利用全面的 BIM 数据建立公共设施模型

Anna Gardzińska
{"title":"利用全面的 BIM 数据建立公共设施模型","authors":"Anna Gardzińska","doi":"10.59440/ceer/175011","DOIUrl":null,"url":null,"abstract":"The purpose of this work is to present the possibilities of using tacheometric measurement technology in the development of a 3D geometric model of an existing building and the directions of using BIM technology in the process of building operation. General information on the development of BIM technology was presented, and issues related to the construction of 3D models were discussed. Attention was also drawn to the need to update the information assigned to the model on an ongoing basis in order to effectively manage the building. Supplementing the model with metadata regarding the building materials used will allow for a precise and quick analysis of all renovation assumptions. The created 3D model can be used to control the condition of structures or in safety and risk management.","PeriodicalId":503238,"journal":{"name":"Civil and Environmental Engineering Reports","volume":"32 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-11-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Modeling of a Public Utility Facility from Total BIM Data\",\"authors\":\"Anna Gardzińska\",\"doi\":\"10.59440/ceer/175011\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The purpose of this work is to present the possibilities of using tacheometric measurement technology in the development of a 3D geometric model of an existing building and the directions of using BIM technology in the process of building operation. General information on the development of BIM technology was presented, and issues related to the construction of 3D models were discussed. Attention was also drawn to the need to update the information assigned to the model on an ongoing basis in order to effectively manage the building. Supplementing the model with metadata regarding the building materials used will allow for a precise and quick analysis of all renovation assumptions. The created 3D model can be used to control the condition of structures or in safety and risk management.\",\"PeriodicalId\":503238,\"journal\":{\"name\":\"Civil and Environmental Engineering Reports\",\"volume\":\"32 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-11-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Civil and Environmental Engineering Reports\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.59440/ceer/175011\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Civil and Environmental Engineering Reports","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.59440/ceer/175011","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

这项工作的目的是介绍在开发现有建筑物的三维几何模型时使用测量技术的可能性,以及在建筑物运行过程中使用 BIM 技术的方向。作品介绍了 BIM 技术发展的一般信息,并讨论了与三维模型构建有关的问题。此外,还提请注意需要持续更新分配给模型的信息,以便有效管理建筑物。在模型中补充有关所用建筑材料的元数据,可以对所有翻新假设进行精确和快速的分析。创建的三维模型可用于控制结构状况或安全和风险管理。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Modeling of a Public Utility Facility from Total BIM Data
The purpose of this work is to present the possibilities of using tacheometric measurement technology in the development of a 3D geometric model of an existing building and the directions of using BIM technology in the process of building operation. General information on the development of BIM technology was presented, and issues related to the construction of 3D models were discussed. Attention was also drawn to the need to update the information assigned to the model on an ongoing basis in order to effectively manage the building. Supplementing the model with metadata regarding the building materials used will allow for a precise and quick analysis of all renovation assumptions. The created 3D model can be used to control the condition of structures or in safety and risk management.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信