{"title":"配电网控制自动化算法的开发与实现","authors":"D. Bliznyuk","doi":"10.1109/RPA.2018.8537215","DOIUrl":null,"url":null,"abstract":"Reliability of electric power supply to consumers depends on reliability of distribution grids. Phase-to-phase faults (PPF) and line-to-ground faults (LGF), which occur at elements of the 6–20 kV distribution grid, may lead to a temporary loss of loads. Complete restoration of power supply is possible only after the response actions by the field service team (FST). Team personnel need a considerable amount of time (30–80 min) to isolate the fault by performing local sequential switchovers at several substations.","PeriodicalId":345204,"journal":{"name":"2018 International Youth Scientific and Technical Conference Relay Protection and Automation (RPA)","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Development and Implementation of Distribution Grid Control Automation Algorithms\",\"authors\":\"D. Bliznyuk\",\"doi\":\"10.1109/RPA.2018.8537215\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Reliability of electric power supply to consumers depends on reliability of distribution grids. Phase-to-phase faults (PPF) and line-to-ground faults (LGF), which occur at elements of the 6–20 kV distribution grid, may lead to a temporary loss of loads. Complete restoration of power supply is possible only after the response actions by the field service team (FST). Team personnel need a considerable amount of time (30–80 min) to isolate the fault by performing local sequential switchovers at several substations.\",\"PeriodicalId\":345204,\"journal\":{\"name\":\"2018 International Youth Scientific and Technical Conference Relay Protection and Automation (RPA)\",\"volume\":\"17 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 International Youth Scientific and Technical Conference Relay Protection and Automation (RPA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/RPA.2018.8537215\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 International Youth Scientific and Technical Conference Relay Protection and Automation (RPA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RPA.2018.8537215","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Development and Implementation of Distribution Grid Control Automation Algorithms
Reliability of electric power supply to consumers depends on reliability of distribution grids. Phase-to-phase faults (PPF) and line-to-ground faults (LGF), which occur at elements of the 6–20 kV distribution grid, may lead to a temporary loss of loads. Complete restoration of power supply is possible only after the response actions by the field service team (FST). Team personnel need a considerable amount of time (30–80 min) to isolate the fault by performing local sequential switchovers at several substations.