{"title":"印度尼西亚风力发电厂(PLTB)作为替代性可再生能源的发展分析","authors":"Jenni Wulandari, Sudarti, Yushardi","doi":"10.47233/jpst.v2i4.1303","DOIUrl":null,"url":null,"abstract":"One of the government's steps in the energy sector is to immediately develop and introduce renewable energy sources to reduce dependence on fossil fuels. Supporting government policies regarding community energy supply, including wind energy, requires the introduction of the use of new renewable energy sources based on local potential. To support this government program, non-profit programs are being implemented in several cities in Indonesia to exploit the potential of wind energy. Wind speed, or the average wind energy that can be harvested each day, on Mount Kinshiel ranges from 60.14 to 77.59 W per hour. On the other hand, wind speed in Gresik Regency has been unstable for 10 days, with an average wind speed of 1.5 m/s and wind strength of 10.47 watts during those 10 days. In Palu City, the PLTB electricity generation capacity is 28,308 kWh/day, and the 900 VA electricity supply from the PLTB system is distributed to approximately 31 houses (electricity consumers).","PeriodicalId":502958,"journal":{"name":"Jurnal Pendidikan, Sains Dan Teknologi","volume":"15 11","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-12-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analisis Perkembangan Pembangkit Listrik Tenaga Bayu (PLTB) Sebagai Sumber Energi Alternatif Terbarukan Di Indonesia\",\"authors\":\"Jenni Wulandari, Sudarti, Yushardi\",\"doi\":\"10.47233/jpst.v2i4.1303\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"One of the government's steps in the energy sector is to immediately develop and introduce renewable energy sources to reduce dependence on fossil fuels. Supporting government policies regarding community energy supply, including wind energy, requires the introduction of the use of new renewable energy sources based on local potential. To support this government program, non-profit programs are being implemented in several cities in Indonesia to exploit the potential of wind energy. Wind speed, or the average wind energy that can be harvested each day, on Mount Kinshiel ranges from 60.14 to 77.59 W per hour. On the other hand, wind speed in Gresik Regency has been unstable for 10 days, with an average wind speed of 1.5 m/s and wind strength of 10.47 watts during those 10 days. In Palu City, the PLTB electricity generation capacity is 28,308 kWh/day, and the 900 VA electricity supply from the PLTB system is distributed to approximately 31 houses (electricity consumers).\",\"PeriodicalId\":502958,\"journal\":{\"name\":\"Jurnal Pendidikan, Sains Dan Teknologi\",\"volume\":\"15 11\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-12-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Pendidikan, Sains Dan Teknologi\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.47233/jpst.v2i4.1303\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Pendidikan, Sains Dan Teknologi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.47233/jpst.v2i4.1303","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

政府在能源领域采取的措施之一是立即开发和引进可再生能源,以减少对化石燃料的依赖。要支持政府有关社区能源供应(包括风能)的政策,就必须根据当地的潜力引进使用新的可再生能源。为支持政府的这一计划,印尼多个城市正在实施非营利性计划,以挖掘风能的潜力。金希尔山的风速或平均每天可收集的风能为每小时 60.14 到 77.59 瓦。另一方面,格雷斯克地区的风速已连续 10 天不稳定,这 10 天的平均风速为 1.5 米/秒,风力强度为 10.47 瓦。在帕卢市,PLTB 的发电量为每天 28,308 千瓦时,PLTB 系统提供的 900 伏安电力被分配给大约 31 栋房屋(用电户)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analisis Perkembangan Pembangkit Listrik Tenaga Bayu (PLTB) Sebagai Sumber Energi Alternatif Terbarukan Di Indonesia
One of the government's steps in the energy sector is to immediately develop and introduce renewable energy sources to reduce dependence on fossil fuels. Supporting government policies regarding community energy supply, including wind energy, requires the introduction of the use of new renewable energy sources based on local potential. To support this government program, non-profit programs are being implemented in several cities in Indonesia to exploit the potential of wind energy. Wind speed, or the average wind energy that can be harvested each day, on Mount Kinshiel ranges from 60.14 to 77.59 W per hour. On the other hand, wind speed in Gresik Regency has been unstable for 10 days, with an average wind speed of 1.5 m/s and wind strength of 10.47 watts during those 10 days. In Palu City, the PLTB electricity generation capacity is 28,308 kWh/day, and the 900 VA electricity supply from the PLTB system is distributed to approximately 31 houses (electricity consumers).
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信