使用vissim软件对无信号交叉口进行性能建模

Sarwanta Sarwanta, Hamdani Abdulgani
{"title":"使用vissim软件对无信号交叉口进行性能建模","authors":"Sarwanta Sarwanta, Hamdani Abdulgani","doi":"10.56444/soshumdik.v1i4.186","DOIUrl":null,"url":null,"abstract":"A level road intersection is a meeting place for vehicle flows from various directions both towards the intersection and leaving the intersection, so that at the intersection there is the potential for vehicle conflicts to occur which are at the same time at the same point. This causes the vehicle to reduce speed. Reducing vehicle speed at intersections results in the potential for queues and delays. Evaluation of the performance of the intersection needs to be done to find out the current performance of the intersection, so that anticipatory steps can be taken so that the performance of the intersection can be maintained and maintained in good condition. In this study, an analysis of intersection performance will be carried out using the Vissim software. In this study, an assessment of the unsignalized intersection of Pasar Butun, Balikpapan City was carried out. The data needed for input into the model include traffic flow data at rush hour or peak density hours, intersection geometry data. The output or results generated by the model are intersection performance information in the form of queue length and delay time parameters  Degree of Saturation (DS) for the existing condition is 1.70 and for the next 5 years it is 2.20. Parameters of queue length and time delay in existing conditions are 33.0 m and 3.65 sec/pcu and for the next 5 years projection are 87 m and delay time is 187.s/pcu","PeriodicalId":339573,"journal":{"name":"Jurnal Riset Sosial Humaniora dan Pendidikan","volume":"64 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-11-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"PERFORMANCE MODELING OF UNSIGNALED INTERSECTIONS USING THE VISSIM SOFTWARE\",\"authors\":\"Sarwanta Sarwanta, Hamdani Abdulgani\",\"doi\":\"10.56444/soshumdik.v1i4.186\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A level road intersection is a meeting place for vehicle flows from various directions both towards the intersection and leaving the intersection, so that at the intersection there is the potential for vehicle conflicts to occur which are at the same time at the same point. This causes the vehicle to reduce speed. Reducing vehicle speed at intersections results in the potential for queues and delays. Evaluation of the performance of the intersection needs to be done to find out the current performance of the intersection, so that anticipatory steps can be taken so that the performance of the intersection can be maintained and maintained in good condition. In this study, an analysis of intersection performance will be carried out using the Vissim software. In this study, an assessment of the unsignalized intersection of Pasar Butun, Balikpapan City was carried out. The data needed for input into the model include traffic flow data at rush hour or peak density hours, intersection geometry data. The output or results generated by the model are intersection performance information in the form of queue length and delay time parameters  Degree of Saturation (DS) for the existing condition is 1.70 and for the next 5 years it is 2.20. Parameters of queue length and time delay in existing conditions are 33.0 m and 3.65 sec/pcu and for the next 5 years projection are 87 m and delay time is 187.s/pcu\",\"PeriodicalId\":339573,\"journal\":{\"name\":\"Jurnal Riset Sosial Humaniora dan Pendidikan\",\"volume\":\"64 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-11-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Riset Sosial Humaniora dan Pendidikan\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.56444/soshumdik.v1i4.186\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Riset Sosial Humaniora dan Pendidikan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.56444/soshumdik.v1i4.186","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

平坦道路交叉口是各个方向车辆流入交叉口和驶离交叉口的交汇处,因此在交叉口存在着同时在同一点发生车辆冲突的可能性。这导致车辆降低速度。在十字路口降低车速可能会导致排队和延误。需要对交叉口的性能进行评估,以了解交叉口目前的性能,以便采取预期的步骤,使交叉口的性能得以保持和保持在良好的状态。在本研究中,将使用Vissim软件对交叉口性能进行分析。在本研究中,对巴力巴板市巴萨尔布敦的无信号交叉口进行了评估。需要输入模型的数据包括高峰时段或高峰密度时段的交通流数据、交叉口几何数据。模型产生的输出或结果是以队列长度和延迟时间参数形式表示的交叉口性能信息,饱和度(DS)在现有条件下为1.70,未来5年为2.20。现有条件下队列长度和延迟参数分别为33.0 m和3.65秒/pcu,未来5年预测为87 m和延迟时间为187.s/pcu
本文章由计算机程序翻译,如有差异,请以英文原文为准。
PERFORMANCE MODELING OF UNSIGNALED INTERSECTIONS USING THE VISSIM SOFTWARE
A level road intersection is a meeting place for vehicle flows from various directions both towards the intersection and leaving the intersection, so that at the intersection there is the potential for vehicle conflicts to occur which are at the same time at the same point. This causes the vehicle to reduce speed. Reducing vehicle speed at intersections results in the potential for queues and delays. Evaluation of the performance of the intersection needs to be done to find out the current performance of the intersection, so that anticipatory steps can be taken so that the performance of the intersection can be maintained and maintained in good condition. In this study, an analysis of intersection performance will be carried out using the Vissim software. In this study, an assessment of the unsignalized intersection of Pasar Butun, Balikpapan City was carried out. The data needed for input into the model include traffic flow data at rush hour or peak density hours, intersection geometry data. The output or results generated by the model are intersection performance information in the form of queue length and delay time parameters  Degree of Saturation (DS) for the existing condition is 1.70 and for the next 5 years it is 2.20. Parameters of queue length and time delay in existing conditions are 33.0 m and 3.65 sec/pcu and for the next 5 years projection are 87 m and delay time is 187.s/pcu
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信