{"title":"MV船舶卸载活动的延迟分析。Kartini Baruna","authors":"Y. Komalasari","doi":"10.54249/iwj.v4i1.63","DOIUrl":null,"url":null,"abstract":"Tanjung Jati, Jepara PLTU Port is a steam power plant port that distributes electrical energy on the islands of Java and Bali. In its activities, the Tanjung Jati,Jepara PLTU Port unloads coal to produce electrical energy. In carrying out the unloading of cargo in MV. Kartini Baruna often occurs delays that are detrimental to shipping companies and power plants. From the results obtained from this study is the occurrence of delays in loading and unloading activities due to unloading equipment, unsuitable loading procedures, and due to weather. This is due to the lack of care and maintenance on loading and unloading equipment and errors in loading and unloading procedures on ships.In order to increase the productivity of the work for the PLTU Tanjung Jati Port in improving the smoothness of loading and unloading activities, it is recommended to provide training and skills for operators in order to facilitate coal loading and unloading activities and increase competence regarding the mechanism of unloading equipment.","PeriodicalId":252040,"journal":{"name":"IWJ : Inland Waterways Journal","volume":"47 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Delay Analysis Of Unloading Activities On The Ship MV. Kartini Baruna\",\"authors\":\"Y. Komalasari\",\"doi\":\"10.54249/iwj.v4i1.63\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Tanjung Jati, Jepara PLTU Port is a steam power plant port that distributes electrical energy on the islands of Java and Bali. In its activities, the Tanjung Jati,Jepara PLTU Port unloads coal to produce electrical energy. In carrying out the unloading of cargo in MV. Kartini Baruna often occurs delays that are detrimental to shipping companies and power plants. From the results obtained from this study is the occurrence of delays in loading and unloading activities due to unloading equipment, unsuitable loading procedures, and due to weather. This is due to the lack of care and maintenance on loading and unloading equipment and errors in loading and unloading procedures on ships.In order to increase the productivity of the work for the PLTU Tanjung Jati Port in improving the smoothness of loading and unloading activities, it is recommended to provide training and skills for operators in order to facilitate coal loading and unloading activities and increase competence regarding the mechanism of unloading equipment.\",\"PeriodicalId\":252040,\"journal\":{\"name\":\"IWJ : Inland Waterways Journal\",\"volume\":\"47 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IWJ : Inland Waterways Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.54249/iwj.v4i1.63\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IWJ : Inland Waterways Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54249/iwj.v4i1.63","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
Tanjung Jati, Jepara PLTU港口是一个蒸汽发电厂港口,在爪哇岛和巴厘岛分配电力。在其活动中,Tanjung Jati,Jepara PLTU港口卸载煤炭以生产电能。在执行货物的卸货MV。Kartini Baruna经常发生延误,这对航运公司和发电厂来说是有害的。从本研究得出的结果来看,由于卸载设备、装载程序不合适以及天气原因,装卸活动出现延误。这是由于装卸设备缺乏保养和维护以及船上装卸程序错误造成的。为了提高PLTU丹戎加提港的工作效率,提高装卸活动的平稳性,建议对操作人员进行培训和技能培训,以方便煤炭装卸活动,并提高卸货设备机制的能力。
Delay Analysis Of Unloading Activities On The Ship MV. Kartini Baruna
Tanjung Jati, Jepara PLTU Port is a steam power plant port that distributes electrical energy on the islands of Java and Bali. In its activities, the Tanjung Jati,Jepara PLTU Port unloads coal to produce electrical energy. In carrying out the unloading of cargo in MV. Kartini Baruna often occurs delays that are detrimental to shipping companies and power plants. From the results obtained from this study is the occurrence of delays in loading and unloading activities due to unloading equipment, unsuitable loading procedures, and due to weather. This is due to the lack of care and maintenance on loading and unloading equipment and errors in loading and unloading procedures on ships.In order to increase the productivity of the work for the PLTU Tanjung Jati Port in improving the smoothness of loading and unloading activities, it is recommended to provide training and skills for operators in order to facilitate coal loading and unloading activities and increase competence regarding the mechanism of unloading equipment.