{"title":"生物质发电厂原料采购体系建立的项目管理","authors":"Wang He, Jiang Lu-quan, G. Haiying","doi":"10.1109/ICSSSM.2014.6874028","DOIUrl":null,"url":null,"abstract":"With the drawbacks of traditionally power generation becoming increasingly prominent, production of electricity from new energy attracts more and more attention instead. Biomass power, as a sort of new energy generation, typically of lower carbon and better environmental protection, has a significant potential for development. Based on PMBOK's five process groups, this paper mainly discussed the construction of material procurement system, and the involved issues arousing high attention. Implemented by the material procurement system at biomass power plant, the applications in project management are expanded.","PeriodicalId":206364,"journal":{"name":"2014 11th International Conference on Service Systems and Service Management (ICSSSM)","volume":"46 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-06-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Project management on the establishment of raw material procurement system for biomass power plant\",\"authors\":\"Wang He, Jiang Lu-quan, G. Haiying\",\"doi\":\"10.1109/ICSSSM.2014.6874028\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"With the drawbacks of traditionally power generation becoming increasingly prominent, production of electricity from new energy attracts more and more attention instead. Biomass power, as a sort of new energy generation, typically of lower carbon and better environmental protection, has a significant potential for development. Based on PMBOK's five process groups, this paper mainly discussed the construction of material procurement system, and the involved issues arousing high attention. Implemented by the material procurement system at biomass power plant, the applications in project management are expanded.\",\"PeriodicalId\":206364,\"journal\":{\"name\":\"2014 11th International Conference on Service Systems and Service Management (ICSSSM)\",\"volume\":\"46 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-06-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 11th International Conference on Service Systems and Service Management (ICSSSM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICSSSM.2014.6874028\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 11th International Conference on Service Systems and Service Management (ICSSSM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSSSM.2014.6874028","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Project management on the establishment of raw material procurement system for biomass power plant
With the drawbacks of traditionally power generation becoming increasingly prominent, production of electricity from new energy attracts more and more attention instead. Biomass power, as a sort of new energy generation, typically of lower carbon and better environmental protection, has a significant potential for development. Based on PMBOK's five process groups, this paper mainly discussed the construction of material procurement system, and the involved issues arousing high attention. Implemented by the material procurement system at biomass power plant, the applications in project management are expanded.