尼泊尔城市道路建设项目战略风险管理实践

A. Mishra
{"title":"尼泊尔城市道路建设项目战略风险管理实践","authors":"A. Mishra","doi":"10.24321/2393.8307.202003","DOIUrl":null,"url":null,"abstract":"Risk management effectiveness assures project success. The overall objective of this research is to analyze the risk management practice in an urban road construction project with a case of Shiddharthanagar Municipality, Rupandehi, Nepal from contractor’s and client’s perspective. This research is based on a scheduled questionnaire survey to collect the primary data using convenient sampling of the partially or fully completed project. Contractors are quite aware of risk management and the percentage of awareness is even higher among the clients. The feedback from a similar project was used as the main method to identify the potential risk of the project from both contractor’s and client’s perspective. Direct judgment method is used maximum to the analyzed risk of the project from the contractor’s perspective as well as scenario analysis from the client’s perspective. Monitor the risk and prepare a contingency plan is used mostly for risk response of the project from both contractor’s and client’s perspective. An alternative plan, subjective judgment, close supervision, increment of resources and change in construction methods were applied as a preventive and remedial strategy. Risk should be managed by the one who is capable of managing the particular risk by managing contractual obligation with proper contract administration practices for ensuring the project objectives. There should be a risk register at the site and a frequent meeting should be conducted to identify the risks. These identified risks should be documented properly to ensure expertise for future projects.","PeriodicalId":402805,"journal":{"name":"Journal of Advanced Research in Civil and Environmental Engineering","volume":"168 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-05-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Strategic Risk Management Practice in Urban Road Construction Project of Nepal\",\"authors\":\"A. Mishra\",\"doi\":\"10.24321/2393.8307.202003\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Risk management effectiveness assures project success. The overall objective of this research is to analyze the risk management practice in an urban road construction project with a case of Shiddharthanagar Municipality, Rupandehi, Nepal from contractor’s and client’s perspective. This research is based on a scheduled questionnaire survey to collect the primary data using convenient sampling of the partially or fully completed project. Contractors are quite aware of risk management and the percentage of awareness is even higher among the clients. The feedback from a similar project was used as the main method to identify the potential risk of the project from both contractor’s and client’s perspective. Direct judgment method is used maximum to the analyzed risk of the project from the contractor’s perspective as well as scenario analysis from the client’s perspective. Monitor the risk and prepare a contingency plan is used mostly for risk response of the project from both contractor’s and client’s perspective. An alternative plan, subjective judgment, close supervision, increment of resources and change in construction methods were applied as a preventive and remedial strategy. Risk should be managed by the one who is capable of managing the particular risk by managing contractual obligation with proper contract administration practices for ensuring the project objectives. There should be a risk register at the site and a frequent meeting should be conducted to identify the risks. These identified risks should be documented properly to ensure expertise for future projects.\",\"PeriodicalId\":402805,\"journal\":{\"name\":\"Journal of Advanced Research in Civil and Environmental Engineering\",\"volume\":\"168 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-05-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Advanced Research in Civil and Environmental Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24321/2393.8307.202003\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Advanced Research in Civil and Environmental Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24321/2393.8307.202003","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

风险管理的有效性保证了项目的成功。本研究的总体目的是分析风险管理实践在城市道路建设项目中,以希达尔塔纳加尔市,鲁潘德希,尼泊尔从承包商和客户的角度来看。本研究是基于一个预定的问卷调查,以收集主要数据,使用方便的抽样部分或全部完成的项目。承包商非常了解风险管理,而客户的风险管理意识比例甚至更高。从类似项目的反馈作为主要方法,从承包商和客户的角度确定项目的潜在风险。最大限度地使用直接判断法,从承包商的角度分析项目的风险,从客户的角度进行情景分析。监控风险和准备应急计划主要用于从承包商和客户的角度对项目进行风险应对。采用备选方案、主观判断、密切监督、增加资源和改变施工方法作为预防和补救策略。风险应该由有能力管理特定风险的人来管理,通过适当的合同管理实践来管理合同义务,以确保项目目标。应在现场建立风险登记册,并应经常召开会议以识别风险。这些确定的风险应该被适当地记录下来,以确保未来项目的专业知识。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Strategic Risk Management Practice in Urban Road Construction Project of Nepal
Risk management effectiveness assures project success. The overall objective of this research is to analyze the risk management practice in an urban road construction project with a case of Shiddharthanagar Municipality, Rupandehi, Nepal from contractor’s and client’s perspective. This research is based on a scheduled questionnaire survey to collect the primary data using convenient sampling of the partially or fully completed project. Contractors are quite aware of risk management and the percentage of awareness is even higher among the clients. The feedback from a similar project was used as the main method to identify the potential risk of the project from both contractor’s and client’s perspective. Direct judgment method is used maximum to the analyzed risk of the project from the contractor’s perspective as well as scenario analysis from the client’s perspective. Monitor the risk and prepare a contingency plan is used mostly for risk response of the project from both contractor’s and client’s perspective. An alternative plan, subjective judgment, close supervision, increment of resources and change in construction methods were applied as a preventive and remedial strategy. Risk should be managed by the one who is capable of managing the particular risk by managing contractual obligation with proper contract administration practices for ensuring the project objectives. There should be a risk register at the site and a frequent meeting should be conducted to identify the risks. These identified risks should be documented properly to ensure expertise for future projects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信