优化伊拉克卡尔巴拉沥青混凝土厂的位置和规模

Ghayath Ali, S. Mohammad, Alaa Abdulhussein
{"title":"优化伊拉克卡尔巴拉沥青混凝土厂的位置和规模","authors":"Ghayath Ali, S. Mohammad, Alaa Abdulhussein","doi":"10.55810/2312-5721.1017","DOIUrl":null,"url":null,"abstract":"This study develops and presents a methodology for determining the optimal geographic distribution and size of asphalt concrete plants in Karbala, Iraq, in order to minimize the cost of asphalt concrete produced. The purpose of this study is to discuss these points. The methodology can identify potential locations for asphalt concrete plants within a study area, considering the plants ' operation and capital costs and the costs of transporting raw materials to the plants and asphalt concrete to demand centers. Matrix Laboratory (MATLAB) software have been used to program the methodology. Thismethodology has been applied to Karbala using actual data. The methodology ' s output identi fi es the optimal locations and sizes of asphalt concrete plants in Karbala. There are two optimal locations for asphalt concrete plants B and D; their total size is 80 tons per hour and 800 tons per hour, respectively. This is adequate to supply Karbala ' s asphalt concrete demand to 2032. The methodology effectively determines the optimal geographic locations and sizes of asphalt concrete plants in the study area.","PeriodicalId":218143,"journal":{"name":"Al-Bahir Journal for Engineering and Pure Sciences","volume":"42 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-03-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Optimizing Locations and Sizes of Asphalt Concrete Plants in Karbala, Iraq\",\"authors\":\"Ghayath Ali, S. Mohammad, Alaa Abdulhussein\",\"doi\":\"10.55810/2312-5721.1017\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study develops and presents a methodology for determining the optimal geographic distribution and size of asphalt concrete plants in Karbala, Iraq, in order to minimize the cost of asphalt concrete produced. The purpose of this study is to discuss these points. The methodology can identify potential locations for asphalt concrete plants within a study area, considering the plants ' operation and capital costs and the costs of transporting raw materials to the plants and asphalt concrete to demand centers. Matrix Laboratory (MATLAB) software have been used to program the methodology. Thismethodology has been applied to Karbala using actual data. The methodology ' s output identi fi es the optimal locations and sizes of asphalt concrete plants in Karbala. There are two optimal locations for asphalt concrete plants B and D; their total size is 80 tons per hour and 800 tons per hour, respectively. This is adequate to supply Karbala ' s asphalt concrete demand to 2032. The methodology effectively determines the optimal geographic locations and sizes of asphalt concrete plants in the study area.\",\"PeriodicalId\":218143,\"journal\":{\"name\":\"Al-Bahir Journal for Engineering and Pure Sciences\",\"volume\":\"42 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-03-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Al-Bahir Journal for Engineering and Pure Sciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.55810/2312-5721.1017\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Al-Bahir Journal for Engineering and Pure Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55810/2312-5721.1017","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究开发并提出了一种方法,用于确定伊拉克卡尔巴拉沥青混凝土工厂的最佳地理分布和规模,以最大限度地降低沥青混凝土的生产成本。本研究的目的就是讨论这些问题。该方法可以在研究区域内确定沥青混凝土工厂的潜在位置,考虑到工厂的运营和资本成本以及将原材料运输到工厂和将沥青混凝土运输到需求中心的成本。采用矩阵实验室(MATLAB)软件对方法进行了编程。该方法已应用于卡尔巴拉使用实际数据。该方法的输出确定了卡尔巴拉沥青混凝土厂的最佳位置和规模。沥青混凝土厂B和D有两个最优位置;它们的总尺寸分别是每小时80吨和800吨。这足以满足卡尔巴拉到2032年的沥青混凝土需求。该方法有效地确定了研究区域内沥青混凝土厂的最佳地理位置和规模。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Optimizing Locations and Sizes of Asphalt Concrete Plants in Karbala, Iraq
This study develops and presents a methodology for determining the optimal geographic distribution and size of asphalt concrete plants in Karbala, Iraq, in order to minimize the cost of asphalt concrete produced. The purpose of this study is to discuss these points. The methodology can identify potential locations for asphalt concrete plants within a study area, considering the plants ' operation and capital costs and the costs of transporting raw materials to the plants and asphalt concrete to demand centers. Matrix Laboratory (MATLAB) software have been used to program the methodology. Thismethodology has been applied to Karbala using actual data. The methodology ' s output identi fi es the optimal locations and sizes of asphalt concrete plants in Karbala. There are two optimal locations for asphalt concrete plants B and D; their total size is 80 tons per hour and 800 tons per hour, respectively. This is adequate to supply Karbala ' s asphalt concrete demand to 2032. The methodology effectively determines the optimal geographic locations and sizes of asphalt concrete plants in the study area.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信