{"title":"基于效用功能的行业超前规划系统(APS)","authors":"Y. Mauergauz","doi":"10.30564/jmser.v6i2.5774","DOIUrl":null,"url":null,"abstract":"This paper contains the example of sectoral APS systems, for which the problem algorithmic space coincides with the relevant operational environment with great accuracy. The method of scheduling for technological processes with looping is described, based on the simultaneous application of two criteria: the value of relative direct costs and the average utility of order fulfillment. The influence of buffers on the work of shops is considered. The proposed method provides an automatic grouping of the same type of jobs on all machines involved while taking into account the required duration of jobs. A package of application programs has been developed that allows planning for an average number of orders. The result of the program is a set of non-dominant (not improved) options that are offered to the user for making a final decision.","PeriodicalId":227013,"journal":{"name":"Journal of Management Science & Engineering Research","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Sectoral Advanced Planning Systems (APS) Based on Utility Functions\",\"authors\":\"Y. Mauergauz\",\"doi\":\"10.30564/jmser.v6i2.5774\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper contains the example of sectoral APS systems, for which the problem algorithmic space coincides with the relevant operational environment with great accuracy. The method of scheduling for technological processes with looping is described, based on the simultaneous application of two criteria: the value of relative direct costs and the average utility of order fulfillment. The influence of buffers on the work of shops is considered. The proposed method provides an automatic grouping of the same type of jobs on all machines involved while taking into account the required duration of jobs. A package of application programs has been developed that allows planning for an average number of orders. The result of the program is a set of non-dominant (not improved) options that are offered to the user for making a final decision.\",\"PeriodicalId\":227013,\"journal\":{\"name\":\"Journal of Management Science & Engineering Research\",\"volume\":\"5 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Management Science & Engineering Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30564/jmser.v6i2.5774\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Management Science & Engineering Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30564/jmser.v6i2.5774","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文以行业APS系统为例,该系统的问题算法空间与相关运行环境高度吻合。基于相对直接成本值和订单履行的平均效用两个标准的同时应用,描述了具有循环的工艺流程调度方法。考虑了缓冲层对车间工作的影响。所提出的方法在考虑到作业所需持续时间的同时,为所有涉及的机器上的相同类型的作业提供了自动分组。已经开发了一套应用程序,允许对平均订单数量进行规划。程序的结果是提供给用户的一组非主导(非改进)选项,供用户做出最终决定。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Sectoral Advanced Planning Systems (APS) Based on Utility Functions
This paper contains the example of sectoral APS systems, for which the problem algorithmic space coincides with the relevant operational environment with great accuracy. The method of scheduling for technological processes with looping is described, based on the simultaneous application of two criteria: the value of relative direct costs and the average utility of order fulfillment. The influence of buffers on the work of shops is considered. The proposed method provides an automatic grouping of the same type of jobs on all machines involved while taking into account the required duration of jobs. A package of application programs has been developed that allows planning for an average number of orders. The result of the program is a set of non-dominant (not improved) options that are offered to the user for making a final decision.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信