评估成本表现和执行捕虾项目的时间

Jeane Verni Mandagi, Sartika Nisumanti, Norma Puspita
{"title":"评估成本表现和执行捕虾项目的时间","authors":"Jeane Verni Mandagi, Sartika Nisumanti, Norma Puspita","doi":"10.36982/jtg.v11i2.3051","DOIUrl":null,"url":null,"abstract":"ABSTRACT  A construction project is a series of jobs where every aspect of the work in it affects each other. Other than planning, cost and time control are part of the overall construction project management. In addition to the assessment in terms of quality, the presentation of a project can also be assessed in terms of cost and time. In the implementation of construction project work, the possibility of delays is large enough so that the schedule for the realization of project implementation often deviates between the plan and realization as stated in the work contract on the Bracing Work Project for Reinforcement of Piles of Betung Ship Toll Project Package I Section IA STA 332+250 – STA 332+600. In this study, Performance Analysis Against Time and Cost with the Earned Value Analysis Method on the Bracing Pile Reinforcement Project for the KAPB Toll Project, the results of time performance in month 1 from the aspect of the schedule experienced delays indicated by the Schedule Variant (SV) was negative. until the last 15th month Rp -4,543,585,000,24. As well as the performance of the cost of implementing this project, the cost is greater than the planned cost, this is indicated by the negative Cost Variance (CV) indicator of Rp -805,675,000.  Keywords: Time, Cost, and the concept of the value of the results (Earned Value concept).                                                                             ABSTRAK  Proyek konstruksi merupakan suatu rangkaian pekerjaan dimana setiap aspek pekerjaan di dalamnya saling mempengaruhi. Seperti perencanaan, pengendalian biaya dan waktu merupakan bagian dari manajemen proyek konstruksi secara keseluruhan. Selain penilaian dari segi kualitas, presentasi suatu proyek dapat juga dinilai dari segi biaya dan waktu. Dalam pelaksanaan pekerjaan proyek konstruksi kemungkinan terjadinya keterlambatan cukup besar sehingga jadwal realisasi pelaksanaan proyek sering terjadi deviasi antara rencana   dan realisasi yang tertuang dalam kontrak kerja pada Proyek Pekerjaan Bracing Perkuatan Tiang Pancang Proyek Tol KAPB Paket I Seksi IA STA 332+250 – STA 332+600. Dalam penelitian ini analisa kinerja terhadap waktu dan biaya dengan Metode Earned Value Analysis pada Proyek Pekerjaan Bracing Perkuatan Tiang Pancang Proyek Tol Kapal Betung ini di dapat hasil kinerja waktu pada bulan ke 1 dari aspek jadwal   mengalami keterlambatan yang ditunjukan oleh Varian Jadwal (SV) bernilai negative sampai bulan terakhir ke 15 Rp -4.543.585.000,24. Serta kinerja biaya pelaksanaan proyek ini mengeluarkan lebih besar dari biaya rencana, hal ini ditunjukan dari indikator Varian Biaya (CV) bernilai negatif sebesar Rp -805.675.000. Kata kunci: Waktu, Biaya, dan konsep nilai hasil (Earned Value concept)","PeriodicalId":190616,"journal":{"name":"Jurnal Tekno Global","volume":"141 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Evaluasi Kinerja Biaya Dan Waktu Pada Pelaksanaan Pekerjaan Bracing Perkuatan Tiang Pancang Proyek Tol Kapal Betung Paket I Seksi IA\",\"authors\":\"Jeane Verni Mandagi, Sartika Nisumanti, Norma Puspita\",\"doi\":\"10.36982/jtg.v11i2.3051\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT  A construction project is a series of jobs where every aspect of the work in it affects each other. Other than planning, cost and time control are part of the overall construction project management. In addition to the assessment in terms of quality, the presentation of a project can also be assessed in terms of cost