Muhammad Ar Rayyan Firdaus, Rahma Uyun Asalina, Asri Nurdiana, Bambang Setiabudi
{"title":"迪波内戈罗大学公共卫生学院院长办公室和报告厅 5D 模型","authors":"Muhammad Ar Rayyan Firdaus, Rahma Uyun Asalina, Asri Nurdiana, Bambang Setiabudi","doi":"10.14710/pilars.1.3.2023.45-59","DOIUrl":null,"url":null,"abstract":"Redesign is the critical point of the construction process which aims to provide technical specification requirements that will be used at the project later. In project planning, more time and accuracy are needed to obtain the required output. Therefore, it is necessary to use BIM or Building Information Modeling software to simplify, speed up and minimize errors due to human error. This Project was made a redesign the Dean's Building and Lecture project of the Faculty of Public Health, Diponegoro University using the BIM or Building Information Modeling application which aims to streamline structural, planning work, financing estimation, and scheduling processes. The method used is a literature study with the main data of design drawing and others data from the construction project of the Dean Building and Lectures of the Faculty of Public Health, Diponegoro University. The preparation of this Project goes through 3 stages. The first stage is to redesign the FKM Building project using Autodes Revit, the second stage is analyzing the structure with SAP 2000 and Ms Excel applications then the third stage is replanning cost estimation and scheduling using Ms Excel and Ms Project. The result of this Final Project is to obtain new best drawings, material specifications, cost estimation and scheduling.","PeriodicalId":499903,"journal":{"name":"Jurnal Sipil dan Arsitektur","volume":"96 16","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-12-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Model 5D Gedung Dekanat dan Perkuliahan Fakultas Kesehatan Masyarakat, Universitas Diponegoro\",\"authors\":\"Muhammad Ar Rayyan Firdaus, Rahma Uyun Asalina, Asri Nurdiana, Bambang Setiabudi\",\"doi\":\"10.14710/pilars.1.3.2023.45-59\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Redesign is the critical point of the construction process which aims to provide technical specification requirements that will be used at the project later. In project planning, more time and accuracy are needed to obtain the required output. Therefore, it is necessary to use BIM or Building Information Modeling software to simplify, speed up and minimize errors due to human error. This Project was made a redesign the Dean's Building and Lecture project of the Faculty of Public Health, Diponegoro University using the BIM or Building Information Modeling application which aims to streamline structural, planning work, financing estimation, and scheduling processes. The method used is a literature study with the main data of design drawing and others data from the construction project of the Dean Building and Lectures of the Faculty of Public Health, Diponegoro University. The preparation of this Project goes through 3 stages. The first stage is to redesign the FKM Building project using Autodes Revit, the second stage is analyzing the structure with SAP 2000 and Ms Excel applications then the third stage is replanning cost estimation and scheduling using Ms Excel and Ms Project. The result of this Final Project is to obtain new best drawings, material specifications, cost estimation and scheduling.\",\"PeriodicalId\":499903,\"journal\":{\"name\":\"Jurnal Sipil dan Arsitektur\",\"volume\":\"96 16\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-12-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Sipil dan Arsitektur\",\"FirstCategoryId\":\"0\",\"ListUrlMain\":\"https://doi.org/10.14710/pilars.1.3.2023.45-59\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Sipil dan Arsitektur","FirstCategoryId":"0","ListUrlMain":"https://doi.org/10.14710/pilars.1.3.2023.45-59","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
重新设计是施工过程的关键点,旨在提供将在项目中使用的技术规范要求。在项目规划中,需要更多的时间和准确性来获得所需的输出。因此,有必要使用BIM或Building Information Modeling软件来简化、加速和减少人为错误造成的错误。该项目是对迪波尼戈罗大学公共卫生学院院长大楼和讲座项目的重新设计,使用BIM或建筑信息模型应用程序,旨在简化结构、规划工作、融资估算和调度流程。使用的方法是文献研究法,主要数据是设计图,其他数据来自迪波涅戈罗大学院长楼建设项目和公共卫生学院讲座。本项目的准备工作分为三个阶段。第一阶段是使用Autodes Revit重新设计FKM Building项目,第二阶段是使用SAP 2000和Ms Excel应用程序分析结构,然后第三阶段是使用Ms Excel和Ms project重新规划成本估算和调度。最终项目的结果是获得新的最佳图纸,材料规格,成本估算和调度。
Model 5D Gedung Dekanat dan Perkuliahan Fakultas Kesehatan Masyarakat, Universitas Diponegoro
Redesign is the critical point of the construction process which aims to provide technical specification requirements that will be used at the project later. In project planning, more time and accuracy are needed to obtain the required output. Therefore, it is necessary to use BIM or Building Information Modeling software to simplify, speed up and minimize errors due to human error. This Project was made a redesign the Dean's Building and Lecture project of the Faculty of Public Health, Diponegoro University using the BIM or Building Information Modeling application which aims to streamline structural, planning work, financing estimation, and scheduling processes. The method used is a literature study with the main data of design drawing and others data from the construction project of the Dean Building and Lectures of the Faculty of Public Health, Diponegoro University. The preparation of this Project goes through 3 stages. The first stage is to redesign the FKM Building project using Autodes Revit, the second stage is analyzing the structure with SAP 2000 and Ms Excel applications then the third stage is replanning cost estimation and scheduling using Ms Excel and Ms Project. The result of this Final Project is to obtain new best drawings, material specifications, cost estimation and scheduling.