基于ilog的作业车间制造混合计划调度系统

S. Răileanu, T. Borangiu, O. Morariu, O. Stocklosa
{"title":"基于ilog的作业车间制造混合计划调度系统","authors":"S. Răileanu, T. Borangiu, O. Morariu, O. Stocklosa","doi":"10.1109/AQTR.2014.6857898","DOIUrl":null,"url":null,"abstract":"The paper presents the design and realization of an optimization model for the jobshop planning and execution problem. The computational model is realized in using the IBM ILOG OPL application. The computation of optimized planning and scheduling is performed using the constraint programming technique. The model contains the input data (client orders and resource status), the objective function (makespan minimization) and the set of constraints related to the real execution of products and to the limitations of the production system. The proposed model, implemented in ILOG OPL, is integrated into a centralized Scheduling System which transfers the planning and scheduling results to the shop floor automation layer of the Manufacturing Execution System (MES).","PeriodicalId":297141,"journal":{"name":"2014 IEEE International Conference on Automation, Quality and Testing, Robotics","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-05-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"ILOG-based mixed planning and scheduling system for job-shop manufacturing\",\"authors\":\"S. Răileanu, T. Borangiu, O. Morariu, O. Stocklosa\",\"doi\":\"10.1109/AQTR.2014.6857898\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper presents the design and realization of an optimization model for the jobshop planning and execution problem. The computational model is realized in using the IBM ILOG OPL application. The computation of optimized planning and scheduling is performed using the constraint programming technique. The model contains the input data (client orders and resource status), the objective function (makespan minimization) and the set of constraints related to the real execution of products and to the limitations of the production system. The proposed model, implemented in ILOG OPL, is integrated into a centralized Scheduling System which transfers the planning and scheduling results to the shop floor automation layer of the Manufacturing Execution System (MES).\",\"PeriodicalId\":297141,\"journal\":{\"name\":\"2014 IEEE International Conference on Automation, Quality and Testing, Robotics\",\"volume\":\"8 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-05-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 IEEE International Conference on Automation, Quality and Testing, Robotics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/AQTR.2014.6857898\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE International Conference on Automation, Quality and Testing, Robotics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AQTR.2014.6857898","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

针对作业车间规划与执行问题,提出了一个优化模型的设计与实现。该计算模型是利用IBM ILOG OPL应用程序实现的。采用约束规划技术进行优化规划和调度计算。该模型包含输入数据(客户订单和资源状态)、目标函数(最大完工时间最小化)以及与产品的实际执行和生产系统的限制相关的约束集。该模型在ILOG OPL中实现,并集成到一个集中调度系统中,该系统将计划和调度结果传递给制造执行系统(MES)的车间自动化层。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ILOG-based mixed planning and scheduling system for job-shop manufacturing
The paper presents the design and realization of an optimization model for the jobshop planning and execution problem. The computational model is realized in using the IBM ILOG OPL application. The computation of optimized planning and scheduling is performed using the constraint programming technique. The model contains the input data (client orders and resource status), the objective function (makespan minimization) and the set of constraints related to the real execution of products and to the limitations of the production system. The proposed model, implemented in ILOG OPL, is integrated into a centralized Scheduling System which transfers the planning and scheduling results to the shop floor automation layer of the Manufacturing Execution System (MES).
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信