{"title":"圣莫尼卡湾污泥回收:进度报告","authors":"B. Thompson, J. Dorsey","doi":"10.1109/OCEANS.1989.586757","DOIUrl":null,"url":null,"abstract":"A multidisciplinary study (Table 1) was designed that included preand post-termination sampling near the outfall and at a reference (control) area (42) (Fig. 1). Pre-termination sampling began in February 1986 and included three sampling periods over 1.5 years. Sampling was conducted quarterly during the first year after termination (1988) as we anticipated rapid recovery. Sampling will continue semi-annually through summer 1990, a five-year study.","PeriodicalId":331017,"journal":{"name":"Proceedings OCEANS","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1989-09-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Recovery Of Santa Monica Bay From Sludge Discharge: Progress Report\",\"authors\":\"B. Thompson, J. Dorsey\",\"doi\":\"10.1109/OCEANS.1989.586757\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A multidisciplinary study (Table 1) was designed that included preand post-termination sampling near the outfall and at a reference (control) area (42) (Fig. 1). Pre-termination sampling began in February 1986 and included three sampling periods over 1.5 years. Sampling was conducted quarterly during the first year after termination (1988) as we anticipated rapid recovery. Sampling will continue semi-annually through summer 1990, a five-year study.\",\"PeriodicalId\":331017,\"journal\":{\"name\":\"Proceedings OCEANS\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1989-09-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings OCEANS\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/OCEANS.1989.586757\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings OCEANS","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/OCEANS.1989.586757","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Recovery Of Santa Monica Bay From Sludge Discharge: Progress Report
A multidisciplinary study (Table 1) was designed that included preand post-termination sampling near the outfall and at a reference (control) area (42) (Fig. 1). Pre-termination sampling began in February 1986 and included three sampling periods over 1.5 years. Sampling was conducted quarterly during the first year after termination (1988) as we anticipated rapid recovery. Sampling will continue semi-annually through summer 1990, a five-year study.