it项目:成熟度x性能

R. Moraes, Isak Kruglianskas
{"title":"it项目:成熟度x性能","authors":"R. Moraes, Isak Kruglianskas","doi":"10.5585/RAI.V7I2.346","DOIUrl":null,"url":null,"abstract":"This article presents a survey done on 130 projects in the IT area that evaluated the relationship between the degree of maturity in project management of the performing organization and the project’s performance. The maturity was evaluated by the degree of formalization procedures of project management described in the PMBOK, and the performance of the projects was evaluated by Shenhar’s definition (2001). It was possible to verify that the processes of project management do not have the same relationship as to the performance project.","PeriodicalId":183885,"journal":{"name":"RAI: Revista de Administração e Inovação","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-08-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Projetos de TI: maturidade x desempenho\",\"authors\":\"R. Moraes, Isak Kruglianskas\",\"doi\":\"10.5585/RAI.V7I2.346\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This article presents a survey done on 130 projects in the IT area that evaluated the relationship between the degree of maturity in project management of the performing organization and the project’s performance. The maturity was evaluated by the degree of formalization procedures of project management described in the PMBOK, and the performance of the projects was evaluated by Shenhar’s definition (2001). It was possible to verify that the processes of project management do not have the same relationship as to the performance project.\",\"PeriodicalId\":183885,\"journal\":{\"name\":\"RAI: Revista de Administração e Inovação\",\"volume\":\"27 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-08-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"RAI: Revista de Administração e Inovação\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5585/RAI.V7I2.346\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"RAI: Revista de Administração e Inovação","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5585/RAI.V7I2.346","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

本文对IT领域的130个项目进行了调查,评估了执行组织的项目管理成熟度与项目绩效之间的关系。成熟度是通过项目管理知识体系中描述的项目管理程序的正规化程度来评估的,项目的绩效是通过Shenhar(2001)的定义来评估的。可以证实,项目管理过程与绩效项目之间的关系并不相同。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Projetos de TI: maturidade x desempenho
This article presents a survey done on 130 projects in the IT area that evaluated the relationship between the degree of maturity in project management of the performing organization and the project’s performance. The maturity was evaluated by the degree of formalization procedures of project management described in the PMBOK, and the performance of the projects was evaluated by Shenhar’s definition (2001). It was possible to verify that the processes of project management do not have the same relationship as to the performance project.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信