G. Bimbetova, A. Kembaev, A. Kabdushev, Zh. K. Nadirova, N. Otarbaev
{"title":"用于固定井筒的灌浆方案","authors":"G. Bimbetova, A. Kembaev, A. Kabdushev, Zh. K. Nadirova, N. Otarbaev","doi":"10.37878/2708-0080/2023-4.05","DOIUrl":null,"url":null,"abstract":"The article discusses the use of spent bleach clays in the formulation of grouting solutions injected into the space between the casing and the wall of the well. A grouting solution is proposed, including Portland cement; selected clay for the production of motor oils, a filtration step-downer (CMC), a plasticizer - saponified cotton tar, water or an aqueous solution of a setting time accelerator- sodium chloride, a defoamer.","PeriodicalId":272594,"journal":{"name":"Neft i gaz","volume":"52 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-08-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"GROUTING SOLUTION FOR FIXING THE CASING OF THE WELL\",\"authors\":\"G. Bimbetova, A. Kembaev, A. Kabdushev, Zh. K. Nadirova, N. Otarbaev\",\"doi\":\"10.37878/2708-0080/2023-4.05\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The article discusses the use of spent bleach clays in the formulation of grouting solutions injected into the space between the casing and the wall of the well. A grouting solution is proposed, including Portland cement; selected clay for the production of motor oils, a filtration step-downer (CMC), a plasticizer - saponified cotton tar, water or an aqueous solution of a setting time accelerator- sodium chloride, a defoamer.\",\"PeriodicalId\":272594,\"journal\":{\"name\":\"Neft i gaz\",\"volume\":\"52 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-08-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Neft i gaz\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.37878/2708-0080/2023-4.05\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Neft i gaz","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37878/2708-0080/2023-4.05","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
GROUTING SOLUTION FOR FIXING THE CASING OF THE WELL
The article discusses the use of spent bleach clays in the formulation of grouting solutions injected into the space between the casing and the wall of the well. A grouting solution is proposed, including Portland cement; selected clay for the production of motor oils, a filtration step-downer (CMC), a plasticizer - saponified cotton tar, water or an aqueous solution of a setting time accelerator- sodium chloride, a defoamer.