{"title":"增加传输容量案例研究和技术通过增加离地间隙增加传输容量-一个制造商的观点","authors":"B. Reisdorff","doi":"10.1109/TDCLLM.2006.340742","DOIUrl":null,"url":null,"abstract":"Utilities throughout North America are faced with existing transmission lines that are limited in capacity due to ground clearance. This limitation can be as much as 20 to 25% of the line's capacity. Therefore utilities have a need to increase ground clearance and have several options available.","PeriodicalId":193517,"journal":{"name":"ESMO 2006 - 2006 IEEE 11th International Conference on Transmission & Distribution Construction, Operation and Live-Line Maintenance","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Increasing Transmission Capacity Case Studies and Techniques Increased Transmission Capacity by Increasing Ground Clearance - A Manufacturers Perspective\",\"authors\":\"B. Reisdorff\",\"doi\":\"10.1109/TDCLLM.2006.340742\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Utilities throughout North America are faced with existing transmission lines that are limited in capacity due to ground clearance. This limitation can be as much as 20 to 25% of the line's capacity. Therefore utilities have a need to increase ground clearance and have several options available.\",\"PeriodicalId\":193517,\"journal\":{\"name\":\"ESMO 2006 - 2006 IEEE 11th International Conference on Transmission & Distribution Construction, Operation and Live-Line Maintenance\",\"volume\":\"31 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ESMO 2006 - 2006 IEEE 11th International Conference on Transmission & Distribution Construction, Operation and Live-Line Maintenance\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDCLLM.2006.340742\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ESMO 2006 - 2006 IEEE 11th International Conference on Transmission & Distribution Construction, Operation and Live-Line Maintenance","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDCLLM.2006.340742","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Increasing Transmission Capacity Case Studies and Techniques Increased Transmission Capacity by Increasing Ground Clearance - A Manufacturers Perspective
Utilities throughout North America are faced with existing transmission lines that are limited in capacity due to ground clearance. This limitation can be as much as 20 to 25% of the line's capacity. Therefore utilities have a need to increase ground clearance and have several options available.