应力扰动对挖掘墓室后附近水泥路面变形的影响

IF 3.1 3区 工程技术 Q2 CONSTRUCTION & BUILDING TECHNOLOGY
Yueying Zhang, Dongxiao Zhang, Xufei Gong, Wei Zhang, Zihao Liu, Feng Xiong
{"title":"应力扰动对挖掘墓室后附近水泥路面变形的影响","authors":"Yueying Zhang, Dongxiao Zhang, Xufei Gong, Wei Zhang, Zihao Liu, Feng Xiong","doi":"10.3390/buildings14010169","DOIUrl":null,"url":null,"abstract":"Based on the engineering background of weakly cemented roadways and adjacent chambers in Western China, a numerical simulation method was used to examine the changes in stress distribution and increment in the surrounding rock of weakly cemented roadways adjacent to chambers. The results show that the surrounding rock stress of the weakly cemented roadway adjacent to the chambers increases by approximately 30%. The vertical stress of the surrounding rock mainly expands along the vertical direction, and the expansion range is 7–12 times that of the chamber height. The horizontal stress of the surrounding rock mainly expands along the horizontal direction, and the expansion range is 3–6 times that of the chamber width. Based on the support idea of “allowable deformation” + “relief pressure” + “maintaining roadway shape”, the support technology of weakly cemented roadways adjacent to chambers is established with “full section U-shaped steel shed + filling flexible materials between the steel shed and surrounding rock + patching the roof bolt + laying concrete on floor”. An engineering test based on the above support technology was carried out, and it was found that the deformation of the weakly cemented roadway adjacent to the chambers was 0 in 20 days.","PeriodicalId":48546,"journal":{"name":"Buildings","volume":"16 9","pages":""},"PeriodicalIF":3.1000,"publicationDate":"2024-01-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Influence of Stress Disturbance on the Deformation of Nearby Cemented Roadways following the Excavation of Chambers\",\"authors\":\"Yueying Zhang, Dongxiao Zhang, Xufei Gong, Wei Zhang, Zihao Liu, Feng Xiong\",\"doi\":\"10.3390/buildings14010169\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Based on the engineering background of weakly cemented roadways and adjacent chambers in Western China, a numerical simulation method was used to examine the changes in stress distribution and increment in the surrounding rock of weakly cemented roadways adjacent to chambers. The results show that the surrounding rock stress of the weakly cemented roadway adjacent to the chambers increases by approximately 30%. The vertical stress of the surrounding rock mainly expands along the vertical direction, and the expansion range is 7–12 times that of the chamber height. The horizontal stress of the surrounding rock mainly expands along the horizontal direction, and the expansion range is 3–6 times that of the chamber width. Based on the support idea of “allowable deformation” + “relief pressure” + “maintaining roadway shape”, the support technology of weakly cemented roadways adjacent to chambers is established with “full section U-shaped steel shed + filling flexible materials between the steel shed and surrounding rock + patching the roof bolt + laying concrete on floor”. An engineering test based on the above support technology was carried out, and it was found that the deformation of the weakly cemented roadway adjacent to the chambers was 0 in 20 days.\",\"PeriodicalId\":48546,\"journal\":{\"name\":\"Buildings\",\"volume\":\"16 9\",\"pages\":\"\"},\"PeriodicalIF\":3.1000,\"publicationDate\":\"2024-01-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Buildings\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.3390/buildings14010169\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Buildings","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.3390/buildings14010169","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

摘要

基于中国西部软弱胶结巷道及邻近硐室的工程背景,采用数值模拟方法研究了邻近硐室的软弱胶结巷道围岩应力分布和增量的变化。结果表明,与硐室相邻的弱胶结巷道围岩应力增加了约 30%。围岩的垂直应力主要沿垂直方向扩展,扩展范围为硐室高度的 7-12 倍。围岩的水平应力主要沿水平方向扩展,扩展范围为硐室宽度的 3-6 倍。根据 "允许变形 "+"卸压 "+"保持巷道形状 "的支护思路,建立了 "全断面 U 型钢棚+钢棚与围岩之间填充柔性材料+补顶螺栓+地面铺设混凝土 "的硐室邻近弱胶结巷道支护技术。根据上述支护技术进行了工程试验,发现硐室邻近软弱水泥巷道在 20 天内的变形量为 0。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Influence of Stress Disturbance on the Deformation of Nearby Cemented Roadways following the Excavation of Chambers
Based on the engineering background of weakly cemented roadways and adjacent chambers in Western China, a numerical simulation method was used to examine the changes in stress distribution and increment in the surrounding rock of weakly cemented roadways adjacent to chambers. The results show that the surrounding rock stress of the weakly cemented roadway adjacent to the chambers increases by approximately 30%. The vertical stress of the surrounding rock mainly expands along the vertical direction, and the expansion range is 7–12 times that of the chamber height. The horizontal stress of the surrounding rock mainly expands along the horizontal direction, and the expansion range is 3–6 times that of the chamber width. Based on the support idea of “allowable deformation” + “relief pressure” + “maintaining roadway shape”, the support technology of weakly cemented roadways adjacent to chambers is established with “full section U-shaped steel shed + filling flexible materials between the steel shed and surrounding rock + patching the roof bolt + laying concrete on floor”. An engineering test based on the above support technology was carried out, and it was found that the deformation of the weakly cemented roadway adjacent to the chambers was 0 in 20 days.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Buildings
Buildings Multiple-
CiteScore
3.40
自引率
26.30%
发文量
1883
审稿时长
11 weeks
期刊介绍: BUILDINGS content is primarily staff-written and submitted information is evaluated by the editors for its value to the audience. Such information may be used in articles with appropriate attribution to the source. The editorial staff considers information on the following topics: -Issues directed at building owners and facility managers in North America -Issues relevant to existing buildings, including retrofits, maintenance and modernization -Solution-based content, such as tips and tricks -New construction but only with an eye to issues involving maintenance and operation We generally do not review the following topics because these are not relevant to our readers: -Information on the residential market with the exception of multifamily buildings -International news unrelated to the North American market -Real estate market updates or construction updates
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信