印度尼西亚北加里曼丹Tarakan Pamusian油田案例研究:将油井恢复作业的成功率提高到80%

I. Kurniawan
{"title":"印度尼西亚北加里曼丹Tarakan Pamusian油田案例研究:将油井恢复作业的成功率提高到80%","authors":"I. Kurniawan","doi":"10.29118/ipa22-e-63","DOIUrl":null,"url":null,"abstract":"Pamusian Field is located in northern part of North Kalimantan, Zona 10, Pertamina Hulu Indonesia area, approximately 1 km Southeast from Center of Tarakan City. Pamusian field is one of Top Ten Fields (Kalimantan Area under Pertamina EP operation Area) based on its OOIP, 553 MMSTB approximately with more than 1200 wells drilled since 1905 (brown field). However, this role doesn’t mean Pamusian production stands at tremendous number of productions. Moreover, only 50 active wells contribute to Pamusian oil production. More than 1000 wells are idles even though there bunch of oil opportunities on the idle wells. As an overall, Pamusian oil production remained constant for around 500 BOPD at 3 years back before massive reactivation delivered in 2021 & impacting to production gain achieve 150-200 BOPD gain in 2021. In the end of 2020, aligned with company’s goal to maximize existing Asset, the idea of production optimization was commissioned by improving success ratio of well reactivation job in Pamusian Field. In the last 3 years, success ratio of well reactivation job was not encouraging. The team focused on all aspects of optimization & reactivation practices. Field review & reactivation lookback are aggressively conducted to figure out Pamusian Field problems. Lack of workover & well intervention jobs, inadequate surveillance data, and miss perception of well reactivation method are raised to be the root cause for under developed field. Another surprising fact is more than a hundred attics wells located up dip in Main Closure not active (idle) which has lower surrounding well in a good oil production performance (10-30 BOPD) BOPD with various of water cut 90%. Again, this is real opportunity! Low hanging fruit to become more oil by producing those wells. An integrated and comprehensive assessment successfully delivered. Subsurface assessment cover the geological and reservoir engineering assessment. The most important outcome of this assessment is reactivation method recommendation, it’s called Locomotive (Low Cost, Massive Impact, & Innovative). Three innovations created and delivered to conduct well reactivation jobs in Pamusian field, there are Subsurface Data Hierarchy Development (to set subsurface confident level), Fill up Annulus Activity (to check fluid sample), and Locomotive Risk Mapping Assessment (to set priority by comparing confident & impact level) as decision tool. These reactivation methods delivered in high confidence level of success. Resulting a dramatic rise of success ratio up to 80% (previously 30% at 3 years back) and oil gain average 150 – 200 BOPD which remained stable for several months until early 2022. Another campaign of well reactivation programs was carried out after right to other wells and fields. Another typical reactivation was implemented, which had impressive results. All the objectives define were achieved. The outcome of the reactivation program was completely successful and exceeded the expectations which will be beneficial for value of information in capturing optimizing and development opportunities. This reactivation campaign in 2021 successfully added real oil gain & arrest production decline in Pamusian Field.","PeriodicalId":442360,"journal":{"name":"Proceedings of Indonesian Petroleum Association, 46th Annual Convention & Exhibition, 2022","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-09-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A Successful Story: Improving Success Ratio Up To 80% of Well Reactivation Job Pamusian Field Case Study, Tarakan, North Kalimantan, Indonesia\",\"authors\":\"I. Kurniawan\",\"doi\":\"10.29118/ipa22-e-63\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Pamusian Field is located in northern part of North Kalimantan, Zona 10, Pertamina Hulu Indonesia area, approximately 1 km Southeast from Center of Tarakan