":" 46","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-01-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The need to provide the required electrical capacities of the transport infrastructure facilities of the Baikal-Amur and Trans-Siberian highways\",\"authors\":\"I. N. Shushpanov, D. N. Permyakova, V. Konyukhov, T. Oparina\",\"doi\":\"10.30724/1998-9903-2023-25-5-59-73\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"THE PURPOSE. To study the need to provide the required electrical capacities of the transport  infrastructure  facilities  of  the  Baikal-Amur  and  Trans-Siberian  highways.  Today, increasing the transportation capacity of the railway transport system in the Eastern direction is an  important  transport  task..  The  solution  of  problems  related  to  the  creation  of  transport infrastructure  is  inextricably  linked  with  the  creation  of  sources  of  electric  power  in  the presented  scientific  work,  the  authors  analyzed  the  technical  failures  of  the  equipment  of traction substations of the railway line. This analysis revealed that the main cause of equipment failures  of  the  traction  power  supply  system  is  equipment  wear.  It  accounts  for  about  45%  of failures, which is certainly a lot. METHODS. In order to identify technically weak zones on the established  section  of  the  railway  line,  taking  into  account  the  passage  of  heavy  trains  for  the prospective development of the Baikal-Amur and Trans-Siberian highways, traction calculations were  performed  using  the  Kortes  software  package  as  part  of  the  increase  in  freight  traffic  in the eastern direction. RESULTS. The calculated values obtained with the existing dimensions of the organization of train traffic allowed us to conclude that the traction power supply system of the  section  in  question  does  not  allow  to  provide  the  necessary  level  of  traction  network parameters  and  skip  the  planned  train  flow.  The  largest  number  of  failures  falls  on  the equipment of traction substation No. 4, which necessitates the replacement or modernization of this  equipment.  CONCLUSION.  The  expediency  of  reconstruction  of  traction  substations  is determined, taking into account the prospective state of operation of the site.\",\"PeriodicalId\":222237,\"journal\":{\"name\":\"Power engineering: research, equipment, technology\",\"volume\":\" 46\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-01-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Power engineering: research, equipment, technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30724/1998-9903-2023-25-5-59-73\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Power engineering: research, equipment, technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30724/1998-9903-2023-25-5-59-73","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

目的研究为贝加尔湖-阿穆尔河和横贯西伯利亚公路的运输基础设施提供所需电力容量的必要性。 如今,提高东部铁路运输系统的运输能力是一项重要的运输任务。 在本科学著作中,作者对铁路牵引变电站设备的技术故障进行了分析。分析结果表明,牵引供电系统设备故障的主要原因是设备磨损。 约占故障的 45%,这无疑是一个很大的数字。为了确定已建铁路段的技术薄弱环节,同时考虑到贝加尔-阿穆尔和西伯利亚大铁路发展前景的重型列车通过情况,使用 Kortes 软件包进行了牵引计算,作为东部方向货运量增长的一部分。结果。根据现有列车交通组织的计算值,我们可以得出结论,该路段的牵引供电系统无法提供必要的牵引网络参数水平,也无法跳过计划的列车流量。 故障最多的是 4 号牵引变电所的设备,因此有必要更换或更新该设备。 结论。 牵引变电所重建的适宜性是在考虑到该站点未来运行状况的基础上确定的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The need to provide the required electrical capacities of the transport infrastructure facilities of the Baikal-Amur and Trans-Siberian highways
THE PURPOSE. To study the need to provide the required electrical capacities of the transport  infrastructure  facilities  of  the  Baikal-Amur  and  Trans-Siberian  highways.  Today, increasing the transportation capacity of the railway transport system in the Eastern direction is an  important  transport  task..  The  solution  of  problems  related  to  the  creation  of  transport infrastructure  is  inextricably  linked  with  the  creation  of  sources  of  electric  power  in  the presented  scientific  work,  the  authors  analyzed  the  technical  failures  of  the  equipment  of traction substations of the railway line. This analysis revealed that the main cause of equipment failures  of  the  traction  power  supply  system  is  equipment  wear.  It  accounts  for  about  45%  of failures, which is certainly a lot. METHODS. In order to identify technically weak zones on the established  section  of  the  railway  line,  taking  into  account  the  passage  of  heavy  trains  for  the prospective development of the Baikal-Amur and Trans-Siberian highways, traction calculations were  performed  using  the  Kortes  software  package  as  part  of  the  increase  in  freight  traffic  in the eastern direction. RESULTS. The calculated values obtained with the existing dimensions of the organization of train traffic allowed us to conclude that the traction power supply system of the  section  in  question  does  not  allow  to  provide  the  necessary  level  of  traction  network parameters  and  skip  the  planned  train  flow.  The  largest  number  of  failures  falls  on  the equipment of traction substation No. 4, which necessitates the replacement or modernization of this  equipment.  CONCLUSION.  The  expediency  of  reconstruction  of  traction  substations  is determined, taking into account the prospective state of operation of the site.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信