{"title":"采用Lean Six Sigma方法还原凉鞋生产的浪费","authors":"Firna Elshadi, Chaznin R. Muhammad","doi":"10.29313/jrti.v2i1.664","DOIUrl":null,"url":null,"abstract":"Abstract. UKM X is a company that produces sandals. In producing sandals, there are several problems including waste in the form of waiting time which causes waste in the form of inventory. And there are other wastes in the form of defects. Based on this phenomenon, the problems in this study are formulated as follows: (1) What types of waste are found in the sandal shoe production line? (2) What are the causes and how to overcome the waste that occurs? (3) What are the proposed improvements to overcome waste? This study uses the Lean Six Sigma metho. In the define stage, using tools in the form of a Value Stream Map, calculating Process Cycle Efficiency (PCE), and identifying waste based on the results of the seven waste questionnaire. The measure stage includes determining critical waste and calculating Defects Per Million Opportunity (DPMO). The analyze stage uses fishbone and makes Failure Mode and Effect Analysis (FMEA). Then the last stage is the improve and control stage using the Plan Do Check Act (PDCA) stage and projecting the proposed improvement using the Value Stream Map (Future State). The results of this study are: the operator of the raw material warehouse checks raw materials to be more thorough, selects the right supplier, prepares the raw material specification form and performs production scheduling by prioritizing products that have a shorter process to be produced first. \nAbstrak. UKM X merupakan perusahaan yang memproduksi sepatu sandal. Dalam memproduksi sepatu sandal terdapat beberapa persoalan meliputi waste berupa waiting time yang menyebabkan waste berupa inventory. Serta terdapat waste lain berupa defect. Berdasarkan fenomena tersebut, maka permasalahan dalam penelitian ini dirumuskan sebagai berikut: (1) Apa jenis waste yang terdapat pada lini produksi sepatu sandal? (2) Apa penyebab dan bagaimana cara mengatasi waste yang terjadi? (3) Apa usulan perbaikan untuk mengatasi waste? Penelitian ini menggunakan metode Lean Six Sigma. Pada tahap define menggunakan tools berupa Value Stream Map, perhitungan Process Cycle Efficiency (PCE), dan identifikasi waste berdasarkan hasil kuisioner seven waste. Tahap measure meliputi penentuan critical waste dan perhitungan Defects Per Million Opportunity (DPMO). Tahap analyze menggunakan fishbone dan pembuatan Failure Mode and Effect Analysis (FMEA). Kemudian tahap terakhir yakni tahap improve dan control menggunakan tahapan Plan Do Check Act (PDCA) dan memproyeksikan usulan perbaikan dengan Value Stream Map (Future State). Hasil dari penelitian ini adalah: operator bagian gudang bahan baku memeriksa bahan baku agar lebih teliti, pemilihan supplier yang tepat, menyiapkan form spesifikasi bahan baku dan melakukan penjadwalan produksi dengan memprioritaskan produk yang memiliki proses lebih pendek untuk diproduksi terlebih dahulu.","PeriodicalId":276819,"journal":{"name":"Jurnal Riset Teknik Industri","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Penerapan Metode Lean Six Sigma untuk Mereduksi Waste pada Produksi Sepatu Sandal\",\"authors\":\"Firna Elshadi, Chaznin R. Muhammad\",\"doi\":\"10.29313/jrti.v2i1.664\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract. UKM X is a company that produces sandals. In producing sandals, there are several problems including waste in the form of waiting time which causes waste in the form of inventory. And there are other wastes in the form of defects. Based on this phenomenon, the problems in this study are formulated