City. Pamusian field is one of Top Ten Fields (Kalimantan Area under Pertamina EP operation Area) based on its OOIP, 553 MMSTB approximately with more than 1200 wells drilled since 1905 (brown field). However, this role doesn’t mean Pamusian production stands at tremendous number of productions. Moreover, only 50 active wells contribute to Pamusian oil production. More than 1000 wells are idles even though there bunch of oil opportunities on the idle wells. As an overall, Pamusian oil production remained constant for around 500 BOPD at 3 years back before massive reactivation delivered in 2021 & impacting to production gain achieve 150-200 BOPD gain in 2021. In the end of 2020, aligned with company’s goal to maximize existing Asset, the idea of production optimization was commissioned by improving success ratio of well reactivation job in Pamusian Field. In the last 3 years, success ratio of well reactivation job was not encouraging. The team focused on all aspects of optimization & reactivation practices. Field review & reactivation lookback are aggressively conducted to figure out Pamusian Field problems. Lack of workover & well intervention jobs, inadequate surveillance data, and miss perception of well reactivation method are raised to be the root cause for under developed field. Another surprising fact is more than a hundred attics wells located up dip in Main Closure not active (idle) which has lower surrounding well in a good oil production performance (10-30 BOPD) BOPD with various of water cut 90%. Again, this is real opportunity! Low hanging fruit to become more oil by producing those wells. An integrated and comprehensive assessment successfully delivered. Subsurface assessment cover the geological and reservoir engineering assessment. The most important outcome of this assessment is reactivation method recommendation, it’s called Locomotive (Low Cost, Massive Impact, & Innovative). Three innovations created and delivered to conduct well reactivation jobs in Pamusian field, there are Subsurface Data Hierarchy Development (to set subsurface confident level), Fill up Annulus Activity (to check fluid sample), and Locomotive Risk Mapping Assessment (to set priority by comparing confident & impact level) as decision tool. These reactivation methods delivered in high confidence level of success. Resulting a dramatic rise of success ratio up to 80% (previously 30% at 3 years back) and oil gain average 150 – 200 BOPD which remained stable for several months until early 2022. Another campaign of well reactivation programs was carried out after right to other wells and fields. Another typical reactivation was implemented, which had impressive results. All the objectives define were achieved. The outcome of the reactivation program was completely successful and exceeded the expectations which will be beneficial for value of information in capturing optimizing and development opportunities. This reactivation campaign in 2021 successfully added real oil gain & arrest production decline in Pamusian Field.\",\"PeriodicalId\":442360,\"journal\":{\"name\":\"Proceedings of Indonesian Petroleum Association, 46th Annual Convention & Exhibition, 2022\",\"volume\":\"22 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-09-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of Indonesian Petroleum Association, 46th Annual Convention & Exhibition, 2022\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.29118/ipa22-e-63\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of Indonesian Petroleum Association, 46th Annual Convention & Exhibition, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29118/ipa22-e-63","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

