Jakub Lewandowski, Robert Pilch, Maksymilian Smolnik
{"title":"使用改进的决策随机模型验证更新策略","authors":"Jakub Lewandowski, Robert Pilch, Maksymilian Smolnik","doi":"10.5604/01.3001.0053.7128","DOIUrl":null,"url":null,"abstract":"The paper presents a verification of the preventive renewal strategies obtained with the decision-random models modified to take into consideration the diverse nature of maintenance activities. The analysis of the obtained strategies was performed by simulation, considering changes to the input values. The costs and numbers of maintenance activities were summarized depending on the individual values, and the total costs of the strategies obtained from the model were compared with strategies assuming renewal every shorter and longer period. This allowed conclusions to be made about the economic viability of using the presented algorithm.","PeriodicalId":499758,"journal":{"name":"Journal of Konbin","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Verification of the renewal strategy obtained using a modified decision-random model\",\"authors\":\"Jakub Lewandowski, Robert Pilch, Maksymilian Smolnik\",\"doi\":\"10.5604/01.3001.0053.7128\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper presents a verification of the preventive renewal strategies obtained with the decision-random models modified to take into consideration the diverse nature of maintenance activities. The analysis of the obtained strategies was performed by simulation, considering changes to the input values. The costs and numbers of maintenance activities were summarized depending on the individual values, and the total costs of the strategies obtained from the model were compared with strategies assuming renewal every shorter and longer period. This allowed conclusions to be made about the economic viability of using the presented algorithm.\",\"PeriodicalId\":499758,\"journal\":{\"name\":\"Journal of Konbin\",\"volume\":\"6 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-06-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Konbin\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5604/01.3001.0053.7128\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Konbin","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5604/01.3001.0053.7128","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Verification of the renewal strategy obtained using a modified decision-random model
The paper presents a verification of the preventive renewal strategies obtained with the decision-random models modified to take into consideration the diverse nature of maintenance activities. The analysis of the obtained strategies was performed by simulation, considering changes to the input values. The costs and numbers of maintenance activities were summarized depending on the individual values, and the total costs of the strategies obtained from the model were compared with strategies assuming renewal every shorter and longer period. This allowed conclusions to be made about the economic viability of using the presented algorithm.