Nenad Jovanović
{"title":"Angažovanje generatora i potrebe balansnih rezervi u prisustvu intermitentnih OIE: Studija slučaja elektroenergetskog sistema Srbije","authors":"Nenad Jovanović","doi":"10.46793/eee22-3.16j","DOIUrl":null,"url":null,"abstract":"Intermittent electricity generation of the various renewable energy sources sets additional burden on generation unit dispatching and reserve planning in day-ahead electricity market. The conventional unit commitment models which include rump-up and rump-down limits are usually presented with stepwise mathematical functions without clear distinction between power and energy. This paper presents a case study of generation unit dispatching planning approach for the case of pricewise-linear functions from one time interval to another, taking into account actual ramping trajectories thus providing more efficient reserve scheduling particularly during generators’ start-up and shut-down processes. For the representation of reserve schedules, the 10-min and 30-min ramp capabilities of the generation units are assumed where they are obliged to provide secondary, tertiary and offline-tertiary reserves depending on their technical capabilities. The Serbian power system case study represents a 24-hour unit commitment planning and up/down secondary and tertiary reserve requirements during a scarcity event when reserve flexibility of neighbouring power systems cannot be utilised. Formulation of the optimisation mathematical model is performed via GAMS, the General Algebraic Modelling System, and CPLEX optimiser is used for problem optimisation purposes.","PeriodicalId":236996,"journal":{"name":"Energija, ekonomija, ekologija","volume":"175 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Energija, ekonomija, ekologija","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46793/eee22-3.16j","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

各种可再生能源的间歇性发电给日前电力市场的发电机组调度和备用规划带来了额外的负担。传统的机组承诺模型包括上下限和下下限,通常用逐步数学函数表示,没有明确区分功率和能量。本文给出了考虑实际斜坡轨迹的从一个时间区间到另一个时间区间的价格线性函数的发电机组调度规划方法的实例研究,从而提供了更有效的备用调度,特别是在发电机的启动和关闭过程中。对于备用计划的表示,假设发电机组的10分钟和30分钟斜坡能力,根据其技术能力,它们有义务提供二级、三级和离线三级储备。塞尔维亚电力系统案例研究代表了一个24小时的单位承诺规划和在短缺事件中,当邻近电力系统的储备灵活性无法利用时,上下二级和三级储备需求。优化数学模型的制定通过GAMS(通用代数建模系统)执行,CPLEX优化器用于问题优化目的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Angažovanje generatora i potrebe balansnih rezervi u prisustvu intermitentnih OIE: Studija slučaja elektroenergetskog sistema Srbije
Intermittent electricity generation of the various renewable energy sources sets additional burden on generation unit dispatching and reserve planning in day-ahead electricity market. The conventional unit commitment models which include rump-up and rump-down limits are usually presented with stepwise mathematical functions without clear distinction between power and energy. This paper presents a case study of generation unit dispatching planning approach for the case of pricewise-linear functions from one time interval to another, taking into account actual ramping trajectories thus providing more efficient reserve scheduling particularly during generators’ start-up and shut-down processes. For the representation of reserve schedules, the 10-min and 30-min ramp capabilities of the generation units are assumed where they are obliged to provide secondary, tertiary and offline-tertiary reserves depending on their technical capabilities. The Serbian power system case study represents a 24-hour unit commitment planning and up/down secondary and tertiary reserve requirements during a scarcity event when reserve flexibility of neighbouring power systems cannot be utilised. Formulation of the optimisation mathematical model is performed via GAMS, the General Algebraic Modelling System, and CPLEX optimiser is used for problem optimisation purposes.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信