利用成熟海上资产的价值:X油田近期酸增产作业的成功

A. Ganiyu, M. Burgess, Aghogho Eyeregba, Jules Vesters, Chukwu Festus, Olufemi Adebayo, Oyewole Anthony
{"title":"利用成熟海上资产的价值:X油田近期酸增产作业的成功","authors":"A. Ganiyu, M. Burgess, Aghogho Eyeregba, Jules Vesters, Chukwu Festus, Olufemi Adebayo, Oyewole Anthony","doi":"10.2118/217189-ms","DOIUrl":null,"url":null,"abstract":"\n Field X is a mature offshore field in the Niger Delta. In 2013, several wells in field X experienced significant production decline and a study conducted by cross-functional team identified fines migration as the primary cause of sandface impairment and acid stimulation was recommended as remediation for the damage. This technical work highlights the strategies and methodology adopted in implementing acid stimulation in field X.\n The approach to candidate selection involved screening of historical well test data and pressure transient analyses (PTA) database for impaired/at-risk completions. Typical selection criteria are productivity index (PI) degradation (> 50%), pressure drop due to near wellbore skin (DP skin >500psi), violation of flux constraint, Interval Control Valve (ICV) integrity (dual completion) and water-cut evolution (<5.0%). The team also piloted diversion agents in the field to improve stimulation in wells with high water-cut. A novel method of using dynamic positioning marine vessel with Remotely Operated Vehicle (ROV) and customized dual conduit Coil Tubing (CT) have been deployed to bullhead acid into the formation.\n In the last two campaigns executed in 2020 & 2021, this ingenious way of harnessing value from field X has resulted to combined incremental Initial Production (IP) gain of approximately 10,000 bopd and safeguarded completion of a critical oil producer (~11,000 bopd). The total project cost for the two campaigns was ~$25.4 million resulting in significant cost savings (>$51.6 million) compared to rig operations. The use of cross-functional team, robust candidate selection, continuous lookback and adoption of best practices were critical to successful execution. Some challenges being experienced in the field are lack of adequate injectivity, formation lock-up, increasing gas oil ratio (GOR) and increasing water-cut. The team plans to deploy diverters across additional high water-cut wells in future campaigns.","PeriodicalId":407977,"journal":{"name":"Day 3 Wed, August 02, 2023","volume":"429 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-07-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Harnessing Value from Mature Offshore Asset: Successes from Recent Acid Stimulation Campaigns in Field X\",\"authors\":\"A. Ganiyu, M. Burgess, Aghogho Eyeregba, Jules Vesters, Chukwu Festus, Olufemi Adebayo, Oyewole Anthony\",\"doi\":\"10.2118/217189-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Field X is a mature offshore field in the Niger Delta. In 2013, several wells in field X experienced significant production decline and a study conducted by cross-functional team identified fines migration as the primary cause of sandface impairment and acid stimulation was recommended as remediation for the damage. This technical work highlights the strategies and methodology adopted in implementing acid stimulation in field X.\\n The approach to candidate selection involved screening of historical well test data and pressure transient analyses (PTA) database for impaired/at-risk completions. Typical selection criteria are productivity index (PI) degradation (> 50%), pressure drop due to near wellbore skin (DP skin >500psi), violation of flux constraint, Interval Control Valve (ICV) integrity (dual completion) and water-cut evolution (<5.0%). The team also piloted diversion agents in the field to improve stimulation in wells with high water-cut. A novel method of using dynamic positioning marine vessel with Remotely Operated Vehicle (ROV) and customized dual conduit Coil Tubing (CT) have been deployed to bullhead acid into the formation.\\n In the last two campaigns executed in 2020 & 2021, this ingenious way of harnessing value from field X has resulted to combined incremental Initial Production (IP) gain of approximately 10,000 bopd and safeguarded completion of a critical oil producer (~11,000 bopd). The total project cost for the two campaigns was ~$25.4 million resulting in significant cost savings (>$51.6 million) compared to rig operations. The use of cross-functional team, robust candidate selection, continuous lookback and adoption of best practices were critical to successful execution. Some challenges being experienced in the field are lack of adequate injectivity, formation lock-up, increasing gas oil ratio (GOR) and increasing water-cut. The team plans to deploy diverters across additional high water-cut wells in future campaigns.\",\"PeriodicalId\":407977,\"journal\":{\"name\":\"Day 3 Wed, August 02, 2023\",\"volume\":\"429 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Wed, August 02, 2023\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/217189-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Wed, August 02, 2023","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/217189-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

X油田是尼日尔三角洲的一个成熟海上油田。2013年,X油田的几口井出现了明显的产量下降,跨职能团队进行的一项研究发现,细粒运移是导致地面损害的主要原因,并建议采用酸化措施进行补救。这项技术工作强调了在x油田实施酸增产所采用的策略和方法。选择备选方案的方法包括筛选历史试井数据和压力瞬态分析(PTA)数据库,以针对受损/有风险的完井。典型的选择标准是产能指数(PI)下降(> 50%)、近井筒表皮压降(DP表皮>500psi)、违反通量限制、间隔控制阀(ICV)完整性(双完井)和与钻机作业相比的含水率变化(5160万美元)。使用跨职能团队、稳健的候选人选择、持续回顾和采用最佳实践是成功执行的关键。该油田面临的挑战包括注入能力不足、地层锁闭、油气比(GOR)增加和含水率增加。该团队计划在未来的作业中在更多的高含水井中部署暂堵剂。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Harnessing Value from Mature Offshore Asset: Successes from Recent Acid Stimulation Campaigns in Field X
Field X is a mature offshore field in the Niger Delta. In 2013, several wells in field X experienced significant production decline and a study conducted by cross-functional team identified fines migration as the primary cause of sandface impairment and acid stimulation was recommended as remediation for the damage. This technical work highlights the strategies and methodology adopted in implementing acid stimulation in field X. The approach to candidate selection involved screening of historical well test data and pressure transient analyses (PTA) database for impaired/at-risk completions. Typical selection criteria are productivity index (PI) degradation (> 50%), pressure drop due to near wellbore skin (DP skin >500psi), violation of flux constraint, Interval Control Valve (ICV) integrity (dual completion) and water-cut evolution (<5.0%). The team also piloted diversion agents in the field to improve stimulation in wells with high water-cut. A novel method of using dynamic positioning marine vessel with Remotely Operated Vehicle (ROV) and customized dual conduit Coil Tubing (CT) have been deployed to bullhead acid into the formation. In the last two campaigns executed in 2020 & 2021, this ingenious way of harnessing value from field X has resulted to combined incremental Initial Production (IP) gain of approximately 10,000 bopd and safeguarded completion of a critical oil producer (~11,000 bopd). The total project cost for the two campaigns was ~$25.4 million resulting in significant cost savings (>$51.6 million) compared to rig operations. The use of cross-functional team, robust candidate selection, continuous lookback and adoption of best practices were critical to successful execution. Some challenges being experienced in the field are lack of adequate injectivity, formation lock-up, increasing gas oil ratio (GOR) and increasing water-cut. The team plans to deploy diverters across additional high water-cut wells in future campaigns.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信