{"title":"煤炭海上运输规划:Taboneo -泗水- Tuban -三宝垄案例研究","authors":"Silvia Dewi Kumalasari, Arif M Ar Rasyid, Setyo Nugroho, Achmad Mustakim","doi":"10.54324/jtt.v1i1.428","DOIUrl":null,"url":null,"abstract":"The main purpose of this study to give recommendations related route and size of the ship optimize in coal delivery with minimum criteria are unit cost and the needs of port facilities which include capacity of stockpiles, and loading unloading equipment. Based on the requirement to provide PLTU in Surabaya, Semarang, and Tuban. The coal supply is sent from Taboneo. Demand of each PLTU are 480.000 Tonnes/Yr., 330.000 Tonnes/Yr, and 180.000 Tonnes/Yr. Methods that used in this study are optimization linier programming method with transportation and ship assignment concept, ship design method based on sample design literation and port design method. The results of calculation showed that the best route is a system Port to Port, which are Taboneo- Surabaya, Taboneo-Semarang, and Taboneo-Tuban, vessel capacity 10.500 tons needs two fleets. Obtained the unit cost amounted Rp. 131,79/Ton.Nm. The destination port which selected to be designed in this research is one of three destination ports is Port of Tuban. It depends on smallest coal demand per year. Extensive area of stockpiles needed to provide PLTU Tuban are 140 m2. Grab Crane is loading unloading equipment that used in this port with productivity 1.000 ton/hour, and it needed 1 unit.    ","PeriodicalId":229685,"journal":{"name":"Jurnal Teknik Transportasi","volume":"190 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-04-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Perencanaan Transportasi Laut Batubara: Studi Kasus Taboneo - Surabaya - Tuban - Semarang\",\"authors\":\"Silvia Dewi Kumalasari, Arif M Ar Rasyid, Setyo Nugroho, Achmad Mustakim\",\"doi\":\"10.54324/jtt.v1i1.428\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The main purpose of this study to give recommendations related route and size of the ship optimize in coal delivery with minimum criteria are unit cost and the needs of port facilities which include capacity of stockpiles, and loading unloading equipment. Based on the requirement to provide PLTU in Surabaya, Semarang, and Tuban. The coal supply is sent from Taboneo. Demand of each PLTU are 480.000 Tonnes/Yr., 330.000 Tonnes/Yr, and 180.000 Tonnes/Yr. Methods that used in this study are optimization linier programming method with transportation and ship assignment concept, ship design method based on sample design literation and port design method. The results of calculation showed that the best route is a system Port to Port, which are Taboneo- Surabaya, Taboneo-Semarang, and Taboneo-Tuban, vessel capacity 10.500 tons needs two fleets. Obtained the unit cost amounted Rp. 131,79/Ton.Nm. The destination port which selected to be designed in this research is one of three destination ports is Port of Tuban. It depends on smallest coal demand per year. Extensive area of stockpiles needed to provide PLTU Tuban are 140 m2. Grab Crane is loading unloading equipment that used in this port with productivity 1.000 ton/hour, and it needed 1 unit.    \",\"PeriodicalId\":229685,\"journal\":{\"name\":\"Jurnal Teknik Transportasi\",\"volume\":\"190 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-04-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Teknik Transportasi\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.54324/jtt.v1i1.428\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Transportasi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54324/jtt.v1i1.428","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本研究的主要目的是在单位成本和港口设施需求(包括库存能力和装卸设备)的最低标准下,给出有关煤炭运输的路线和船舶尺寸优化的建议。根据在泗水,三宝垄和土班提供PLTU的要求。煤炭供应是从塔伯诺运来的。每个PLTU的需求量为48万吨/年。、33万吨/年和18万吨/年。本研究采用的方法有运输船舶分配概念的优化线性规划方法、基于样本设计文献的船舶设计方法和港口设计方法。计算结果表明,最佳航线为系统港到港,分别为:塔巴尼奥-泗水、塔巴尼奥-三宝垄、塔巴尼奥-图班,船舶容量为10500吨,需要两个船队。得到单位成本为131.79卢比/吨纳米。本研究选择设计的目的港是三个目的港中的一个,即吐鲁番港。这取决于每年最小的煤炭需求。为PLTU Tuban提供所需的大量库存面积为140平方米。抓斗起重机是该港口使用的装卸设备,生产能力为1000吨/小时,需要1台。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Perencanaan Transportasi Laut Batubara: Studi Kasus Taboneo - Surabaya - Tuban - Semarang
The main purpose of this study to give recommendations related route and size of the ship optimize in coal delivery with minimum criteria are unit cost and the needs of port facilities which include capacity of stockpiles, and loading unloading equipment. Based on the requirement to provide PLTU in Surabaya, Semarang, and Tuban. The coal supply is sent from Taboneo. Demand of each PLTU are 480.000 Tonnes/Yr., 330.000 Tonnes/Yr, and 180.000 Tonnes/Yr. Methods that used in this study are optimization linier programming method with transportation and ship assignment concept, ship design method based on sample design literation and port design method. The results of calculation showed that the best route is a system Port to Port, which are Taboneo- Surabaya, Taboneo-Semarang, and Taboneo-Tuban, vessel capacity 10.500 tons needs two fleets. Obtained the unit cost amounted Rp. 131,79/Ton.Nm. The destination port which selected to be designed in this research is one of three destination ports is Port of Tuban. It depends on smallest coal demand per year. Extensive area of stockpiles needed to provide PLTU Tuban are 140 m2. Grab Crane is loading unloading equipment that used in this port with productivity 1.000 ton/hour, and it needed 1 unit.    
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信