as follows: (1) What types of waste are found in the sandal shoe production line? (2) What are the causes and how to overcome the waste that occurs? (3) What are the proposed improvements to overcome waste? This study uses the Lean Six Sigma metho. In the define stage, using tools in the form of a Value Stream Map, calculating Process Cycle Efficiency (PCE), and identifying waste based on the results of the seven waste questionnaire. The measure stage includes determining critical waste and calculating Defects Per Million Opportunity (DPMO). The analyze stage uses fishbone and makes Failure Mode and Effect Analysis (FMEA). Then the last stage is the improve and control stage using the Plan Do Check Act (PDCA) stage and projecting the proposed improvement using the Value Stream Map (Future State). The results of this study are: the operator of the raw material warehouse checks raw materials to be more thorough, selects the right supplier, prepares the raw material specification form and performs production scheduling by prioritizing products that have a shorter process to be produced first. \\nAbstrak. UKM X merupakan perusahaan yang memproduksi sepatu sandal. Dalam memproduksi sepatu sandal terdapat beberapa persoalan meliputi waste berupa waiting time yang menyebabkan waste berupa inventory. Serta terdapat waste lain berupa defect. Berdasarkan fenomena tersebut, maka permasalahan dalam penelitian ini dirumuskan sebagai berikut: (1) Apa jenis waste yang terdapat pada lini produksi sepatu sandal? (2) Apa penyebab dan bagaimana cara mengatasi waste yang terjadi? (3) Apa usulan perbaikan untuk mengatasi waste? Penelitian ini menggunakan metode Lean Six Sigma. Pada tahap define menggunakan tools berupa Value Stream Map, perhitungan Process Cycle Efficiency (PCE), dan identifikasi waste berdasarkan hasil kuisioner seven waste. Tahap measure meliputi penentuan critical waste dan perhitungan Defects Per Million Opportunity (DPMO). Tahap analyze menggunakan fishbone dan pembuatan Failure Mode and Effect Analysis (FMEA). Kemudian tahap terakhir yakni tahap improve dan control menggunakan tahapan Plan Do Check Act (PDCA) dan memproyeksikan usulan perbaikan dengan Value Stream Map (Future State). Hasil dari penelitian ini adalah: operator bagian gudang bahan baku memeriksa bahan baku agar lebih teliti, pemilihan supplier yang tepat, menyiapkan form spesifikasi bahan baku dan melakukan penjadwalan produksi dengan memprioritaskan produk yang memiliki proses lebih pendek untuk diproduksi terlebih dahulu.\",\"PeriodicalId\":276819,\"journal\":{\"name\":\"Jurnal Riset Teknik Industri\",\"volume\":\"4 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-07-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Riset Teknik Industri\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.29313/jrti.v2i1.664\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Riset Teknik Industri","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29313/jrti.v2i1.664","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
摘要UKM X是一家生产凉鞋的公司。在凉鞋的生产中,有几个问题,包括等待时间的浪费,这导致了库存的浪费。还有其他以缺陷形式存在的浪费。基于这一现象,本研究的问题制定如下:(1)在凉鞋鞋生产线中存在哪些类型的废弃物?(2)产生浪费的原因是什么?如何克服浪费?(3)建议采取哪些措施来克服浪费?本研究采用精益六西格玛方法。在定义阶段,使用价值流图形式的工具,计算过程周期效率(PCE),并根据七个浪费问卷的结果识别浪费。度量阶段包括确定关键浪费和计算每百万机会的缺陷(DPMO)。分析阶段采用鱼骨法进行失效模式与影响分析(FMEA)。最后一个阶段是改进和控制阶段,使用计划、执行、检查法案(PDCA)阶段,并使用价值流图(未来状态)规划建议的改进。本研究的结果是:原材料仓库操作员对原材料的检查更加彻底,选择合适的供应商,准备原材料规格表,并通过优先生产过程较短的产品来进行生产调度。Abstrak。UKM X merupakan perushaan yang成员产品分离凉鞋。达兰公司产品有分门别类、三脚架、三脚架、三脚架、三脚架、三脚架、三脚架、三脚架、三脚架、三脚架、三脚架、三脚架、三脚架、三脚架等。Serta的废物是一个缺陷。Berdasarkan现象tersebut, maka permasalahan dalam penelitian ini dirumuskan sebagai berikut:(1) Apa jenis waste yang terdapat padlini producksi sepatu sandal?