基于 Autodesk BIM(通过 Revit、Naviswork 和 SAP2000 进行集成)的 Awann 集团总部大楼结构重新设计

Adam Rizky Christiandava, Adelia Azzahra, Asri Nurdiana, Bambang Setiabudi
{"title":"基于 Autodesk BIM(通过 Revit、Naviswork 和 SAP2000 进行集成)的 Awann 集团总部大楼结构重新设计","authors":"Adam Rizky Christiandava, Adelia Azzahra, Asri Nurdiana, Bambang Setiabudi","doi":"10.14710/pilars.1.1.2023.16-32","DOIUrl":null,"url":null,"abstract":"Building Information Modeling (BIM), implementation is an innovative advancement in the construction industry. Generally, developing a construction project requires several phases in which information is created manually using a lot of software. Unfortunately, the steps that must be completed in conventional software for project management are inefficient and susceptible to misinterpretation, which frequently causes issues. Therefore, this study focuses on re-planning the Awann Group Semarang Head Office Building using BIM integration based on Autodesk Revit, Naviswork, and SAP 2000 planning software. Re-planning is conducted under SNI 2847-2019 for structural concrete planning requirements, SNI 1727-2020 for minimum load review, and SNI 1726-2019 for structural earthquake resistance standards. This plan produces structural analysis for calculating the feasibility of a building structure, 3D designs from Revit software that can generate 2D designs for Detail Engineering Designs, and work volumes for RAB calculations. Then, for scheduling, Revit will be integrated with Naviswork, which can display scheduling with 3D visualization. The re-planning of the Head office of the Awan Group Semarang resulted in a budget plan of Rp. 4,661,246,792.98 was calculated using the automatic Quantity Take Off from Autodesk Revit and scheduling planning using Microsoft Project and Autodesk Naviswork for ten months of work.","PeriodicalId":499903,"journal":{"name":"Jurnal Sipil dan Arsitektur","volume":"297 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Re-Design Struktur Gedung Head Office Awann Group Berdasarkan Integrasi BIM Autodesk melalui Revit, Naviswork, dan SAP2000\",\"authors\":\"Adam Rizky Christiandava, Adelia Azzahra, Asri Nurdiana, Bambang Setiabudi\",\"doi\":\"10.14710/pilars.1.1.2023.16-32\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Building Information Modeling (BIM), implementation is an innovative advancement in the construction industry. Generally, developing a construction project requires several phases in which information is created manually using a lot of software. Unfortunately, the steps that must be completed in conventional software for project management are inefficient and susceptible to misinterpretation, which frequently causes issues. Therefore, this study focuses on re-planning the Awann Group Semarang Head Office Building using BIM integration based on Autodesk Revit, Naviswork, and SAP 2000 planning software. Re-planning is conducted under SNI 2847-2019 for structural concrete planning requirements, SNI 1727-2020 for minimum load review, and SNI 1726-2019 for structural earthquake resistance standards. This plan produces structural analysis for calculating the feasibility of a building structure, 3D designs from Revit software that can generate 2D designs for Detail Engineering Designs, and work volumes for RAB calculations. Then, for scheduling, Revit will be integrated with Naviswork, which can display scheduling with 3D visualization. The re-planning of the Head office of the Awan Group Semarang resulted in a budget plan of Rp. 4,661,246,792.98 was calculated using the automatic Quantity Take Off from Autodesk Revit and scheduling planning using Microsoft Project and Autodesk Naviswork for ten months of work.\",\"PeriodicalId\":499903,\"journal\":{\"name\":\"Jurnal Sipil dan Arsitektur\",\"volume\":\"297 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-06-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Sipil dan Arsitektur\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.14710/pilars.1.1.2023.16-32\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Sipil dan Arsitektur","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14710/pilars.1.1.2023.16-32","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

建筑信息模型(BIM)的实施是建筑行业的创新进步。一般来说,开发一个构建项目需要几个阶段,在这些阶段中,信息是使用大量软件手动创建的。不幸的是,在项目管理的传统软件中必须完成的步骤是低效的,并且容易被误解,这经常导致问题。因此,本研究的重点是利用基于Autodesk Revit, Naviswork和SAP 2000规划软件的BIM集成对Awann集团三宝郎总部大楼进行重新规划。根据结构混凝土规划要求的SNI 2847-2019、最小荷载审查的SNI 1727-2020和结构抗震标准的SNI 1726-2019进行重新规划。该计划生成用于计算建筑结构可行性的结构分析,来自Revit软件的3D设计,可以生成用于详细工程设计的2D设计,以及用于RAB计算的工作量。然后,对于调度,Revit将与Naviswork集成,可以用3D可视化显示调度。Awan Group Semarang总部的重新规划导致预算计划为Rp. 4,661,246,792.98,使用Autodesk Revit的自动数量计算和使用Microsoft Project和Autodesk Naviswork的十个月工作调度计划。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Re-Design Struktur Gedung Head Office Awann Group Berdasarkan Integrasi BIM Autodesk melalui Revit, Naviswork, dan SAP2000
Building Information Modeling (BIM), implementation is an innovative advancement in the construction industry. Generally, developing a construction project requires several phases in which information is created manually using a lot of software. Unfortunately, the steps that must be completed in conventional software for project management are inefficient and susceptible to misinterpretation, which frequently causes issues. Therefore, this study focuses on re-planning the Awann Group Semarang Head Office Building using BIM integration based on Autodesk Revit, Naviswork, and SAP 2000 planning software. Re-planning is conducted under SNI 2847-2019 for structural concrete planning requirements, SNI 1727-2020 for minimum load review, and SNI 1726-2019 for structural earthquake resistance standards. This plan produces structural analysis for calculating the feasibility of a building structure, 3D designs from Revit software that can generate 2D designs for Detail Engineering Designs, and work volumes for RAB calculations. Then, for scheduling, Revit will be integrated with Naviswork, which can display scheduling with 3D visualization. The re-planning of the Head office of the Awan Group Semarang resulted in a budget plan of Rp. 4,661,246,792.98 was calculated using the automatic Quantity Take Off from Autodesk Revit and scheduling planning using Microsoft Project and Autodesk Naviswork for ten months of work.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信