{"title":"提高生产效率的生产线平衡装配实施分析","authors":"Kurbandi Satpatmantya Budi Rochayata, Wening Ken Widodasih","doi":"10.55927/fjmr.v2i5.3797","DOIUrl":null,"url":null,"abstract":"This research was conducted at PT. TRIN which produces automotive spare parts. The Line Balancing Assembly method is used to minimize the time needed to complete one unit of product. This research was conducted by collecting primary data and conducting interviews with workers at each work station. The results of the study show that the application of the Line Balancing Assembly method can increase productivity at PT. TRIN on the X30 production process originally the number of production reached 26 pcs/hour , after the Line Balancing Assembly method was applied it became 28 pcs/hour or an increase of 7.70%. This study provides recommendations for other companies wishing to increase productivity by applying similar methods to their processes.","PeriodicalId":373869,"journal":{"name":"Formosa Journal of Multidisciplinary Research","volume":"148 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-05-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Analysis of the Line Balancing Assembly Implementation to Increase Productivity\",\"authors\":\"Kurbandi Satpatmantya Budi Rochayata, Wening Ken Widodasih\",\"doi\":\"10.55927/fjmr.v2i5.3797\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This research was conducted at PT. TRIN which produces automotive spare parts. The Line Balancing Assembly method is used to minimize the time needed to complete one unit of product. This research was conducted by collecting primary data and conducting interviews with workers at each work station. The results of the study show that the application of the Line Balancing Assembly method can increase productivity at PT. TRIN on the X30 production process originally the number of production reached 26 pcs/hour , after the Line Balancing Assembly method was applied it became 28 pcs/hour or an increase of 7.70%. This study provides recommendations for other companies wishing to increase productivity by applying similar methods to their processes.\",\"PeriodicalId\":373869,\"journal\":{\"name\":\"Formosa Journal of Multidisciplinary Research\",\"volume\":\"148 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-05-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Formosa Journal of Multidisciplinary Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.55927/fjmr.v2i5.3797\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Formosa Journal of Multidisciplinary Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55927/fjmr.v2i5.3797","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

这项研究是在生产汽车零部件的PT. TRIN公司进行的。生产线平衡装配法用于最大限度地减少完成一件产品所需的时间。本研究通过收集原始数据和对每个工作站的工人进行访谈来进行。研究结果表明,在X30生产工艺上,采用线平衡装配方法可以提高PT. TRIN的生产率,最初的生产数量达到26件/小时,采用线平衡装配方法后,生产数量达到28件/小时,提高了7.70%。本研究为其他希望通过对其流程应用类似方法来提高生产率的公司提供了建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis of the Line Balancing Assembly Implementation to Increase Productivity
This research was conducted at PT. TRIN which produces automotive spare parts. The Line Balancing Assembly method is used to minimize the time needed to complete one unit of product. This research was conducted by collecting primary data and conducting interviews with workers at each work station. The results of the study show that the application of the Line Balancing Assembly method can increase productivity at PT. TRIN on the X30 production process originally the number of production reached 26 pcs/hour , after the Line Balancing Assembly method was applied it became 28 pcs/hour or an increase of 7.70%. This study provides recommendations for other companies wishing to increase productivity by applying similar methods to their processes.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信