(2) Apa penyebab dan bagaimana cara mengatasi waste yang terjadi?(3) a usulan perbaikan untuk mengatasi废物?Penelitian ini menggunakan方法精益六西格玛。帕达塔哈定义的管理工具包括价值流图、流程循环效率(PCE)、管理废物识别、管理废物识别、管理废物识别、管理废物识别等。塔哈普测量了临界浪费的质量和百万分缺陷率(DPMO)。塔哈分析孟古那坎鱼骨丹蓬瓦滩失效模式与效应分析(FMEA)。Kemudian tahap terakhir yakni tahap改善dan控制menggunakan tahapan计划执行检查法案(PDCA) dan memproyekkkan usulan perbaikan dengan价值流图(未来状态)。Hasil dari penelitian ini adalah:运营商bagian gudang bahan baku memeriksa bahan baku agar lebih teliti,供应商yang tepat, menyiapkan形式为specifikasi bahan baku,但melakukan penjadwalan产品dengan mempririitaskan产品yang memiliki加工lebih pendek untuk diproduksi terlebih dahulu。
Penerapan Metode Lean Six Sigma untuk Mereduksi Waste pada Produksi Sepatu Sandal
Abstract. UKM X is a company that produces sandals. In producing sandals, there are several problems including waste in the form of waiting time which causes waste in the form of inventory. And there are other wastes in the form of defects. Based on this phenomenon, the problems in this study are formulated as follows: (1) What types of waste are found in the sandal shoe production line? (2) What are the causes and how to overcome the waste that occurs? (3) What are the proposed improvements to overcome waste? This study uses the Lean Six Sigma metho. In the define stage, using tools in the form of a Value Stream Map, calculating Process Cycle Efficiency (PCE), and identifying waste based on the results of the seven waste questionnaire. The measure stage includes determining critical waste and calculating Defects Per Million Opportunity (DPMO). The analyze stage uses fishbone and makes Failure Mode and Effect Analysis (FMEA). Then the last stage is the improve and control stage using the Plan Do Check Act (PDCA) stage and projecting the proposed improvement using the Value Stream Map (Future State). The results of this study are: the operator of the raw material warehouse checks raw materials to be more thorough, selects the right supplier, prepares the raw material specification form and performs production scheduling by prioritizing products that have a shorter process to be produced first.
Abstrak. UKM X merupakan perusahaan yang memproduksi sepatu sandal. Dalam memproduksi sepatu sandal terdapat beberapa persoalan meliputi waste berupa waiting time yang menyebabkan waste berupa inventory. Serta terdapat waste lain berupa defect. Berdasarkan fenomena tersebut, maka permasalahan dalam penelitian ini dirumuskan sebagai berikut: (1) Apa jenis waste yang terdapat pada lini produksi sepatu sandal? (2) Apa penyebab dan bagaimana cara mengatasi waste yang terjadi? (3) Apa usulan perbaikan untuk mengatasi waste? Penelitian ini menggunakan metode Lean Six Sigma. Pada tahap define menggunakan tools berupa Value Stream Map, perhitungan Process Cycle Efficiency (PCE), dan identifikasi waste berdasarkan hasil kuisioner seven waste. Tahap measure meliputi penentuan critical waste dan perhitungan Defects Per Million Opportunity (DPMO). Tahap analyze menggunakan fishbone dan pembuatan Failure Mode and Effect Analysis (FMEA). Kemudian tahap terakhir yakni tahap improve dan control menggunakan tahapan Plan Do Check Act (PDCA) dan memproyeksikan usulan perbaikan dengan Value Stream Map (Future State). Hasil dari penelitian ini adalah: operator bagian gudang bahan baku memeriksa bahan baku agar lebih teliti, pemilihan supplier yang tepat, menyiapkan form spesifikasi bahan baku dan melakukan penjadwalan produksi dengan memprioritaskan produk yang memiliki proses lebih pendek untuk diproduksi terlebih dahulu.