放松管制环境下电力系统输电规划研究

T. Tachikawa, H. Kita, H. Sugihara, K. Nishiya, J. Hasegawa
{"title":"放松管制环境下电力系统输电规划研究","authors":"T. Tachikawa, H. Kita, H. Sugihara, K. Nishiya, J. Hasegawa","doi":"10.1109/DRPT.2000.855742","DOIUrl":null,"url":null,"abstract":"Under a deregulated environment, power system operators such as utilities have to expand and reinforce the transmission network so that all participants can utilize the network equally and fairly. However, it is difficult for the power system operators to forecast how often the network will be utilized or which bus the users will connect to. Therefore, more uncertain factors exist in the transmission planning problem under a deregulated environment. This paper presents a method for evaluating the maximum power which can be injected to a bus and identifying some transmission lines which result in the bottleneck under the uncertain conditions. This paper also investigates a probabilistic load flow to consider the statistic characteristics of load change and line fault occurrence.","PeriodicalId":127287,"journal":{"name":"DRPT2000. International Conference on Electric Utility Deregulation and Restructuring and Power Technologies. Proceedings (Cat. No.00EX382)","volume":"90 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-04-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"25","resultStr":"{\"title\":\"A study of transmission planning under a deregulated environment in power system\",\"authors\":\"T. Tachikawa, H. Kita, H. Sugihara, K. Nishiya, J. Hasegawa\",\"doi\":\"10.1109/DRPT.2000.855742\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Under a deregulated environment, power system operators such as utilities have to expand and reinforce the transmission network so that all participants can utilize the network equally and fairly. However, it is difficult for the power system operators to forecast how often the network will be utilized or which bus the users will connect to. Therefore, more uncertain factors exist in the transmission planning problem under a deregulated environment. This paper presents a method for evaluating the maximum power which can be injected to a bus and identifying some transmission lines which result in the bottleneck under the uncertain conditions. This paper also investigates a probabilistic load flow to consider the statistic characteristics of load change and line fault occurrence.\",\"PeriodicalId\":127287,\"journal\":{\"name\":\"DRPT2000. International Conference on Electric Utility Deregulation and Restructuring and Power Technologies. Proceedings (Cat. No.00EX382)\",\"volume\":\"90 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2000-04-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"25\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"DRPT2000. International Conference on Electric Utility Deregulation and Restructuring and Power Technologies. Proceedings (Cat. No.00EX382)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/DRPT.2000.855742\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"DRPT2000. International Conference on Electric Utility Deregulation and Restructuring and Power Technologies. Proceedings (Cat. No.00EX382)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/DRPT.2000.855742","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 25

摘要

在放松管制的环境下,电力公司等电力系统运营商必须扩大和加强输电网络,使所有参与者都能平等、公平地利用网络。然而,对于电力系统运营商来说,很难预测网络的使用频率或用户将连接到哪条总线。因此,在管制放松的环境下,输电规划问题存在更多的不确定因素。本文提出了一种在不确定条件下,评估母线可注入的最大功率和识别造成瓶颈的传输线的方法。本文还研究了考虑负荷变化和线路故障发生的统计特性的概率潮流。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A study of transmission planning under a deregulated environment in power system
Under a deregulated environment, power system operators such as utilities have to expand and reinforce the transmission network so that all participants can utilize the network equally and fairly. However, it is difficult for the power system operators to forecast how often the network will be utilized or which bus the users will connect to. Therefore, more uncertain factors exist in the transmission planning problem under a deregulated environment. This paper presents a method for evaluating the maximum power which can be injected to a bus and identifying some transmission lines which result in the bottleneck under the uncertain conditions. This paper also investigates a probabilistic load flow to consider the statistic characteristics of load change and line fault occurrence.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信