基于PSAT的孟加拉电力系统西部电网潮流仿真及与PowerWorld的性能比较

Shibani Ghosh, Avijit Saha, N. I. Mou
{"title":"基于PSAT的孟加拉电力系统西部电网潮流仿真及与PowerWorld的性能比较","authors":"Shibani Ghosh, Avijit Saha, N. I. Mou","doi":"10.1109/ISMS.2010.61","DOIUrl":null,"url":null,"abstract":"This paper describes the load flow simulation studies of the Western grid of Bangladesh Power System using PSAT, a free and open-source software and compares the results with those from PowerWorld, a well-accepted and commercial software. The studied power system contains 41 buses and 82 interconnecting lines. To ground the basis of comparison, both of the applications were run in the same simulation environment with identical input data. For this system, an average difference of 1.7525% between the bus voltage magnitudes calculated by the two software packages was found and PowerWorld was 6.4 times faster than PSAT to complete the simulation.","PeriodicalId":434315,"journal":{"name":"2010 International Conference on Intelligent Systems, Modelling and Simulation","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-01-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Load Flow Simulation of Western Grid of Bangladesh Power System Using PSAT and Performance-Based Comparison with PowerWorld\",\"authors\":\"Shibani Ghosh, Avijit Saha, N. I. Mou\",\"doi\":\"10.1109/ISMS.2010.61\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper describes the load flow simulation studies of the Western grid of Bangladesh Power System using PSAT, a free and open-source software and compares the results with those from PowerWorld, a well-accepted and commercial software. The studied power system contains 41 buses and 82 interconnecting lines. To ground the basis of comparison, both of the applications were run in the same simulation environment with identical input data. For this system, an average difference of 1.7525% between the bus voltage magnitudes calculated by the two software packages was found and PowerWorld was 6.4 times faster than PSAT to complete the simulation.\",\"PeriodicalId\":434315,\"journal\":{\"name\":\"2010 International Conference on Intelligent Systems, Modelling and Simulation\",\"volume\":\"28 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-01-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 International Conference on Intelligent Systems, Modelling and Simulation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISMS.2010.61\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 International Conference on Intelligent Systems, Modelling and Simulation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISMS.2010.61","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

本文介绍了利用免费开源软件PSAT对孟加拉电力系统西部电网的负荷潮流进行仿真研究,并将仿真结果与商用软件PowerWorld进行了比较。所研究的电力系统包含41条母线和82条互连线。为了建立比较的基础,两个应用程序都在相同的模拟环境中运行,输入数据相同。对于本系统,两个软件包计算的母线电压幅值平均相差1.7525%,并且PowerWorld完成仿真的速度比PSAT快6.4倍。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Load Flow Simulation of Western Grid of Bangladesh Power System Using PSAT and Performance-Based Comparison with PowerWorld
This paper describes the load flow simulation studies of the Western grid of Bangladesh Power System using PSAT, a free and open-source software and compares the results with those from PowerWorld, a well-accepted and commercial software. The studied power system contains 41 buses and 82 interconnecting lines. To ground the basis of comparison, both of the applications were run in the same simulation environment with identical input data. For this system, an average difference of 1.7525% between the bus voltage magnitudes calculated by the two software packages was found and PowerWorld was 6.4 times faster than PSAT to complete the simulation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信