and time. In the implementation of construction project work, the possibility of delays is large enough so that the schedule for the realization of project implementation often deviates between the plan and realization as stated in the work contract on the Bracing Work Project for Reinforcement of Piles of Betung Ship Toll Project Package I Section IA STA 332+250 – STA 332+600. In this study, Performance Analysis Against Time and Cost with the Earned Value Analysis Method on the Bracing Pile Reinforcement Project for the KAPB Toll Project, the results of time performance in month 1 from the aspect of the schedule experienced delays indicated by the Schedule Variant (SV) was negative. until the last 15th month Rp -4,543,585,000,24. As well as the performance of the cost of implementing this project, the cost is greater than the planned cost, this is indicated by the negative Cost Variance (CV) indicator of Rp -805,675,000.  Keywords: Time, Cost, and the concept of the value of the results (Earned Value concept).                                                                             ABSTRAK  Proyek konstruksi merupakan suatu rangkaian pekerjaan dimana setiap aspek pekerjaan di dalamnya saling mempengaruhi. Seperti perencanaan, pengendalian biaya dan waktu merupakan bagian dari manajemen proyek konstruksi secara keseluruhan. Selain penilaian dari segi kualitas, presentasi suatu proyek dapat juga dinilai dari segi biaya dan waktu. Dalam pelaksanaan pekerjaan proyek konstruksi kemungkinan terjadinya keterlambatan cukup besar sehingga jadwal realisasi pelaksanaan proyek sering terjadi deviasi antara rencana   dan realisasi yang tertuang dalam kontrak kerja pada Proyek Pekerjaan Bracing Perkuatan Tiang Pancang Proyek Tol KAPB Paket I Seksi IA STA 332+250 – STA 332+600. Dalam penelitian ini analisa kinerja terhadap waktu dan biaya dengan Metode Earned Value Analysis pada Proyek Pekerjaan Bracing Perkuatan Tiang Pancang Proyek Tol Kapal Betung ini di dapat hasil kinerja waktu pada bulan ke 1 dari aspek jadwal   mengalami keterlambatan yang ditunjukan oleh Varian Jadwal (SV) bernilai negative sampai bulan terakhir ke 15 Rp -4.543.585.000,24. Serta kinerja biaya pelaksanaan proyek ini mengeluarkan lebih besar dari biaya rencana, hal ini ditunjukan dari indikator Varian Biaya (CV) bernilai negatif sebesar Rp -805.675.000. Kata kunci: Waktu, Biaya, dan konsep nilai hasil (Earned Value concept)\",\"PeriodicalId\":190616,\"journal\":{\"name\":\"Jurnal Tekno Global\",\"volume\":\"141 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-12-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Tekno Global\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.36982/jtg.v11i2.3051\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Tekno Global","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36982/jtg.v11i2.3051","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

建设项目是由一系列的工作组成的,其中的各个方面都是相互影响的。除了计划之外,成本和时间控制也是整个建设项目管理的一部分。除了质量方面的评估,项目的展示也可以从成本和时间方面进行评估。在建设项目工作的实施过程中,由于出现延误的可能性较大,导致项目实施的进度往往偏离《间船收货站工程第I包a Section STA 332+250 - STA 332+600支撑加固工程工程合同》中规定的计划与实现进度。本研究采用挣值分析法对KAPB收费站支护桩加固工程进行了基于时间和成本的绩效分析,从进度经历延迟的角度来看,第1个月的时间绩效结果由进度变量(SV)表示为负。直到最后15个月,4,543,585,000卢比。以及执行本项目的成本表现,成本大于计划成本,这由Rp -805,675,000的负成本方差(CV)指标表示。关键词:时间、成本和价值的概念(挣值概念的结果 ).                                                                             【摘要】Proyek konstruksi merupakan suatu rangkaian pekerjaan dimana seap, pekerjaan, dalamnya, salpenaruhi。我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说。Selain penaiaidari segi kualitas,现为suatu proyek dapa juga dinilai dari segi biaya danwaktu。