Pamusian油田位于印尼Pertamina Hulu地区北加里曼丹10区北部,距离塔拉干市中心东南约1公里。Pamusian油田是Pertamina EP作业区域下的Kalimantan地区的十大油田之一,其OOIP约为553 MMSTB,自1905年以来钻探了1200多口井(棕色油田)。然而,这个角色并不意味着帕慕斯的作品数量巨大。此外,只有50口活跃的油井对Pamusian的石油产量有贡献。超过1000口井处于闲置状态,尽管闲置井中有大量的石油开采机会。总体而言,在2021年大规模恢复生产之前,Pamusian的石油产量在3年前保持在500桶/天左右,并影响到2021年的产量增长达到150-200桶/天。2020年底,为了实现公司现有资产最大化的目标,通过提高Pamusian油田油井再激活工作的成功率,实现了生产优化的理念。在过去的3年里,复井作业的成功率并不令人鼓舞。该团队专注于优化和再激活实践的各个方面。为了找出Pamusian油田存在的问题,我们积极地进行了现场审查和再激活回顾。修井和修井作业的缺乏、监测数据的不充分以及对井的重新激活方法的认识不足被认为是欠发达油田的根本原因。另一个令人惊讶的事实是,位于主闭包上部的100多口阁楼井处于闲置状态,周围油井较低,产量良好(10-30桶/天),含水率达90%。再说一次,这是真正的机会!通过开采这些油井来获得更多的石油。成功地进行了综合和全面的评估。地下评价包括地质评价和储层工程评价。本次评估最重要的结果是推荐的再激活方法,称为机车(低成本、大影响和创新)。为在Pamusian油田进行井活化作业,开发并交付了三种创新技术,即地下数据层次开发(用于设置地下置信度)、环空填充活动(用于检查流体样本)和机车风险测绘评估(通过比较置信度和影响水平来设置优先级)作为决策工具。这些再激活方法以高信心水平成功交付。结果,成功率大幅提高至80%(3年前为30%),平均产量增加150 - 200桶/天,直到2022年初保持稳定数月。在对其他井和油田进行改造后,又开展了另一项井活化计划。实现了另一个典型的重新激活,结果令人印象深刻。所有确定的目标都已实现。重新激活计划的结果是完全成功的,超出了预期,这将有利于获取优化和开发机会的信息价值。2021年的重新开采活动成功地增加了Pamusian油田的实际石油产量,并阻止了产量的下降。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A Successful Story: Improving Success Ratio Up To 80% of Well Reactivation Job Pamusian Field Case Study, Tarakan, North Kalimantan, Indonesia
Pamusian Field is located in northern part of North Kalimantan, Zona 10, Pertamina Hulu Indonesia area, approximately 1 km Southeast from Center of Tarakan City. Pamusian field is one of Top Ten Fields (Kalimantan Area under Pertamina EP operation Area) based on its OOIP, 553 MMSTB approximately with more than 1200 wells drilled since 1905 (brown field). However, this role doesn’t mean Pamusian production stands at tremendous number of productions. Moreover, only 50 active wells contribute to Pamusian oil production. More than 1000 wells are idles even though there bunch of oil opportunities on the idle wells. As an overall, Pamusian oil production remained constant for around 500 BOPD at 3 years back before massive reactivation delivered in 2021 & impacting to production gain achieve 150-200 BOPD gain in 2021. In the end of 2020, aligned with company’s goal to maximize existing Asset, the idea of production optimization was commissioned by improving success ratio of well reactivation job in Pamusian Field. In the last 3 years, success ratio of well reactivation job was not encouraging. The team focused on all aspects of optimization & reactivation practices. Field review & reactivation lookback are aggressively conducted to figure out Pamusian Field problems. Lack of workover & well intervention jobs, inadequate surveillance data, and miss perception of well reactivation method are raised to be the root cause for under developed field. Another surprising fact is more than a hundred attics wells located up dip in Main Closure not active (idle) which has lower surrounding well in a good oil production performance (10-30 BOPD) BOPD with various of water cut 90%. Again, this is real opportunity! Low hanging fruit to become more oil by producing those wells. An integrated and comprehensive assessment successfully delivered. Subsurface assessment cover the geological and reservoir engineering assessment. The most important outcome of this assessment is reactivation method recommendation, it’s called Locomotive (Low Cost, Massive Impact, & Innovative). Three innovations created and delivered to conduct well reactivation jobs in Pamusian field, there are Subsurface Data Hierarchy Development (to set subsurface confident level), Fill up Annulus Activity (to check fluid sample), and Locomotive Risk Mapping Assessment (to set priority by comparing confident & impact level) as decision tool. These reactivation methods delivered in high confidence level of success. Resulting a dramatic rise of success ratio up to 80% (previously 30% at 3 years back) and oil gain average 150 – 200 BOPD which remained stable for several months until early 2022. Another campaign of well reactivation programs was carried out after right to other wells and fields. Another typical reactivation was implemented, which had impressive results. All the objectives define were achieved. The outcome of the reactivation program was completely successful and exceeded the expectations which will be beneficial for value of information in capturing optimizing and development opportunities. This reactivation campaign in 2021 successfully added real oil gain & arrest production decline in Pamusian Field.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信