PEP-II b工厂的现状和未来计划

Y. Cai, J. Clendenin, F. Decker, M. Donald, S. Ecklund, R. Erickson, A. Fisher, S. Heifets, R. Holtzapple, R. Iverson, P. Krejcik, A. Kulikov, J. Nelson, A. Novokhatski, I. Reichel, J. Seeman, M. Stanek, M. Sullivan, J. Turner, U. Wienands, C. Steier, M. Zisman, M. Biagini, W. Kozanecki
{"title":"PEP-II b工厂的现状和未来计划","authors":"Y. Cai, J. Clendenin, F. Decker, M. Donald, S. Ecklund, R. Erickson, A. Fisher, S. Heifets, R. Holtzapple, R. Iverson, P. Krejcik, A. Kulikov, J. Nelson, A. Novokhatski, I. Reichel, J. Seeman, M. Stanek, M. Sullivan, J. Turner, U. Wienands, C. Steier, M. Zisman, M. Biagini, W. Kozanecki","doi":"10.1109/PAC.2001.988178","DOIUrl":null,"url":null,"abstract":"The PEP-II e/sup +/e/sup -/ collider has been operating for two years with the BaBar detector at the energy of the Upsilon 4S resonance. The peak luminosity has reached 3.3 /spl times/ 10/sup 33//cm/sup 2//s with 693 bunches with a positron current of 1.5 A and an electron current of 0.8 A. PEP-II has delivered in excess of 38 fb/sup -1/ of data to BaBar. The beam-beam tune shift limits are approaching 0.05-0.07 horizontally and 0.03-0.05 vertically. The electron cloud instability enlarges the positron beam size at high currents but is reduced by a solenoidal field on the vacuum chambers. The beam currents in PEP-II are being raised to increase the number of bunches and the luminosity. Over the next few years the luminosity goal for PEP-II is 10/sup 34//cm/sup 2//s.","PeriodicalId":313758,"journal":{"name":"PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268)","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2001-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Status and future plans of the PEP-II B-factory\",\"authors\":\"Y. Cai, J. Clendenin, F. Decker, M. Donald, S. Ecklund, R. Erickson, A. Fisher, S. Heifets, R. Holtzapple, R. Iverson, P. Krejcik, A. Kulikov, J. Nelson, A. Novokhatski, I. Reichel, J. Seeman, M. Stanek, M. Sullivan, J. Turner, U. Wienands, C. Steier, M. Zisman, M. Biagini, W. Kozanecki\",\"doi\":\"10.1109/PAC.2001.988178\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The PEP-II e/sup +/e/sup -/ collider has been operating for two years with the BaBar detector at the energy of the Upsilon 4S resonance. The peak luminosity has reached 3.3 /spl times/ 10/sup 33//cm/sup 2//s with 693 bunches with a positron current of 1.5 A and an electron current of 0.8 A. PEP-II has delivered in excess of 38 fb/sup -1/ of data to BaBar. The beam-beam tune shift limits are approaching 0.05-0.07 horizontally and 0.03-0.05 vertically. The electron cloud instability enlarges the positron beam size at high currents but is reduced by a solenoidal field on the vacuum chambers. The beam currents in PEP-II are being raised to increase the number of bunches and the luminosity. Over the next few years the luminosity goal for PEP-II is 10/sup 34//cm/sup 2//s.\",\"PeriodicalId\":313758,\"journal\":{\"name\":\"PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268)\",\"volume\":\"22 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2001-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PAC.2001.988178\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PAC.2001.988178","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

摘要

PEP-II e/sup +/e/sup -/对撞机已经与BaBar探测器在Upsilon 4S共振能量下运行了两年。峰值光度达到3.3 /spl倍/ 10/sup 33/ cm/sup 2/ s,有693束,正电子电流为1.5 a,电子电流为0.8 a。PEP-II已经向BaBar交付了超过38fb /sup -1/ /的数据。波束调移极限水平接近0.05 ~ 0.07,垂直接近0.03 ~ 0.05。电子云的不稳定性在高电流下增大了正电子束的尺寸,但在真空室上施加螺线管场会减小正电子束的尺寸。PEP-II中的光束电流被提高,以增加束的数量和光度。在接下来的几年里,PEP-II的亮度目标是10/sup 34//cm/sup 2//s。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Status and future plans of the PEP-II B-factory
The PEP-II e/sup +/e/sup -/ collider has been operating for two years with the BaBar detector at the energy of the Upsilon 4S resonance. The peak luminosity has reached 3.3 /spl times/ 10/sup 33//cm/sup 2//s with 693 bunches with a positron current of 1.5 A and an electron current of 0.8 A. PEP-II has delivered in excess of 38 fb/sup -1/ of data to BaBar. The beam-beam tune shift limits are approaching 0.05-0.07 horizontally and 0.03-0.05 vertically. The electron cloud instability enlarges the positron beam size at high currents but is reduced by a solenoidal field on the vacuum chambers. The beam currents in PEP-II are being raised to increase the number of bunches and the luminosity. Over the next few years the luminosity goal for PEP-II is 10/sup 34//cm/sup 2//s.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信