Dalam pelaksanaan pekerjaan proyek konstruksi kemungkinan terjadinya keterlambatan cuup besar sehinga jadwal realisi pelaksanaan proyek服务terjadi deviasi antara rencanan realisy yang tertuang Dalam kontrak kerjak pekerjaan支撑Perkuatan tipanang proyek Tol KAPB Paket I Seksi IA STA 332+250 - STA 332+600。Dalam penelitian ini analisa kinerja terhadap waktu dan biakaya dengan方法挣值分析pada Proyek Pekerjaan支撑Perkuatan Tiang panang Proyek Tol Kapal Betung ini di dapat hasil kinerja waktu pada bulan ke 1 dari aspe jadwal mengalami keterlambatan yang ditunjukan oleh Varian jadwal (SV) berilai负sampai bulan terakhir ke 15 Rp -4.543.585.000,24。Serta kinerja biaya pelaksanaan proyek ini mengeluarkan lebih besar dari biaya rencana, hal ini ditunjukan dari指标Varian biaya (CV) berilai阴性sebesar Rp -805.675.000。Kata kunci: Waktu, Biaya, dan konsep nilai hasil(挣值概念)
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Evaluasi Kinerja Biaya Dan Waktu Pada Pelaksanaan Pekerjaan Bracing Perkuatan Tiang Pancang Proyek Tol Kapal Betung Paket I Seksi IA
ABSTRACT  A construction project is a series of jobs where every aspect of the work in it affects each other. Other than planning, cost and time control are part of the overall construction project management. In addition to the assessment in terms of quality, the presentation of a project can also be assessed in terms of cost and time. In the implementation of construction project work, the possibility of delays is large enough so that the schedule for the realization of project implementation often deviates between the plan and realization as stated in the work contract on the Bracing Work Project for Reinforcement of Piles of Betung Ship Toll Project Package I Section IA STA 332+250 – STA 332+600. In this study, Performance Analysis Against Time and Cost with the Earned Value Analysis Method on the Bracing Pile Reinforcement Project for the KAPB Toll Project, the results of time performance in month 1 from the aspect of the schedule experienced delays indicated by the Schedule Variant (SV) was negative. until the last 15th month Rp -4,543,585,000,24. As well as the performance of the cost of implementing this project, the cost is greater than the planned cost, this is indicated by the negative Cost Variance (CV) indicator of Rp -805,675,000.  Keywords: Time, Cost, and the concept of the value of the results (Earned Value concept).                                                                             ABSTRAK  Proyek konstruksi merupakan suatu rangkaian pekerjaan dimana setiap aspek pekerjaan di dalamnya saling mempengaruhi. Seperti perencanaan, pengendalian biaya dan waktu merupakan bagian dari manajemen proyek konstruksi secara keseluruhan. Selain penilaian dari segi kualitas, presentasi suatu proyek dapat juga dinilai dari segi biaya dan waktu. Dalam pelaksanaan pekerjaan proyek konstruksi kemungkinan terjadinya keterlambatan cukup besar sehingga jadwal realisasi pelaksanaan proyek sering terjadi deviasi antara rencana   dan realisasi yang tertuang dalam kontrak kerja pada Proyek Pekerjaan Bracing Perkuatan Tiang Pancang Proyek Tol KAPB Paket I Seksi IA STA 332+250 – STA 332+600. Dalam penelitian ini analisa kinerja terhadap waktu dan biaya dengan Metode Earned Value Analysis pada Proyek Pekerjaan Bracing Perkuatan Tiang Pancang Proyek Tol Kapal Betung ini di dapat hasil kinerja waktu pada bulan ke 1 dari aspek jadwal   mengalami keterlambatan yang ditunjukan oleh Varian Jadwal (SV) bernilai negative sampai bulan terakhir ke 15 Rp -4.543.585.000,24. Serta kinerja biaya pelaksanaan proyek ini mengeluarkan lebih besar dari biaya rencana, hal ini ditunjukan dari indikator Varian Biaya (CV) bernilai negatif sebesar Rp -805.675.000. Kata kunci: Waktu, Biaya, dan konsep nilai hasil (Earned Value concept)
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信