通过集成自动化物料处理系统和设备设计,实现300mm半导体制造的设备再利用

S. Seall, D. Steele, M. Jung
{"title":"通过集成自动化物料处理系统和设备设计,实现300mm半导体制造的设备再利用","authors":"S. Seall, D. Steele, M. Jung","doi":"10.1109/ASMC.2006.1638764","DOIUrl":null,"url":null,"abstract":"This paper describes issues faced by Intel during planning for its first conversion of an existing high volume 200mm semiconductor factory to manufacturing on 300mm wafers. A summary of the constraints and challenges, analysis of alternatives, and description of the adopted solution for modifying AMHS and facility design to allow re-use of an existing 200mm semiconductor fab for manufacturing semiconductors on 300mm wafers is discussed","PeriodicalId":407645,"journal":{"name":"The 17th Annual SEMI/IEEE ASMC 2006 Conference","volume":"87 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-05-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Enabling Facility Re-Use for 300mm Semiconductor Manufacturing via Integration of Automated Material Handling System and Facility Design\",\"authors\":\"S. Seall, D. Steele, M. Jung\",\"doi\":\"10.1109/ASMC.2006.1638764\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper describes issues faced by Intel during planning for its first conversion of an existing high volume 200mm semiconductor factory to manufacturing on 300mm wafers. A summary of the constraints and challenges, analysis of alternatives, and description of the adopted solution for modifying AMHS and facility design to allow re-use of an existing 200mm semiconductor fab for manufacturing semiconductors on 300mm wafers is discussed\",\"PeriodicalId\":407645,\"journal\":{\"name\":\"The 17th Annual SEMI/IEEE ASMC 2006 Conference\",\"volume\":\"87 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-05-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The 17th Annual SEMI/IEEE ASMC 2006 Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ASMC.2006.1638764\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The 17th Annual SEMI/IEEE ASMC 2006 Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ASMC.2006.1638764","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文描述了英特尔在计划将现有的大批量200mm半导体工厂首次转换为300mm晶圆制造时所面临的问题。总结了限制和挑战,分析了替代方案,并描述了采用的解决方案,以修改AMHS和设施设计,允许重新使用现有的200mm半导体晶圆制造300mm晶圆上的半导体
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Enabling Facility Re-Use for 300mm Semiconductor Manufacturing via Integration of Automated Material Handling System and Facility Design
This paper describes issues faced by Intel during planning for its first conversion of an existing high volume 200mm semiconductor factory to manufacturing on 300mm wafers. A summary of the constraints and challenges, analysis of alternatives, and description of the adopted solution for modifying AMHS and facility design to allow re-use of an existing 200mm semiconductor fab for manufacturing semiconductors on 300mm wafers is discussed
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信