{"title":"在泗水环岛和莫尔约萨里环岛上的性能和交通管理分析","authors":"Laif Satoinong, Mardijono Mardijono, Shofwan Donny, Norman Ray, Leonardus Setia Budi","doi":"10.25139/JPRS.V2I1.1483","DOIUrl":null,"url":null,"abstract":"The aim of this thesis is solving the problem of jamming it happen at ITS roundabout and Mulyosari. In research and management of data, and theory which use is MKJI of 1997. The solving of this thesis needed as traffic light data on existing situation. Then, there are survey data at ITC roundabout and Mulyosari roundabout on 2018. The function of this survey is to know about the real condition performance both of Circles. Finally, both of circles are not effective (Jamming traffic light). Forward, predictions of performance traffic light in 5 years later until 2022 from 2018, finally more not effective. In this thesis gives the solution in case should use the traffic light. Finally, the solution as counting, that both of roundabout about traffic light become effective.","PeriodicalId":111362,"journal":{"name":"Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil","volume":"12 4","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-03-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Analisis Kinerja Dan Manajemen Lalu Lintas pada Bundaran ITS dan Bundaran Mulyosari Kota Surabaya\",\"authors\":\"Laif Satoinong, Mardijono Mardijono, Shofwan Donny, Norman Ray, Leonardus Setia Budi\",\"doi\":\"10.25139/JPRS.V2I1.1483\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The aim of this thesis is solving the problem of jamming it happen at ITS roundabout and Mulyosari. In research and management of data, and theory which use is MKJI of 1997. The solving of this thesis needed as traffic light data on existing situation. Then, there are survey data at ITC roundabout and Mulyosari roundabout on 2018. The function of this survey is to know about the real condition performance both of Circles. Finally, both of circles are not effective (Jamming traffic light). Forward, predictions of performance traffic light in 5 years later until 2022 from 2018, finally more not effective. In this thesis gives the solution in case should use the traffic light. Finally, the solution as counting, that both of roundabout about traffic light become effective.\",\"PeriodicalId\":111362,\"journal\":{\"name\":\"Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil\",\"volume\":\"12 4\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-03-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.25139/JPRS.V2I1.1483\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25139/JPRS.V2I1.1483","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Analisis Kinerja Dan Manajemen Lalu Lintas pada Bundaran ITS dan Bundaran Mulyosari Kota Surabaya
The aim of this thesis is solving the problem of jamming it happen at ITS roundabout and Mulyosari. In research and management of data, and theory which use is MKJI of 1997. The solving of this thesis needed as traffic light data on existing situation. Then, there are survey data at ITC roundabout and Mulyosari roundabout on 2018. The function of this survey is to know about the real condition performance both of Circles. Finally, both of circles are not effective (Jamming traffic light). Forward, predictions of performance traffic light in 5 years later until 2022 from 2018, finally more not effective. In this thesis gives the solution in case should use the traffic light. Finally, the solution as counting, that both of roundabout about traffic light become effective.