chi inuru CHP-1的改造过程中安装燃气轮机

Corina Guțu-Chetrușca, A. Guțu
{"title":"chi<s:1> inuru CHP-1的改造过程中安装燃气轮机","authors":"Corina Guțu-Chetrușca, A. Guțu","doi":"10.1109/SIELMEN.2017.8123385","DOIUrl":null,"url":null,"abstract":"Equipped with outdated installations from the nineteen-fifties and nineteen-sixties, Chisinau CHP-1, operates with an electrical efficiency below 20%. However its decommissioning encounters several problems, related to the shortage of power generation in the republic, and to the difficulty of ensuring the thermal load during the summer time. A reasonable solution would be to disassemble the medium pressure boilers and replace them with gas turbine and recovery boilers installations, at the same time keeping the existing steam turbines and electrical equipment. Two gas turbines with 16 … 38 MW capacity and 35 … 40% electrical efficiency can be installed in the boiler's space. Recovery boilers would produce steam for the existing turbines increasing the electrical power by 10 … 14% and the electrical efficiency up to 39 … 45%. The CHP global efficiency could remain at the current share of up to 88%.","PeriodicalId":403279,"journal":{"name":"2017 International Conference on Electromechanical and Power Systems (SIELMEN)","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Chişinău CHP-1 retrofitting by the proces of installing gas turbines\",\"authors\":\"Corina Guțu-Chetrușca, A. Guțu\",\"doi\":\"10.1109/SIELMEN.2017.8123385\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Equipped with outdated installations from the nineteen-fifties and nineteen-sixties, Chisinau CHP-1, operates with an electrical efficiency below 20%. However its decommissioning encounters several problems, related to the shortage of power generation in the republic, and to the difficulty of ensuring the thermal load during the summer time. A reasonable solution would be to disassemble the medium pressure boilers and replace them with gas turbine and recovery boilers installations, at the same time keeping the existing steam turbines and electrical equipment. Two gas turbines with 16 … 38 MW capacity and 35 … 40% electrical efficiency can be installed in the boiler's space. Recovery boilers would produce steam for the existing turbines increasing the electrical power by 10 … 14% and the electrical efficiency up to 39 … 45%. The CHP global efficiency could remain at the current share of up to 88%.\",\"PeriodicalId\":403279,\"journal\":{\"name\":\"2017 International Conference on Electromechanical and Power Systems (SIELMEN)\",\"volume\":\"27 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 International Conference on Electromechanical and Power Systems (SIELMEN)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SIELMEN.2017.8123385\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 International Conference on Electromechanical and Power Systems (SIELMEN)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SIELMEN.2017.8123385","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

基希讷乌CHP-1配备了20世纪50年代和60年代的过时装置,其电力效率低于20%。然而,它的退役遇到了几个问题,与共和国的发电短缺有关,以及难以确保夏季的热负荷。合理的解决办法是将中压锅炉拆卸,换上燃气轮机和回收锅炉装置,同时保留现有的汽轮机和电气设备。锅炉空间可以安装两台容量为16 ~ 38兆瓦、电效率为35 ~ 40%的燃气轮机。回收锅炉将为现有的涡轮机产生蒸汽,增加10…14%的电力,提高39…45%的电力效率。热电联产的全球效率可以保持在目前高达88%的份额。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Chişinău CHP-1 retrofitting by the proces of installing gas turbines
Equipped with outdated installations from the nineteen-fifties and nineteen-sixties, Chisinau CHP-1, operates with an electrical efficiency below 20%. However its decommissioning encounters several problems, related to the shortage of power generation in the republic, and to the difficulty of ensuring the thermal load during the summer time. A reasonable solution would be to disassemble the medium pressure boilers and replace them with gas turbine and recovery boilers installations, at the same time keeping the existing steam turbines and electrical equipment. Two gas turbines with 16 … 38 MW capacity and 35 … 40% electrical efficiency can be installed in the boiler's space. Recovery boilers would produce steam for the existing turbines increasing the electrical power by 10 … 14% and the electrical efficiency up to 39 … 45%. The CHP global efficiency could remain at the current share of up to 88%.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信