{"title":"调整scrum工作量和时间估算中的故事点计算","authors":"Hind Zahraoui, M. Idrissi","doi":"10.1109/SITA.2015.7358400","DOIUrl":null,"url":null,"abstract":"Effort and time estimation at the initial stage of an agile project is a difficult and challenging task due to volatility and changing in customer requirements. Scrum remains the most used agile project management method. However effort estimation in scrum is mainly based on story points which are subjective measures and mostly lead to inaccurate estimates. In this paper we propose to adjust this measure using three adjustment factors. Moreover this paper will show how to use also this adjusted story point in velocity calculation to ameliorate scrum time estimation.","PeriodicalId":174405,"journal":{"name":"2015 10th International Conference on Intelligent Systems: Theories and Applications (SITA)","volume":"449 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"34","resultStr":"{\"title\":\"Adjusting story points calculation in scrum effort & time estimation\",\"authors\":\"Hind Zahraoui, M. Idrissi\",\"doi\":\"10.1109/SITA.2015.7358400\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Effort and time estimation at the initial stage of an agile project is a difficult and challenging task due to volatility and changing in customer requirements. Scrum remains the most used agile project management method. However effort estimation in scrum is mainly based on story points which are subjective measures and mostly lead to inaccurate estimates. In this paper we propose to adjust this measure using three adjustment factors. Moreover this paper will show how to use also this adjusted story point in velocity calculation to ameliorate scrum time estimation.\",\"PeriodicalId\":174405,\"journal\":{\"name\":\"2015 10th International Conference on Intelligent Systems: Theories and Applications (SITA)\",\"volume\":\"449 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"34\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 10th International Conference on Intelligent Systems: Theories and Applications (SITA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SITA.2015.7358400\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 10th International Conference on Intelligent Systems: Theories and Applications (SITA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SITA.2015.7358400","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Adjusting story points calculation in scrum effort & time estimation
Effort and time estimation at the initial stage of an agile project is a difficult and challenging task due to volatility and changing in customer requirements. Scrum remains the most used agile project management method. However effort estimation in scrum is mainly based on story points which are subjective measures and mostly lead to inaccurate estimates. In this paper we propose to adjust this measure using three adjustment factors. Moreover this paper will show how to use also this adjusted story point in velocity calculation to ameliorate scrum time estimation.