{"title":"减少接触网和交流电架空线路的经济损失","authors":"Maxim Shevlyugin, Andrey Kulikov, Darya Semenova","doi":"10.20295/1815-588x-2023-4-975-986","DOIUrl":null,"url":null,"abstract":"Purpose: To reduce economic losses in the contact network (CN) and overhead lines (OL) electrified with alternating current. The existing electromagnetic influences on the alternating current railway lead to significant economic losses. Additionally, there is a problem of the contact wire (CW) burnout during the passage of a neutral section with a raised pantograph under voltage on a high-speed railway line (HSRL). CW burnout leads to failure of the contact network, repair costs, possible damage to other people’s property and rolling stock. As a whole, all this represents significant economic losses. Methods: The analysis of material and time costs for the elimination of problems that arise due to the CW burnout or due to the use of manual labor during the installation of OL has been carried out, in comparison with the proposed solutions to reduce economic losses. Results: In solving the problem of the negative electromagnetic influence of the contact line (CL) on the OL, a mobile mechanized complex (MMC) is designed to help, which performs the transposition of the OL wires in 6 steps with scrolling by 60° each support. This method will allow us to place the OL wires equidistantly from the contact wire. Scrolling with once-per-support frequency will align the asymmetry of the linear electrical parameters. All in all, MMC performs installation in an automated mode. The problems of the CW burnout can be reduced by the insulating coupling device (ICD) of the CL. ICD CL is a set of step resistances, which are located at the outer sections of the phase wires before and after the neutral section. It is aimed at reducing the current to a safe value, which will not lead to the contact wire burnout, failure of the CN and/or rolling stock and possible damage to other people’s property. Practical significance: The result is a set of measures in the form of MMC to reduce economic losses in overhead lines from the influence of CN and ICD CL to reduce losses in the contact network by maintaining the operability of the contact wire.","PeriodicalId":273874,"journal":{"name":"Proceedings of Petersburg Transport University","volume":"15 2","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-12-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Reduction of Economic Losses in the Contact Network and Overhead Lines Electrified with Alternating Current\",\"authors\":\"Maxim Shevlyugin, Andrey Kulikov, Darya Semenova\",\"doi\":\"10.20295/1815-588x-2023-4-975-986\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Purpose: To reduce economic losses in the contact network (CN) and overhead lines (OL) electrified with alternating current. The existing electromagnetic influences on the alternating current railway lead to significant economic losses. Additionally, there is a problem of the contact wire (CW) burnout during the passage of a neutral section with a raised pantograph under voltage on a high-speed railway line (HSRL). CW burnout leads to failure of the contact network, repair costs, possible damage to other people’s property and rolling stock. As a whole, all this represents significant economic losses. Methods: The analysis of material and time costs for the elimination of problems that arise due to the CW burnout or due to the use of manual labor during the installation of OL has been carried out, in comparison with the proposed solutions to reduce economic losses. Results: In solving the problem of the negative electromagnetic influence of the contact line (CL) on the OL, a mobile mechanized complex (MMC) is designed to help, which performs the transposition of the OL wires in 6 steps with scrolling by 60° each support. This method will allow us to place the OL wires equidistantly from the contact wire. Scrolling with once-per-support frequency will align the asymmetry of the linear electrical parameters. All in all, MMC performs installation in an automated mode. The problems of the CW burnout can be reduced by the insulating coupling device (ICD) of the CL. ICD CL is a set of step resistances, which are located at the outer sections of the phase wires before and after the neutral section. It is aimed at reducing the current to a safe value, which will not lead to the contact wire burnout, failure of the CN and/or rolling stock and possible damage to other people’s property. Practical significance: The result is a set of measures in the form of MMC to reduce economic losses in overhead lines from the influence of CN and ICD CL to reduce losses in the contact network by maintaining the operability of the contact wire.\",\"PeriodicalId\":273874,\"journal\":{\"name\":\"Proceedings of Petersburg Transport University\",\"volume\":\"15 2\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-12-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of Petersburg Transport University\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.20295/1815-588x-2023-4-975-986\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of Petersburg Transport University","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.20295/1815-588x-2023-4-975-986","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
目的: 减少交流电气化接触网(CN)和架空线路(OL)的经济损失。交流铁路上现有的电磁影响导致了巨大的经济损失。此外,在高速铁路线(HSRL)上,中性线段在电压下通过升高的受电弓时存在接触线(CW)烧毁的问题。接触网烧毁会导致接触网故障、维修费用增加,还可能损坏他人财产和机车车辆。总之,所有这些都会造成巨大的经济损失。方法:对消除因 CW 烧损或在安装 OL 时使用人工而产生的问题所需的材料和时间成本进行了分析,并与为减少经济损失而提出的解决方案进行了比较。结果:为解决接触线(CL)对 OL 的负面电磁影响问题,设计了一种移动式机械化综合装置(MMC)来提供帮助,该装置分 6 个步骤对 OL 导线进行换位,每个支撑滚动 60°。通过这种方法,我们可以将 OL 线与接触线等距放置。以每个支架滚动一次的频率,可以调整线性电气参数的不对称。总之,MMC 以自动模式进行安装。CL 的绝缘耦合装置 (ICD) 可以减少 CW 烧损的问题。ICD CL 是一组阶跃电阻,位于中性线前后的相线外侧。其目的是将电流降至安全值,从而不会导致接触线烧毁、CN 和/或机车车辆故障以及可能对他人财产造成的损害。实际意义:结果是一套以 MMC 为形式的措施,用于减少 CN 和 ICD CL 影响造成的架空线路经济损失,通过保持接触线的可操作性来减少接触网的损失。
Reduction of Economic Losses in the Contact Network and Overhead Lines Electrified with Alternating Current
Purpose: To reduce economic losses in the contact network (CN) and overhead lines (OL) electrified with alternating current. The existing electromagnetic influences on the alternating current railway lead to significant economic losses. Additionally, there is a problem of the contact wire (CW) burnout during the passage of a neutral section with a raised pantograph under voltage on a high-speed railway line (HSRL). CW burnout leads to failure of the contact network, repair costs, possible damage to other people’s property and rolling stock. As a whole, all this represents significant economic losses. Methods: The analysis of material and time costs for the elimination of problems that arise due to the CW burnout or due to the use of manual labor during the installation of OL has been carried out, in comparison with the proposed solutions to reduce economic losses. Results: In solving the problem of the negative electromagnetic influence of the contact line (CL) on the OL, a mobile mechanized complex (MMC) is designed to help, which performs the transposition of the OL wires in 6 steps with scrolling by 60° each support. This method will allow us to place the OL wires equidistantly from the contact wire. Scrolling with once-per-support frequency will align the asymmetry of the linear electrical parameters. All in all, MMC performs installation in an automated mode. The problems of the CW burnout can be reduced by the insulating coupling device (ICD) of the CL. ICD CL is a set of step resistances, which are located at the outer sections of the phase wires before and after the neutral section. It is aimed at reducing the current to a safe value, which will not lead to the contact wire burnout, failure of the CN and/or rolling stock and possible damage to other people’s property. Practical significance: The result is a set of measures in the form of MMC to reduce economic losses in overhead lines from the influence of CN and ICD CL to reduce losses in the contact network by maintaining the operability of the contact wire.