基于兆瓦英里法的印度电力系统输电成本分配

Niranjan Kumar, Y. Reddy, D. Das, N. Padhy
{"title":"基于兆瓦英里法的印度电力系统输电成本分配","authors":"Niranjan Kumar, Y. Reddy, D. Das, N. Padhy","doi":"10.1109/PES.2010.5589459","DOIUrl":null,"url":null,"abstract":"Transmission access pricing is a key issue of restructuring and deregulation. Transmission pricing must be non-discriminatory, transparent, economically efficient, and allow full recovery of costs. In the case of electricity transmission system, economic efficiency implies promoting an optimal utilization of existing network, efficient siting of new generations and loads and promoting transmission investments. These characteristics require that the transmission circuits that pertain to each transaction must be identified and their costs properly allocated among users. Therefore cost allocation is a major issue in transmission access pricing and has given rise to a lot of methodologies. This paper presents an overview of MW-Mile method of transmission cost allocation. Under MW-Mile method there are a number of variants i.e. absolute, dominant and reverse in relation to how the cost of each circuit is allocated to the various users of the circuit. In India, with the enactment of Electricity Act, 2003 lay down the guide lines towards the transmission tariff sensitive to distance, direction and quantum of power flow.","PeriodicalId":177545,"journal":{"name":"IEEE PES General Meeting","volume":"39 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-07-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":"{\"title\":\"Transmission cost allocation by using MW-Mile approaches in a restructured Indian power system\",\"authors\":\"Niranjan Kumar, Y. Reddy, D. Das, N. Padhy\",\"doi\":\"10.1109/PES.2010.5589459\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Transmission access pricing is a key issue of restructuring and deregulation. Transmission pricing must be non-discriminatory, transparent, economically efficient, and allow full recovery of costs. In the case of electricity transmission system, economic efficiency implies promoting an optimal utilization of existing network, efficient siting of new generations and loads and promoting transmission investments. These characteristics require that the transmission circuits that pertain to each transaction must be identified and their costs properly allocated among users. Therefore cost allocation is a major issue in transmission access pricing and has given rise to a lot of methodologies. This paper presents an overview of MW-Mile method of transmission cost allocation. Under MW-Mile method there are a number of variants i.e. absolute, dominant and reverse in relation to how the cost of each circuit is allocated to the various users of the circuit. In India, with the enactment of Electricity Act, 2003 lay down the guide lines towards the transmission tariff sensitive to distance, direction and quantum of power flow.\",\"PeriodicalId\":177545,\"journal\":{\"name\":\"IEEE PES General Meeting\",\"volume\":\"39 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-07-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"9\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE PES General Meeting\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PES.2010.5589459\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE PES General Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PES.2010.5589459","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

摘要

输电接入定价是重组和放松管制的关键问题。输电定价必须是非歧视性的、透明的、经济有效的,并允许完全收回成本。就电力传输系统而言,经济效率意味着促进现有网络的最佳利用,新一代和负荷的有效选址以及促进传输投资。这些特点要求必须确定与每笔交易有关的传输电路,并在用户之间合理分配其费用。因此,成本分配是输电接入定价中的一个主要问题,并产生了许多方法。本文概述了输电成本分摊的兆瓦英里法。在MW-Mile方法下,与如何将每个电路的成本分配给电路的各种用户有关,有许多变体,即绝对的,主导的和反向的。在印度,随着2003年《电力法》的颁布,制定了对距离、方向和电量敏感的输电电价指导方针。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Transmission cost allocation by using MW-Mile approaches in a restructured Indian power system
Transmission access pricing is a key issue of restructuring and deregulation. Transmission pricing must be non-discriminatory, transparent, economically efficient, and allow full recovery of costs. In the case of electricity transmission system, economic efficiency implies promoting an optimal utilization of existing network, efficient siting of new generations and loads and promoting transmission investments. These characteristics require that the transmission circuits that pertain to each transaction must be identified and their costs properly allocated among users. Therefore cost allocation is a major issue in transmission access pricing and has given rise to a lot of methodologies. This paper presents an overview of MW-Mile method of transmission cost allocation. Under MW-Mile method there are a number of variants i.e. absolute, dominant and reverse in relation to how the cost of each circuit is allocated to the various users of the circuit. In India, with the enactment of Electricity Act, 2003 lay down the guide lines towards the transmission tariff sensitive to distance, direction and quantum of power flow.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信