莫拉瓦(Morava)热电厂建设后基础设施上的绿色光伏-氢气综合体概念设计

Dimić Mina, Djurišić Željko, Stančević Perica
{"title":"莫拉瓦(Morava)热电厂建设后基础设施上的绿色光伏-氢气综合体概念设计","authors":"Dimić Mina, Djurišić Željko, Stančević Perica","doi":"10.46793/eee22-4.10d","DOIUrl":null,"url":null,"abstract":"The paper presents the concept of replacing the existing thermal power plant Morava with facilities for the production, storage and combustion of green hydrogen. The facilities for the production of hydrogen would consist of an electrolyzer and a photovoltaic power plant, which is planned at the existing ash pit within the Morava thermal power plant. Hydrogen storage systems would also be part of the existing thermal power plant complex. The production of electricity would be carried out in a thermal power plant with a gas turbine powered by a mixture of hydrogen and natural gas, which would be built and connected to the power system at the site of the existing 110 kV substation. It would also be foreseen to use thermal energy that would serve for heating the households near the thermal power plant. Such a complex would enable the existing infrastructure of the Morava thermal power plant to be reoriented to the production of manageable green energy.","PeriodicalId":236996,"journal":{"name":"Energija, ekonomija, ekologija","volume":"80 ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Idejno rešenje zelenog PV – vodonik kompleksa na postojećoj infrastrukturi termoelektrane „Morava”\",\"authors\":\"Dimić Mina, Djurišić Željko, Stančević Perica\",\"doi\":\"10.46793/eee22-4.10d\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper presents the concept of replacing the existing thermal power plant Morava with facilities for the production, storage and combustion of green hydrogen. The facilities for the production of hydrogen would consist of an electrolyzer and a photovoltaic power plant, which is planned at the existing ash pit within the Morava thermal power plant. Hydrogen storage systems would also be part of the existing thermal power plant complex. The production of electricity would be carried out in a thermal power plant with a gas turbine powered by a mixture of hydrogen and natural gas, which would be built and connected to the power system at the site of the existing 110 kV substation. It would also be foreseen to use thermal energy that would serve for heating the households near the thermal power plant. Such a complex would enable the existing infrastructure of the Morava thermal power plant to be reoriented to the production of manageable green energy.\",\"PeriodicalId\":236996,\"journal\":{\"name\":\"Energija, ekonomija, ekologija\",\"volume\":\"80 \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Energija, ekonomija, ekologija\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.46793/eee22-4.10d\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Energija, ekonomija, ekologija","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46793/eee22-4.10d","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文介绍了用生产、储存和燃烧绿色氢气的设施取代现有 Morava 热电厂的构想。制氢设施包括一个电解槽和一个光伏发电站,计划设在 Morava 热电厂现有的灰坑内。氢储存系统也将是现有热电厂综合设施的一部分。热电厂将使用氢气和天然气混合物驱动的燃气轮机发电,该热电厂将在现有的 110 千伏变电站所在地建设并与电力系统连接。预计还将利用热能为热电厂附近的家庭供暖。这样一个综合体将使 Morava 热电厂现有的基础设施重新定位为生产可管理的绿色能源。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Idejno rešenje zelenog PV – vodonik kompleksa na postojećoj infrastrukturi termoelektrane „Morava”
The paper presents the concept of replacing the existing thermal power plant Morava with facilities for the production, storage and combustion of green hydrogen. The facilities for the production of hydrogen would consist of an electrolyzer and a photovoltaic power plant, which is planned at the existing ash pit within the Morava thermal power plant. Hydrogen storage systems would also be part of the existing thermal power plant complex. The production of electricity would be carried out in a thermal power plant with a gas turbine powered by a mixture of hydrogen and natural gas, which would be built and connected to the power system at the site of the existing 110 kV substation. It would also be foreseen to use thermal energy that would serve for heating the households near the thermal power plant. Such a complex would enable the existing infrastructure of the Morava thermal power plant to be reoriented to the production of manageable green energy.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信