高阻抗故障数据采集的分段故障测试

M. Carpenter, R. Hoad, T. Bruton, R. Das, S. Kunsman, J. M. Peterson
{"title":"高阻抗故障数据采集的分段故障测试","authors":"M. Carpenter, R. Hoad, T. Bruton, R. Das, S. Kunsman, J. M. Peterson","doi":"10.1109/CPRE.2005.1430417","DOIUrl":null,"url":null,"abstract":"Faulted lines must be repaired and returned to service in the shortest possible time to provide reliable service to the customers. Fault detection is an important aspect of system protection, as it involves personnel as well as equipment safety. The research on high impedance fault (HTF) detection techniques is mainly based on conventional methods, familiar to the power system engineers. TXU Electric Delivery (TXUED) and ABB have initiated a project to collect HIF data from staged-fault testing, to assist ABB in the research and development of suitable techniques for detecting high impedance faults. Since most protective relay engineers have spent their careers avoiding faults on the electric system, they are not usually comfortable with the process of staging faults on a system in service. The purpose of this paper is to describe one method of staging faults that is both safe for utility personnel performing the tests and results in no interruption or break in service to the utility consumers connected to the distribution feeder. Also, the analysis of the resulting HIF test data is discussed. These staged fault tests occurred on January 27-29, 2004 and also on September 27-28, 2004 on a distribution feeder at the TXU Huntington Substation near Lufkin, Texas.","PeriodicalId":395312,"journal":{"name":"58th Annual Conference for Protective Relay Engineers, 2005.","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-04-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"25","resultStr":"{\"title\":\"Staged-fault testing for high impedance fault data collection\",\"authors\":\"M. Carpenter, R. Hoad, T. Bruton, R. Das, S. Kunsman, J. M. Peterson\",\"doi\":\"10.1109/CPRE.2005.1430417\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Faulted lines must be repaired and returned to service in the shortest possible time to provide reliable service to the customers. Fault detection is an important aspect of system protection, as it involves personnel as well as equipment safety. The research on high impedance fault (HTF) detection techniques is mainly based on conventional methods, familiar to the power system engineers. TXU Electric Delivery (TXUED) and ABB have initiated a project to collect HIF data from staged-fault testing, to assist ABB in the research and development of suitable techniques for detecting high impedance faults. Since most protective relay engineers have spent their careers avoiding faults on the electric system, they are not usually comfortable with the process of staging faults on a system in service. The purpose of this paper is to describe one method of staging faults that is both safe for utility personnel performing the tests and results in no interruption or break in service to the utility consumers connected to the distribution feeder. Also, the analysis of the resulting HIF test data is discussed. These staged fault tests occurred on January 27-29, 2004 and also on September 27-28, 2004 on a distribution feeder at the TXU Huntington Substation near Lufkin, Texas.\",\"PeriodicalId\":395312,\"journal\":{\"name\":\"58th Annual Conference for Protective Relay Engineers, 2005.\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2005-04-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"25\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"58th Annual Conference for Protective Relay Engineers, 2005.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CPRE.2005.1430417\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"58th Annual Conference for Protective Relay Engineers, 2005.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CPRE.2005.1430417","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 25

摘要

故障线路必须在尽可能短的时间内修复并恢复使用,为用户提供可靠的服务。故障检测是系统保护的一个重要方面,因为它涉及到人员和设备的安全。高阻抗故障检测技术的研究主要基于常规方法,为电力系统工程师所熟悉。TXU Electric Delivery (TXUED)和ABB启动了一个项目,从分阶段故障测试中收集HIF数据,以帮助ABB研究和开发检测高阻抗故障的合适技术。由于大多数保护继电器工程师的职业生涯都是为了避免电力系统出现故障,因此他们通常对在役系统中出现故障的过程感到不舒服。本文的目的是描述一种分级故障的方法,这种方法既对进行测试的公用事业人员安全,又不会中断或中断与配电馈线相连的公用事业用户的服务。最后,对HIF试验数据进行了分析。2004年1月27日至29日和2004年9月27日至28日,在德克萨斯州卢夫金附近的TXU亨廷顿变电站的配电馈线上进行了分阶段故障测试。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Staged-fault testing for high impedance fault data collection
Faulted lines must be repaired and returned to service in the shortest possible time to provide reliable service to the customers. Fault detection is an important aspect of system protection, as it involves personnel as well as equipment safety. The research on high impedance fault (HTF) detection techniques is mainly based on conventional methods, familiar to the power system engineers. TXU Electric Delivery (TXUED) and ABB have initiated a project to collect HIF data from staged-fault testing, to assist ABB in the research and development of suitable techniques for detecting high impedance faults. Since most protective relay engineers have spent their careers avoiding faults on the electric system, they are not usually comfortable with the process of staging faults on a system in service. The purpose of this paper is to describe one method of staging faults that is both safe for utility personnel performing the tests and results in no interruption or break in service to the utility consumers connected to the distribution feeder. Also, the analysis of the resulting HIF test data is discussed. These staged fault tests occurred on January 27-29, 2004 and also on September 27-28, 2004 on a distribution feeder at the TXU Huntington Substation near Lufkin, Texas.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信